Hrvatski sabor
43
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT INTEGRIRANIH USLUGA ZEMLJIŠNE ADMINISTRACIJE I PRAVOSUĐA
Proglašavam Zakon o potvrđivanju Ugovora o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt integriranih usluga zemljišne administracije i pravosuđa, koji je Hrvatski sabor donio na sjednici 15. studenoga 2024.
Klasa: 011-02/24-02/71
Urbroj: 71-10-01/1-24-2
Zagreb, 22. studenoga 2024.
Predsjednik
Republike Hrvatske
Zoran Milanović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT INTEGRIRANIH USLUGA ZEMLJIŠNE ADMINISTRACIJE I PRAVOSUĐA
Članak 1.
Potvrđuje se Ugovor o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt integriranih usluga zemljišne administracije i pravosuđa, sklopljen u Zagrebu 25. lipnja 2024. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora o zajmu iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
LOAN NUMBER 9645-HR
LOAN AGREEMENT
(INTEGRATED LAND ADMINISTRATION AND JUSTICE SERVICES PROJECT) BETWEEN REPUBLIC OF CROATIA AND INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
AGREEMENT dated as of the Signature Date between REPUBLIC OF CROATIA («Borrower») and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank»). The Borrower and the Bank hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
1.01. The General Conditions (as defined in the Appendix to this Agreement) apply to and form part of this Agreement.
1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement.
Article II
LOAN
2.01. The Bank agrees to lend to the Borrower the amount of one hundred and ten million Euro (€ 110,000,000), as such amount may be converted from time to time through a Currency Conversion («Loan»), to assist in financing the project described in Schedule 1 to this Agreement («Project»).
2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section III of Schedule 2 to this Agreement.
2.03. The Front-end Fee is one quarter of one percent (0.25%) of the Loan amount.
2.04. The Commitment Charge is one quarter of one percent (0.25%) per annum on the Unwithdrawn Loan Balance.
2.05. The interest rate is the Reference Rate plus the Variable Spread or such rate as may apply following a Conversion; subject to Section 3.02(e) of the General Conditions.
2.06. The Payment Dates are April 15 and October 15 in each year.
2.07. The principal amount of the Loan shall be repaid in accordance with Schedule 3 to this Agreement.
Article III
PROJECT
3.01. The Borrower declares its commitment to the objectives of the Project. To this end, the Borrower shall, through MoJPA and SGA, carry out the Project in accordance with the provisions of Article V of the General Conditions and Schedule 2 to this Agreement.
Article IV
EFFECTIVENESS; TERMINATION
4.01. The Additional Condition of Effectiveness consists of the following, namely that the Borrower has prepared and adopted the Project Operations Manual in form and substance satisfactory to the Bank.
4.02. The Effectiveness Deadline is the date one hundred twenty (120) days after the Signature Date.
Article V
REPRESENTATIVE; ADDRESSES
5.01. The Borrower’s Representative is the minister in charge of finance.
5.02. For purposes of Section 10.01 of the General Conditions:
(a) the Borrower’s address is:
Ministry of Finance
Katanciceva 5
10000 Zagreb
Republic of Croatia;
(b) the Borrower’s Electronic Address is:
Facsimile: (385-1) 4922-598; and
Email: sectorifr@mfin.hr; with copy to: kabinet@mfin.hr
5.03. For purposes of Section 10.01 of the General Conditions:
(a) the Bank’s address is:
International Bank for Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America; and
(b) the Bank’s Electronic Address is:
AGREED as of the Signature Date.
REPUBLIC OF CROATIA
By
_____________________
Authorized Representative
Name: Marko Primorac
Title: Deputy Prime Minister and
Minister of Finance
Datum: 25. June, 2024
INTERNATIONAL BANK FOR
RECONSTRUCION AND
DEVELOPMENT
By
__________________________
Authorized Representative
Name: Jehan Arulpragasam
Title: Croatia Country Manager
Date: 13 June, 2024
SCHEDULE 1
PROJECT DESCRIPTION
The objective of the Project is to enhance digital services and functional integration of land administration and court institutions.
The Project consists of the following parts:
Part 1: Integrated Digital Land Registry and Court Services
Supporting the digitization and integration of land registry court data and services through:
(a) restoration and digitization of damaged land books;
(b) scanning and indexing of land books and book of deeds, including the hiring of scanning operators;
(c) provision of hardware and software to support land and court data management;
(d) preparation of studies on business process management;
(e) development of an automated system for management of assets and IT contracts; and
(f) development and implementation of a virtual assistant for land services at MoJPA.
Part 2: Integrated Digital Services of State Registers and Geospatial Data
Supporting collection and management of enhanced geospatial data (e.g. cadastral parcels, buildings, and infrastructure) to inform effective disaster risk planning and climate change adaptation policies, including through:
(a) the conversion of paper geodetic elaborates into standard format and their migration to the ICS and JIS;
(b) the carrying out of surveys to generate precise, tri-dimensional, topographical data;
(c) the establishment of a data storage system and provision of graphics workstations;
(d) the purchase and installation of fifteen permanent GNSS Stations;
(e) the purchase of communications equipment and software for SGA;
(f) the purchase of scanning operators at selected SGA scanning centers; and
(g) the development and implementation of a virtual assistant at SGA.
Part 3: Enhanced Digital Integration of Land Register and Cadaster
Supporting the collection and management of land registry and cadaster data to provide eased access to land data and documents through enhanced land information systems to inform resource management, climate-smart decision-making, and improved access for citizens and businesses to e-services related to land transactions, including through:
(a) upgrading the ICT hardware and software to enhance the JIS and one-stop shop through: (i) improving data quality and maintenance; (ii) recording of real property prices; (iii) simplifying online access to land administration data; (iv) upgrading of mobile apps (My Properties); (v) simplifying the process of recording construction rights; (vi) further digitization of cadaster processes; and (vii) extension of JIS access to other relevant stakeholders;
(b) conducting cadastral surveys and establishing/renewing the land register, including through the financing of the Remuneration of Public Notaries; and
(c) updating the methodology for the building registry and upgrading the IT system, including piloting and rollout.
Part 4: Integrated Court, Land Registry Office and Cadastral Office Infrastructure
Renovation, rehabilitation, and construction of selected court and cadaster facilities in Novska, Rijeka, Bjelovar and Velika Gorica to support integrated cadaster, land registry and court services, including infrastructure design studies and provision of new ICT cabling to improve digital services in selected cadastral offices, as detailed in the Project Operations Manual.
Part 5: Institutional Capacity Building, Policy Analysis, and Project Management
(a) Project management, coordination, and monitoring and evaluation activities, including the financing of Operating Costs.
(b) Building the capacity of MoJPA and SGA staff on good practices in cadaster and land registry laws, individual reconciliation of cadaster and land registry data, land registry renewal, joint cadaster and land registry procedures, use of e-services by public and professional users, and management training.
(c) Conducting public awareness campaigns about e-services offered by MoJPA and SGA and customer satisfaction surveys.
SCHEDULE 2
PROJECT EXECUTION
Section I.
Implementation arrangements
A. Institutional Arrangements.
1. No later than forty-five (45) days after the Effective Date, the Borrower, through MoJPA and SGA, shall establish and thereafter maintain, throughout Project implementation, a PIU, with a mandate, functions, resources, and staff in adequate numbers and with qualifications, experience, and terms of reference satisfactory to the Bank, responsible for implementation of the Project, consisting of a Project management team and implementation support teams, as set forth in the POM. Without limitation on the generality of the foregoing, the PIU shall be responsible, inter alia, for: (a) planning, coordination, implementation, and monitoring and evaluation of Project activities; (b) procurement and financial management; (c) social and environmental standards compliance; and (d) reporting.
2. The MoJPA shall be responsible for implementation of Part 1 of the Project and shall have joint responsibility, together with the SGA, for implementation of Parts 3, 4, and 5 of the Project, as further specified in the Project Operations Manual. A Project coordinator within the MoJPA shall be responsible for day-to-day coordination, flow of information and decision-making related to the activities under the Project for which MoJPA is responsible. To this end, the Borrower shall, through the MoJPA, ensure that the Project coordinator position within the MoJPA is filled and adequately funded throughout the duration of the Project, in a manner acceptable to the Bank.
3. The SGA shall be responsible for implementation of Part 2 of the Project and shall have joint responsibility, together with MoJPA, for Parts 3, 4, and 5 of the Project, as further specified in the Project Operations Manual. A Project coordinator within the SGA shall be responsible for day-to-day coordination, flow of information and decision making related to the activities under the Project for which SGA is responsible. To this end, the Borrower shall, through SGA, ensure that the Project coordinator position within the SGA is filled and adequately funded throughout the duration of the Project, in a manner acceptable to the Bank.
B. Project Operations Manual.
1. The Borrower, through MoJPA and SGA, shall prepare and adopt an operations manual («Project Operations Manual» or «POM»), in form and substance satisfactory to the Bank, which shall contain the methods and procedures for the implementation of the Project, including but not limited to: (a) administration and coordination arrangements; (b) performance indicators of the Project; (c) monitoring and evaluation methods; (d) financial management guidelines and procedures; (d) anti-corruption and fraud measures; and (d) implementation modalities for each Part of the Project.
2. The Borrower, through MoJPA and SGA, shall carry out the Project in accordance with the Project Operations Manual.
3. Except as the Bank shall otherwise agree in writing, the Borrower shall not amend, waive, suspend, or abrogate any provision of the POM. In case of any inconsistency between any provisions of the POM and those of this Agreement, the provisions of this Agreement shall prevail.
C. Annual Work Plan and Budget.
1. The Borrower, through the PIU, shall:
(a) unless otherwise agreed with the Bank, prepare and furnish to the Bank, not later than December 15 of each year during the implementation of the Project starting in 2024, a proposed annual work plan and budget for the next calendar year containing: (i) all activities to be carried out under the Project during that calendar year; and (ii) a proposed financing plan for expenditures required for such activities, setting forth the proposed amounts and sources of financing; and