HRVATSKI SABOR
15
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O JAMSTVU IZMEĐU REPUBLIKE HRVATSKE I EUROPSKE BANKE ZA OBNOVU I RAZVOJ ZA HEP GOGREEN PROJEKT
Proglašavam Zakon o potvrđivanju Ugovora o jamstvu između Republike Hrvatske i Europske banke za obnovu i razvoj za HEP GoGreen Projekt, koji je Hrvatski sabor donio na sjednici 28. ožujka 2025.
Klasa: 011-02/25-02/35
Urbroj: 71-10-01/1-25-2
Zagreb, 4. travnja 2025.
Predsjednik
Republike Hrvatske
Zoran Milanović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O JAMSTVU IZMEĐU REPUBLIKE HRVATSKE I EUROPSKE BANKE ZA OBNOVU I RAZVOJ ZA HEP GOGREEN PROJEKT
Članak 1.
Potvrđuje se Ugovor o jamstvu između Republike Hrvatske i Europske banke za obnovu i razvoj za HEP GoGreen Projekt, potpisan u Zagrebu 15. listopada 2024. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
GUARANTEE AGREEMENT
HEP GOGREEN PROJECT BETWEEN REPUBLIC OF CROATIA AND EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT
Dated 15 October 2024
GUARANTEE AGREEMENT
AGREEMENT dated 15 October 2024 between REPUBLIC OF CROATIA (the «Guarantor») and EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT (the «Bank»).
PREAMBLE
WHEREAS, the Guarantor and Hrvatska Elektroprivreda-dioničko društvo have requested assistance from the Bank in the financing of part of the Project;
WHEREAS, pursuant to a loan agreement dated the date hereof between Hrvatska Elektroprivreda-dioničko društvo as Borrower and the Bank (the «Loan Agreement» as defined in the Standard Terms and Conditions), the Bank has agreed to make a loan to the Borrower in the amount of EUR 31.62 million, subject to the terms and conditions set forth or referred to in the Loan Agreement, but only on the condition that the Guarantor guarantees the obligations of the Borrower under the Loan Agreement as provided in this Agreement; and
WHEREAS, the Guarantor, in consideration of the Bank entering into the Loan Agreement with the Borrower, has agreed to guarantee such obligations of the Borrower.
NOW, THEREFORE, the parties hereby agree as follows:
Article I
STANDARD TERMS AND CONDITIONS; DEFINITIONS
Section 1.01. Incorporation of Standard Terms and Conditions
All of the provisions of the Bank’s Standard Terms and Conditions dated 5 November 2021 are hereby incorporated into and made applicable to this Agreement with the same force and effect as if they were fully set forth herein, subject, however, to the modifications set out in the Loan Agreement.
Section 1.02. Definitions
Wherever used in this Agreement (including the Preamble), unless stated otherwise or the context otherwise requires, the terms defined in the Preamble have the respective meanings given to them therein, the terms defined in the Standard Terms and Conditions and the Loan Agreement have the respective meanings given to them therein and the following term has the following meaning:
Section 1.03. Interpretation
In this Agreement, a reference to a specified Article or Section shall, except where stated otherwise in this Agreement, be construed as a reference to that specified Article or Section of this Agreement.
Article II
GUARANTEE; OTHER OBLIGATIONS
Section 2.01. Guarantee
The Guarantor hereby unconditionally guarantees, as primary obligor and not as surety merely, the due and punctual payment of the following sums due under the Loan Agreement, whether at stated maturity, by acceleration or otherwise, and the punctual performance of all other obligations of the Borrower, in relation to the following:
(i) Tranche A: all principal, interest, and all Charges and expenses (howsoever expressed) payable in respect of the Tranche A Loan, representing not more than 80% of the total principal amount of the Loan from time to time; and
(ii) where any Charge, cost, expense, or award of damages or costs by any court or arbitrator, or similar amount (howsoever expressed) is payable in respect of both Tranche A and Tranche B of the Loan, the Guarantor shall guarantee due and punctual payment of an amount representing 80% of such amounts, provided that such Charges, costs or amounts shall not be included as Guaranteed Obligations to the extent they arise in respect of the Tranche B Loan only.
Section 2.02. Project Completion
(a) Whenever there is reasonable cause to believe that the funds available to the Borrower will be inadequate to meet the estimated expenditures and required for the carrying out of the Project, the Guarantor shall promptly take measures satisfactory to the Bank to provide the Borrower, or cause the Borrower to be provided, with such funds as are needed to meet such expenditures and requirements, to the extent permitted by applicable law.
(b) Without limiting the generality of any other provisions of this Agreement or the Standard Terms and Conditions, the Guarantor shall, on a best efforts basis, take steps to ensure that the Borrower is able to fulfil its obligations under the Loan Agreement, to the extent permitted by applicable law.
Article III
MISCELLANEOUS
Section 3.01. Notices
The following addresses are specified for purposes of Section 10.01 of the Standard Terms and Conditions, except that any notice shall be deemed to be delivered if by hand, mail, or in pdf or similar format by electronic mail:
For the Guarantor:
MINISTRY OF FINANCE OF THE REPUBLIC OF CROATIA
Katančićeva 5
10000 Zagreb
Croatia
Attention: Minister of Finance of the Republic of Croatia
Email: kabinet@mfin.hr
Telephone: +385 1 4591 300
For EBRD:
European Bank for Reconstruction and Development
5 Bank Street
London E14 4BG
United Kingdom
Attention: Banking Services / Operation No. 52803
Telephone: +44 20 7338 6000
Email: bankingservices@ebrd.com
Section 3.02. Legal Opinion
For purposes of Section 9.03(b) of the Standard Terms and Conditions and in accordance with Section 6.03(b) of the Loan Agreement, the opinion or opinions of counsel shall be given on behalf of the Guarantor by the Minister of Justice, Public Administration and Digital Transformation.
IN WITNESS WHEREOF the parties hereto, acting through their duly authorised representatives, have caused this Agreement to be signed in four copies and delivered at Zagreb, Croatia as of the day and year first above written.
REPUBLIC OF CROATIA
EUROPEAN BANK
FOR RECONSTRUCTION AND DEVELOPMENT
UGOVOR O JAMSTVU
HEP GOGREEN PROJEKT IZMEĐU REPUBLIKE HRVATSKE I EUROPSKE BANKE ZA OBNOVU I RAZVOJ
Dana 15. listopada 2024.
UGOVOR O JAMSTVU
UGOVOR od 15. listopada 2024. između REPUBLIKE HRVATSKE (»Jamac«) i EUROPSKE BANKE ZA OBNOVU I RAZVOJ (»Banka«).
PREAMBULA
BUDUĆI DA su Jamac i Hrvatska elektroprivreda – dioničko društvo zatražili pomoć Banke u financiranju dijela Projekta;
BUDUĆI DA je na temelju Ugovora o zajmu na ovdje navedeni datum između Hrvatske elektroprivrede – dioničkog društva kao Zajmoprimca i Banke (»Ugovor o zajmu« kako je određeno u Standardnim odredbama i uvjetima), Banka pristala odobriti zajam Zajmoprimcu u iznos od 31,62 milijuna EUR, sukladno odredbama i uvjetima navedenim ili na koje se poziva u Ugovoru o zajmu, ali samo pod uvjetom da Jamac jamči za obveze Zajmoprimca iz Ugovora o zajmu kako je navedeno u ovom Ugovoru; i
BUDUĆI da je Jamac, s obzirom na to da je Banka sklopila Ugovor o zajmu sa Zajmoprimcem, pristao jamčiti za takve obveze Zajmoprimca.
SADA SU SE, STOGA stranke sporazumjele kako slijedi:
Članak I
STANDARDNE ODREDBE I UVJETI; DEFINICIJE
Odjeljak 1.01. Uključivanje Standardnih odredbi i uvjeta
Sve odredbe Standardnih odredbi i uvjeta Banke od 5. studenoga 2021. ovime su ugrađene u ovaj Ugovor i primjenjive na njega s istom snagom i učinkom kao da su ovdje u cijelosti navedene, međutim, podložne izmjenama navedenim u Ugovoru o zajmu.
Odjeljak 1.02. Definicije
Kad god se upotrebljavaju u ovom Ugovoru (uključujući preambulu), osim ako nije drugačije navedeno ili ako kontekst drugačije ne zahtijeva, pojmovi definirani u preambuli imaju odgovarajuća značenja koja su im tamo dana, pojmovi definirani u Standardnim odredbama i uvjetima i Ugovoru o zajmu imaju ona značenja koja su im dana u istim, a sljedeći izraz ima značenje kako slijedi:
Odjeljak 1.03. Tumačenje
U ovom Ugovoru, pozivanje na određeni članak ili odjeljak, osim ako je drugačije navedeno u ovom Ugovoru, tumači se kao pozivanje na taj određeni članak ili odjeljak ovog Ugovora.
Članak II
JAMSTVO; OSTALE OBVEZE
Odjeljak 2.01. Jamstvo
Jamac ovime bezuvjetno jamči, kao primarni dužnik, a ne samo kao jamstvo, za dospjelo i pravovremeno plaćanje sljedećih iznosa koji dospijevaju prema Ugovoru o zajmu, bilo na navedeno dospijeće, ubrzanjem ili na neki drugi način, te pravovremeno izvršavanje svih ostalih obveza Zajmoprimca, u vezi sa sljedećim:
(i) Tranša A: sva glavnica, kamate i sve naknade i izdatci (ma kako izraženi) koji se plaćaju u vezi s tranšom A Zajma, a koji s vremena na vrijeme ne predstavljaju više od 80 % ukupnog iznosa glavnice Zajma; i
(ii) kada se bilo koja naknada, trošak, izdatak ili dodjela naknade štete ili troškova od strane bilo kojeg suda ili arbitra, ili sličan iznos (ma kako izražen) plati u odnosu na Tranšu A i Tranšu B Zajma, Jamac će jamčiti dospjelo i pravovremeno plaćanje iznosa koji predstavlja 80 % takvih iznosa, pod uvjetom da takve naknade, troškovi ili iznosi neće biti uključeni kao Zajamčene obveze u onoj mjeri u kojoj proizlaze samo u odnosu na tranšu B Zajma.
Odjeljak 2.02. Završetak Projekta
(a) Kad god postoji opravdan razlog vjerovati da sredstva dostupna Zajmoprimcu neće biti dostatna za podmirenje procijenjenih troškova potrebnih za provedbu Projekta, Jamac će odmah poduzeti mjere zadovoljavajuće za Banku kako bi Zajmoprimcu osigurao ili osigurao da se Zajmoprimcu osiguraju sredstva koja su potrebna za podmirenje takvih izdataka i zahtjeva u mjeri dopuštenoj primjenjivim pravom.
(b) Ne ograničavajući se na općenitost bilo kojih drugih odredbi ovog Ugovora ili Standardnih odredbi i uvjeta, Jamac će, koliko je to moguće, poduzeti korake kako bi se osigurao da je Zajmoprimac u mogućnosti ispunjavati svoje obveze iz Ugovora o zajmu, u mjeri dopuštenoj primjenjivim pravom.
Članak III
RAZNO
Odjeljak 3.01. Obavijesti
Sljedeće adrese navedene su za potrebe odjeljka 10.01. Standardnih odredbi i uvjeta, osim da će se svaka obavijest smatrati isporučenom ako je dostavljena osobno, poštom ili u pdf ili sličnom formatu elektroničkom poštom:
Za Jamca:
MINISTARSTVO FINANCIJA REPUBLIKE HRVATSKE
Katančićeva 5
10000 Zagreb
Republika Hrvatska
Na pažnju: ministar financija Republike Hrvatske
E-mail: kabinet@mfin.hr
Telefon: +385 1 4591 300
Za EBRD:
EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT
5 Bank Street
London E14 4BG
United Kingdom
Na pažnju: Banking Services / Operation No. 52803
Telefon: +44 20 7338 6000
Email: bankingservices@ebrd.com
Odjeljak 3.02. Pravno mišljenje
Za potrebe odjeljka 9.03.(b) Standardnih odredbi i uvjeta u skladu sa stavkom 6.03(b) Ugovora o zajmu, pravno mišljenje ili mišljenja dat će u ime Jamca ministar pravosuđa, uprave i digitalne transformacije.
U POTVRDU NAVEDENOG stranke su, djelujući preko svojih propisno ovlaštenih predstavnika, potpisale ovaj Ugovor u četiri primjerka i dostavile u Zagreb, Hrvatska na dan i godinu koja je prva gore navedena.
REPUBLIKA HRVATSKA
EUROPSKA BANKA
ZA OBNOVU I RAZVOJ
Članak 3.
Tekst Ugovora o zajmu između društva Hrvatska elektroprivreda d.d. i Europske banke za obnovu i razvoj za HEP GoGreen Projekt, potpisan 14. listopada 2024. u Zagrebu, u izvorniku na engleskom jeziku i prijevodu na hrvatski jezik glasi:
LOAN AGREEMENT
(HEP GOGREEN PROJECT) BETWEEN HRVATSKA ELEKTROPRIVREDA – DIONIČKO DRUŠTVO AND UROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT
Dated 14 October 2024
AGREEMENT dated 14 October 2024 between HRVATSKA ELEKTROPRIVREDA – DIONIČKO DRUŠTVO, a joint stock company organised in Croatia (the «Borrower») and EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT (the «Bank»).
PREAMBLE
WHEREAS, the Bank has been established to provide financing for specific projects to foster the transition towards open market-oriented economies and to promote private and entrepreneurial initiative in certain countries committed to and applying the principles of multiparty democracy, pluralism and market economics;
WHEREAS, the Borrower intends to implement the Project as described in Schedule 1;
WHEREAS, the Borrower has requested assistance from the Bank in financing part of the Project;
WHEREAS, the Borrower intends to contract a loan from European Investment Bank (the «Co-financier») in the amount of EUR 30.38 million to assist in financing the Project, subject the terms and conditions to be set forth in an agreement (the «Co-financing Agreement») between the Borrower and the Co-financier;
WHEREAS, pursuant to a guarantee agreement dated the date hereof between the Republic of Croatia as Guarantor and the Bank (the «Guarantee Agreement» as defined in the Standard Terms and Conditions), the Guarantor has guaranteed certain obligations of the Borrower under this Agreement; and
WHEREAS, the Bank has agreed to make a loan to the Borrower in the amount of EUR 31.62 million, subject to the terms and conditions set forth or referred to in this Agreement.
NOW, THEREFORE, the parties hereby agree as follows:
Article I
STANDARD TERMS AND CONDITIONS; DEFINITIONS
Section 1.01. Incorporation of Standard Terms and Conditions
All of the provisions of the Bank’s Standard Terms and Conditions dated 5 November 2021 are hereby incorporated into and made applicable to this Agreement with the same force and effect as if they were fully set forth herein, subject, however, to the following modifications (such provisions as so modified are hereinafter called the «Standard Terms and Conditions»):
(a) Sections 3.04(b)(iii) and 3.05(a) and (b) of the Standard Terms and Conditions shall not apply to this Agreement.
(b) the definition of «Margin» in Section 2.02 of the Standard Terms and Conditions shall not apply to this Agreement.
(c) Section 3.09(a)(ii) of the Standard Terms and Conditions shall be modified to read: «(ii) the applicable Margin(s) set out in Section 2.02(a) of the Loan Agreement.»
(d) Section 3.13(a)(1)(A) of the Standard Terms and Conditions shall be modified to read: «(A) the applicable Margin(s) set out in Section 2.02(a) of the Loan Agreement.»
Section 1.02. Definitions
Wherever used in this Agreement (including the Preamble and Schedules), unless stated otherwise or the context otherwise requires, the terms defined in the Preamble have the respective meanings given to them therein, the terms defined in the Standard Terms and Conditions have the respective meanings given to them therein, the terms defined in Schedule 5 have the respective meanings given to them therein, and the following terms have the following meanings:
Section 1.03. Interpretation
In this Agreement, a reference to a specified Article, Section or Schedule shall, except where stated otherwise in this Agreement, be construed as a reference to that specified Article or Section of, or Schedule to, this Agreement.
Article II
PRINCIPAL TERMS OF THE LOAN
Section 2.01. Amount and Currency
(a) The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, the amount of EUR 31.62 million.
(b) The Loan shall consist of two tranches, as follows:
(1) tranche A («Tranche A») in the amount of EUR 25,296,000.00 (the «Tranche A Loan»); and
(2) tranche B («Tranche B») in the amount of EUR 6,324,000.00 (the «Tranche B Loan»).
(c) The Bank shall disburse the Loan by drawing from the Available Amounts under the Tranche A Loan and the Tranche B Loan, pro rata, in 80:20 proportion. If the Bank cancels any portion of the Loan in accordance with the terms of this Agreement it will cancel amounts under Tranche A and Tranche B, pro rata, in 80:20 proportion.
(d) Notwithstanding anything in this Agreement to the contrary, the obligation of the Bank to make any disbursement shall also be subject to the condition that the aggregate amount of the Loan disbursed by the Bank shall not at any time exceed 2x the aggregate amounts theretofore or contemporaneously disbursed under the Co-financing Agreement, provided that the Bank shall be entitled to disburse (i) up to EUR 5 million in order to finance the advance payment, without regard to the loan proportion above.
Section 2.02. Interest and Other Financial Terms of the Loan
(a) Each Tranche of the Loan shall be subject to a Variable Interest Rate calculated in accordance with Section 3.04 of the Standard Terms and Conditions, such rate being the sum of the Margin and, subject to Section 3.13, the Relevant Market Interest Rate. The following Margins shall apply:
(1) Tranche A Loan: 1.00% per annum;
(2) Tranche B Loan: 1.75% per annum;
(3) where the Bank makes a disbursement in the proportion set out in Section 2.01(c), a notional blended Margin of 1.15% per annum shall apply (reflecting the weighted average of the rate set out in sub-sections (1) and (2) above), provided that where any payment or repayment results in a proportion between the outstanding amounts under the Tranche A Loan and the Tranche B Loan other than that set out in Section 2.01(c), the Margin shall be calculated and payable on the basis of the individual Margins set out in (1) and (2) above.
(b) The Minimum Drawdown Amount shall be EUR 2,000,000.
(c) The Minimum Prepayment Amount shall be EUR 2,000,000.
(d) The Minimum Cancellation Amount shall be EUR 2,000,000.
(e) The Interest Payment Dates shall be 15 March and 15 September of each year.
(f) (1) The Borrower shall repay the Loan in 25 equal (or as nearly equal as possible) semi-annual instalments on 15 March, and 15 September of each year, with the first Loan Repayment Date being 15 September 2027 and the last Loan Repayment Date being 15 September 2039.
(2) The Bank shall allocate all principal repayments or prepayments by or on behalf of the Borrower against Tranche A and Tranche B so as to maintain the 80:20 proportion between the tranches, except if payments are made by the Guarantor pursuant to the Guarantee Agreement, in which case the Bank shall allocate such payments against Tranche A only.
(3) Notwithstanding the foregoing, in the event that (i) the Borrower does not draw down the entire Loan amount prior to the first Loan Repayment Date specified in this Section 2.02.(e), and (ii) the Bank extends the Last Availability Date specified in Section 2.02.(f) below to a date which falls after such first Loan Repayment Date, then the amount of each drawdown made on or after the first Loan Repayment Date shall, for each Tranche, be allocated for repayment in equal amounts to the several Loan Repayment Dates which fall after the date of such drawdown (with the Bank adjusting the amounts so allocated as necessary so as to achieve whole numbers in each case). The Bank shall, from time to time, notify the Borrower of such allocations.
(g) The Last Availability Date shall be the third anniversary of this Loan Agreement, or such later date that the Bank may in its discretion establish and notify to the Borrower and the Guarantor.
(h) The Borrower shall pay to the Bank a Commitment Charge at the following rates:
(1) Tranche A: 0.50% per annum;
(2) Tranche B: 0.25% per annum;
(3) provided that where the Available Amounts under the Tranche A Loan and Tranche B Loan are in the proportion set out in Section 2.01(c), a notional blended Commitment Charge of 0.45% per annum shall apply (reflecting the weighted average Commitment Charge set out in sub-sections (1) and (2) above), provided that where any payment results in a different proportion between the Available Amounts for the Tranche A Loan and the Tranche B Loan than that set out in Section 2.01(c), the Commitment Charge shall be calculated and payable on the basis of the individual rates set out in sub-sections (1) and (2) above.
The Commitment Charge is payable on the total of the Available Amount for each Tranche. The Commitment Charge shall accrue from the date sixty (60) days after the date of the Loan Agreement and shall accrue and be calculated on the same basis as interest under Section 3.04(b)(ii) of the Standard Terms and Conditions. The Commitment Charge shall be payable on each Interest Payment Date (even though no interest may be payable on such date) commencing on the first Interest Payment Date following the Effective Date.
(i) The Borrower shall pay to the Bank a front-end commission equal to 0.85% of the principal amount of the Loan.
(j) The Borrower shall pay the Front-end Commission pursuant to Section 3.05(c) and (d) of the Standard Terms and Conditions, provided that the amount of the Front-end Commission payable to the Bank shall be reduced by the amount of any Appraisal Fee received by the Bank before the date of this Agreement pursuant to the terms of the Mandate Letter dated 14 September 2021.
Section 2.03. Drawdowns
(a) Drawdowns shall be made in accordance with Section 2.01(c) of this Agreement and Section 3.01 of the Standard Terms and Conditions using the form of Drawdown Application attached as Schedule 4.
(b) The Available Amount may be drawn down from time to time in accordance with the provisions of Schedule 2 to finance (1) expenditures made (or, if the Bank so agrees, to be made) in respect of the reasonable cost of goods, works and services required for the Project, and (2) the Front-end Commission.
(c) Unless waived by the Bank in advance, the Borrower shall at the time a drawdown application is made represent to EBRD that (i) it is in compliance with each of its obligations set out in this Agreement and each of the Project Agreements to which it is a party, and (ii) no event has occurred which is liable to affect materially and adversely its operations or financial condition or its ability to carry out the Project or to perform any of our obligations under this Agreement.
Article III
EXECUTION OF THE PROJECT
Section 3.01. Other Affirmative Project Covenants
In addition to the general undertakings set forth in Article IV of the Standard Terms and Conditions, the Borrower shall, unless the Bank otherwise agrees:
(a) Take all action necessary to provide adequate funds for the completion of the Project;
(b) Take all action necessary to achieve that the Co-financing Agreement becomes effective no later than one year after the date of this Agreement or such other date as the Bank has established in writing (the «Co-financing Deadline»).
(c) Take all necessary actions for commencement of the construction of the Power Plant as specified by the Construction Permit (i.e. by 21 June 2025) and initiation of a trial run (Croatian: «probni rad») of the Power Plant at the earliest commercially viable opportunity.
(d) Take all necessary actions to ensure that the Power Plant is fully operational within two years from the commencement of the trial run as outlined in point (c) above, which includes but is not limited to ensuring that the use permit (Croatian: «uporabna dozvola») for the Power Plant is issued and that Project Agreements, which were not concluded prior to the First Drawdown, and/or other agreements necessary for the Power Plant to become fully operational are concluded.
(e) Take all necessary actions to comply with the covenants set out in Section 3 of Schedule 5.
Section 3.02. Project Implementation Unit
In order to coordinate, manage, monitor and evaluate all aspects of Project implementation, including the procurement of goods, works and services as well as consultancy services for the Project, the Borrower shall, unless otherwise agreed with the Bank, establish and at all times during execution of the Project operate a project implementation unit with adequate resources and suitably qualified personnel, under terms of reference acceptable to the Bank.
Section 3.03. Procurement
For purposes of Section 4.03 of the Standard Terms and Conditions, the following provisions shall, except as the Bank otherwise agrees, govern procurement of goods, works and services as well as consultancy services required for the Project and to be financed out of the proceeds of the Loan:
(a) Goods, works and services, as well as consultancy services shall be procured through open competitive procedures.
(b) For purposes of Section 3.03(a), the procedures for open competitive are set out in Section III of the EBRD Procurement Rules.
(c) All contracts shall be subject to the review procedures set out in the EBRD Procurement Rules and shall be subject to prior review by the Bank.
(d) The Borrower shall use procurement methods which fully comply with the Bank’s requirements in relation to forced labour in the solar products supply chain and with ILO Core Conventions.
Section 3.04. Environmental and Social Compliance Covenants
Without limiting the generality of Sections 4.02(a), 4.04(a)(iii), and 5.02(c)(iii) of the Standard Terms and Conditions, the Borrower shall, unless the Bank otherwise agrees:
(a) Except as otherwise specified in the Environmental and Social Action Plan, the Borrower shall, and shall cause any contractor to, carry out the Project in accordance with the Designated Performance Requirements.
(b) Except as otherwise specified in the Environmental and Social Action Plan, the Borrower shall, and shall cause any contractor to, ensure that environmental and/or social risks and impacts arising from Associated Facilities are managed and mitigated in accordance with applicable law, good international practice and the objectives of the Designated Performance Requirements 1 to 8 and 10.
(c) Without limiting the foregoing, the Borrower shall diligently implement and adhere to the Environmental and Social Action Plan and monitor the implementation of such plan[s] in accordance with the monitoring provisions contained in such plans.
(d) The Borrower and the Bank may from time to time agree to amend the Environmental and Social Action Plan in response to changes in the circumstances of the Project or the Borrower, unforeseen events and the results of monitoring. Without limiting the generality of the foregoing,
(1) if there is any adverse environmental or social impact or issue that was not foreseen by or contemplated in the Environmental and Social Action Plan either entirely or as to its severity,
(2) if any impact mitigation measure set out in the Environmental and Social Action Plan is not sufficient to eliminate or reduce any environmental or social impact to the level contemplated by the relevant Designated Performance Requirements within the time frame set out in the Environmental and Social Action Plan, or
(3) if any material non-compliance with the Environmental and Social Action Plan or with any Environmental and Social Law has been identified by the Borrower, the Bank or an inspection from any regulatory or enforcement authority or by any audit conducted in accordance with Section 3.04(d),
the Borrower shall, as soon as reasonably practicable and subject to the consent of the Bank, develop and incorporate into the Environmental and Social Action Plan such additional or revised mitigation measures as may be necessary to achieve compliance with the Designated Performance Requirements, the Environmental and Social Action Plan or Environmental and Social Laws, in each case in a manner satisfactory to the Bank.
(e) The Borrower shall fully comply with the social and environmental provisions related to the solar supply chain set out in Schedule 5.
Section 3.05. Consultants
(a) In order to assist in the implementation of the Project, the Borrower shall, unless otherwise agreed with the Bank, employ or cause to be employed, as required, and use consultants whose qualifications, experience and terms of reference are satisfactory to the Bank, including consultants to assist in carrying out the Project study referred to in Section 3.06 and consultants to assist the Borrower in supervising the implementation of the Project.
(b) The Borrower shall provide, without charge, to any consultants engaged to assist in matters relating to the Project or the operations of the Borrower all facilities and support necessary for the carrying out of their functions, including office space, photocopying equipment and supplies, secretarial services and transportation, as well as all documents, materials and other information that may be relevant to their work.
Section 3.06. Reporting Frequency and Submission Requirements
(a) Commencing from the Effective Date, until the full amount of the Loan has been repaid or cancelled, the Borrower shall submit to the Bank annual reports on Environmental and Social Matters arising in relation to the Borrower or the Project, as referred to in Section 5.02(c)(iii) of the Standard Terms and Conditions, within 120 days after the end of the year being reported on. Such reports shall include information on the following specific matters:
(1) information on compliance by the Borrower with the Designated Performance Requirements as described in Section 3.04(a) and the implementation of the Environmental and Social Action Plan
(2) information on how the Borrower has monitored the compliance with the Designated Performance Requirements and the Environmental and Social Action Plan by any contractor engaged for the Project and a summary of any material non-compliance by such contractor with the Designated Performance Requirements and the Environmental and Social Action Plan and of any measures taken to remedy such non-compliance;
(3) information on implementation of the stakeholder engagement plan and grievance mechanism required by Designated Performance Requirement 10, including a summary of any grievances received and how such grievances were resolved;
(4) information on compliance by the Borrower with Environmental and Social Laws in relation to the Project, including a description of any claim, proceeding, order or investigation commenced or threatened against the Borrower, the status of any Authorisation required for the Project, the results of any inspection carried out by any regulatory authority, any violation of applicable laws, regulations or standards and any remedial action or fine relating to such violation, a summary of any material notice, report and other communication on Environmental and Social Matters relating to the Project submitted by the Borrower to any regulatory authority and any other circumstances giving rise to liability of the Borrower for any Environmental and Social Matter;
(5) information on occupational health and safety management and the occupational health and safety record of the Project, including the rates of accidents, lost time incidents and near-misses, any preventive or mitigative measures taken or planned by the Borrower, any staff training on occupational health and safety and any other initiatives in relation to occupational health and safety management which have been implemented or planned by the Borrower;
(6) a summary of any change in Environmental and Social Laws which may have a material effect on the Project;
(7) copies of any information on Environmental and Social Matters periodically submitted by the Borrower to the general public; and
(b) Commencing from the Effective Date, the Borrower shall submit the periodic Project reports referred to in Section 4.04(a)(v) of the Standard Terms and Conditions semi-annually, within 60 days after the end of the period being reported on, until the Project has been completed. Such reports shall include the following specific features:
(1) The following general information:
(A) the physical progress accomplished in the implementation of the Project to the date of report and during the reporting period;
(B) actual or expected difficulties or delays in the implementation of the Project and their effect on the implementation schedule, and the actual steps taken or planned to overcome the difficulties and avoid delays;
(C) expected changes in the completion date of the Project;
(D) key personnel changes in the staff of the PIU, the consultants or the contractors;
(E) matters that may affect the cost of the Project; and
(F) any development or activity likely to affect the economic viability of any Part of the Project.
(2) A bar-type progress chart, based on the Project implementation schedule, showing the progress in each Part of the Project and including a planned and actual expenditure graph.
(3) Financial statements showing details of the expenditures incurred under each Part of the Project and the Drawdowns, together with a statement showing:
(A) original cost estimates;
(B) revised cost estimates, if any, with reasons for changes;
(C) original estimated expenditures and actual expenditures to date;
(D) reasons for variations of actual expenditures to date from original estimated expenditures to date; and
(E) estimated expenditures for the remaining quarters of the year.
(c) Immediately upon the occurrence of any incident or accident relating to the Borrower or the Project which has or is likely to have a significant adverse effect on the environment, workers, or on public or occupational health or safety, the Borrower shall inform the Bank and promptly thereafter give the Bank notice thereof specifying the nature of such incident or accident and any steps the Borrower is taking to remedy the same. Where an incident involves sensitive information in relation to a person or any risk of retaliation, the initial notice to the Bank shall not include any details of the identity of the persons involved. Without limiting the generality of the foregoing,
(1) an incident or accident relates to the Project if it occurs on any site used for the Project or, if it is caused by Project workers and/or facilities, equipment, vehicles or vessels used for or relating to the Project (whether or not being used on any site of the Project and whether or not being used by authorised or unauthorised persons);
(2) an incident or accident is considered to have a significant adverse effect on the environment or on public or occupational health or safety if:
(A) any applicable law requires notification of such incident or accident to any Governmental Authority,
(B) such incident or accident involves fatality of any person (whether or not such person is employed by the Borrower),
(C) more than one person (whether or not such persons are employed by the Borrower) has received serious injury requiring hospitalisation,
(D) such incident involves violence and harassment, bullying, intimidation, and/or exploitation, including any form of gender-based violence,
(E) such incident involves forced and child labour relating to the Project, or
(F) such incident or accident has become, or is likely to become, public knowledge whether through media coverage or otherwise.
(d) The Borrower shall promptly notify the Bank of any significant protest or petition by workers or members of the public directed at or relating to the Borrower or the Project which might have a material adverse effect on the Borrower or the Project or which has become, or is likely to become, public knowledge through media coverage or otherwise. Within ten days following such notification, the Borrower shall submit a report satisfactory to the Bank specifying the outcome of the Borrower’s investigation into such protest, and any steps taken, or proposed to be taken, by the Borrower to resolve the issues raised in the protest.
Article IV
FINANCIAL AND OPERATIONAL COVENANTS
Section 4.01. Financial Records and Reports
(a) The Borrower shall maintain procedures, records and accounts adequate to reflect, in accordance with International Accounting Standards, consistently applied, the operations and financial condition of the Borrower and its Subsidiaries, if any, and adequate to monitor and record the progress of the Project (including its costs and the benefits to be derived from it).
(b) The Borrower shall:
(1) have its records, accounts and financial statements (including its balance sheet, income statement and statement of changes in financial position, and notes thereon), and the records, accounts and financial statements of its Subsidiaries, for each Fiscal Year audited by independent auditors as required by applicable law and regulations, in accordance with internationally accepted auditing principles and standards;
(2) furnish to the Bank as soon as available, but in any case not later than 180 days after the end of each Fiscal Year:
(A) certified copies of its financial statements for such Fiscal Year as so audited, including the calculation of the financial ratios set out herein, certified by the Chief Financial Officer or Chief Accountant of the Borrower, and a management letter from the Borrower’s auditors;
(B) the letter(s) from the Borrower’s Auditors to management of the Borrower commenting on, among other matters, the adequacy of the Borrower’s financial control procedures, accounting systems and other management systems according to usual business practice;
(C) a statement of all financial transactions between the Borrower and each of its Subsidiaries and shareholders during reported period where the aggregate amount of all such transactions and transfers exceeds EUR 20,000,000.00 (or equivalent thereof in other currencies at the current rate of exchange) or statement that aggregate value of such transactions was less than such amount;
(3) furnish to the Bank for each semi-annual period, within 90 days after its end, unaudited consolidated financial statements, including the calculation of financial ratios set out herein, certified by the Chief Financial Officer or Chief Accountant of the Borrower, a management discussion and analysis, a Project implementation and progress report (including details of each contract with a value in excess of EUR 1,000,000) and a statement of transactions with its affiliates and shareholders in excess of EUR 20,000,000;
(4) furnish copies of the insurance certificates or policies related to the Project as required by the EPC Contract, and information on any insurance claim or any material adverse change in the Borrower or the Project;
(5) provide immediate notice of (i) any event or potential event that would provide the Bank with a right of suspension or acceleration under the terms of this Agreement, or (ii) any allegations or information relating to a potential Prohibited Practice in relation to the Project;
(6) authorise the auditors to communicate directly with the Bank in accordance with the form contained in the Schedule 6.
Section 4.02. Negative Financial and Operational Covenants
(a) The Borrower shall not and shall ensure that its Subsidiaries will not, except as the Bank otherwise agrees, take any of the following actions and shall provide to the Bank all such information thereon as the Bank may reasonably request:
(1) enter into any agreement or arrangement to guarantee or in any way or under any condition to become obligated for all or any part of any financial or other obligation of another person, including any Subsidiary or Affiliate;
(2) enter into any transaction with any person except in the ordinary course of business, on ordinary commercial terms and on the basis of arm’s length arrangements, or establish any sole and exclusive purchasing or sales agency, or enter into any transaction whereby the Borrower might pay more than the ordinary commercial price for any purchase or might receive less than the full ex-works commercial price (subject to normal trade discounts) for its products or services;
(3) enter into any partnership, profit-sharing or royalty agreement or other similar arrangement whereby the Borrower’s income or profits are, or might be, shared with any other person;
(4) (whether voluntarily or involuntarily) make any prepayment, repurchase or early redemption of any Long-term debt or make a repayment of any Long-term debt pursuant to any provision of any agreement or note which provides directly or indirectly for acceleration of repayment in time or amount, unless in any such case, if the Bank so requires, the Borrower contemporaneously makes a proportionate prepayment of the principal amount then outstanding of the Loan in accordance with the provisions of Section 3.07 of the Standard Terms and Conditions (except that the amount of any such prepayment shall not be subject to the Minimum Prepayment Amount requirements);
(5) sell, transfer, lease or dispose of 10% or more of the Group’s consolidated fixed assets in aggregate and on a cumulative basis as reflected in the audited consolidated financial statements of the Borrower as most recently published and provided to the Bank pursuant to this Agreement, except and only to the extent as might be required to comply with applicable laws and regulations;
(6) undertake or permit any merger, demerger, consolidation or reorganisation, provided that the foregoing restrictions do not apply to any amalgamation, demerger, merger or corporate restructuring: (i) required under or in the context of the compliance with the Government Decision in order to comply with Directive 2009/72/EC (the «Permitted Unbundling Event»), or (ii) made with the prior written consent of the Bank, which shall not be unreasonably withheld or delayed;
(7) declare or pay any dividend unless (i) no event of acceleration as set out in Section 7.06 of the Special Terms and Conditions has occurred and is continuing; (ii) the distribution is made in compliance with applicable laws, and (iii) no waiver of financial terms granted by the Bank or the Co-Financier is in effect at the time the dividend is declared or due to be paid;
(8) incur capital expenditures in excess of EUR 200 million per year for any purpose other than (i) the Project; (ii) essential maintenance of the Borrower’s facilities (iii) acquisitions which are permitted only if: (a) no event of acceleration as set out in Section 7.06 of the Special Terms and Conditions has occurred and is continuing; and (b) the Borrower is not in breach of the Financial Ratios covenants as a result of such acquisitions;
(9) enter into leases (as lessee) with payments in excess of EUR 10 million per year;
(10) assume or permit to exist any Financial Debt, other than Permitted Financial Debt;
(11) incur or allow to remain outstanding any guarantee in respect of any obligation of any person, other than: (i) Permitted Guarantees, and (ii) as long as they do not incur additional Financial Debt, the Permitted Guarantees under (i) above may be accompanied with the issuance of the debenture notes (zaduznice) or bills of exchange (mjenice) for the specific performance being guaranteed thereunder;
(12) enter into any derivative transaction except in the ordinary course of trading and except for derivative transactions entered into for hedging purposes;
(13) enter into any transaction other than on an arm’s-length basis unless otherwise required by applicable laws and regulations or by decisions of governmental bodies;
(14) enter into any agreement whereby the Borrower’s business or operations are managed by any third party;