Hrvatski sabor
19
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O FINANCIRANJU IZMEĐU REPUBLIKE HRVATSKE I EUROPSKE INVESTICIJSKE BANKE ZA PROJEKT »REVITALIZACIJA ŽELJEZNIČKOG SUSTAVA REPUBLIKE HRVATSKE« IZ OKVIRNOG ZAJMA
Proglašavam Zakon o potvrđivanju Ugovora o financiranju između Republike Hrvatske i Europske investicijske banke za Projekt »Revitalizacija željezničkog sustava Republike Hrvatske« iz okvirnog zajma, koji je Hrvatski sabor donio na sjednici 14. ožujka 2024.
Klasa: 011-02/24-02/38
Urbroj: 71-10-01/1-24-2
Zagreb, 18. ožujka 2024.
Predsjednik
Republike Hrvatske
Zoran Milanović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O FINANCIRANJU IZMEĐU REPUBLIKE HRVATSKE I EUROPSKE INVESTICIJSKE BANKE ZA PROJEKT »REVITALIZACIJA ŽELJEZNIČKOG SUSTAVA REPUBLIKE HRVATSKE« IZ OKVIRNOG ZAJMA
Članak 1.
Potvrđuje se Ugovor o financiranju između Republike Hrvatske i Europske investicijske banke za Projekt »Revitalizacija željezničkog sustava Republike Hrvatske« iz okvirnog zajma, potpisan u Zagrebu i u Luxemburgu 22. siječnja 2024. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
CONTRACT NUMBER (FI N°) 95.797
OPERATION NUMBER (SERAPIS N°) 2022-0660
FRAMEWORK LOAN FOR THE PROJECT «REVITALIZATION OF THE RAILWAY SYSTEM OF THE REPUBLIC OF CROATIA»[1](The EIB identification of the Project in Serapis is RAILWAY DEVELOPMENT FRAMEWORK LOAN CROATIA)
FINANCE CONTRACT
BETWEEN THE REPUBLIC OF CROATIA AND THE EUROPEAN INVESTMENT BANK
Zagreb, 17 January 2024
Luxembourg, 22 January 2024
THIS CONTRACT IS MADE BETWEEN:
The Bank and the Borrower together are referred to as the «Parties» and any of them is a «Party».
WHEREAS:
(a) The Borrower has stated that it is undertaking various investments in the railway sector in Croatia through the Ministry of the Sea, Transport and Infrastructure as the promoter (the «Promoter»), mainly in sustainable transport systems in the railway sector, through the rehabilitation, modernisation, expansion and improvement of the railway infrastructure and the rolling stock, and related to the EU financing perspective for the Borrower, including EU funding from the Operational Program 2021-2027, the Recovery and Resilience Facility (RRF), the Connecting Europe Facility and other EU envelops, as more particularly described in the technical description (the «Technical Description») set out in Schedule A.1. All such investment schemes (each hereinafter referred to as the «Scheme»), which are the subject of the Letter(s) of Allocation from the Bank shall collectively constitute and be hereinafter collectively referred to as the project (the «Project») and shall be carried out and managed by HŽ Infrastruktura d.o.o. (HŽI) for infrastructure projects and HŽ Putnički prijevoz d.o.o. (HŽPP) for passenger rolling stock.
(b) The total cost of the Project, as estimated by the Bank, is EUR 2,600,000,000 (two billion and six hundred million euros) and the Borrower has stated that it intends to finance the Project as follows:
(c) In order to fulfil the financing plan set out in Recitaln (b), the Borrower has requested from the Bank a credit of EUR 900,000,000 (nine hundred million euros).
(d) The Bank, considering that the financing of the Project falls within the scope of its functions, and having regard to the statements and facts cited in these Recitals, has decided to approve the Framework Loan in an amount of EUR 900,000,000 (nine hundred million euros) (the «Approved Credit») and to give immediate effect to the Borrower’s request providing to it a credit in an amount of EUR 400,000,000 (four hundred million euros) for the rehabilitation, modernisation, expansion and improvement of the railway infrastructure to be carried out by HŽI and passenger rolling stock to be carried out by HŽPP under this first finance contract (the «Contract»). The remaining part of the Approved Credit in the amount of EUR 500,000,000 (five hundred million euros) is going to be the subject of subsequent finance contract(s) in connection with the implementation of the aforementioned Project. The Borrower shall ensure that prior to disbursement of the last EUR 90,000,000 (ninety million euros) of the Approved Credit, the full amount of the loans disbursed under the EIB Finance Contracts when aggregated with the amount of any proposed tranche, have been fully allocated to Schemes relating to the Project.
(e) The Ministry of Finance, represented by the Minister of Finance, Mr. Marko Primorac, has been authorised to sign this Contract on behalf of the Borrower.
(f) The Borrower acknowledges the Bank’s preferred creditor status as an international financial institution.
(g) The Statute of the Bank provides that the Bank shall ensure that its funds are used as rationally as possible in the interests of the European Union; and, accordingly, the terms and conditions of the Bank’s loan operations must be consistent with relevant policies of the European Union.
(h) The financing of the Project includes certain EU Funds and state subsidies or grants and the provision of such funds has been duly authorised and will be provided in compliance with all relevant EU Law, including that on state aid.
(i) The Bank considers that access to information plays an essential role in the reduction of environmental and social risks, including human rights violations, linked to the projects it finances and has therefore established its transparency policy, the purpose of which is to enhance the accountability of the Bank’s group towards its stakeholders and the citizens of the European Union in general.
(j) The processing of personal data shall be carried out by the Bank in accordance with applicable EU Law on the protection of individuals with regard to the processing of personal data by the European Union institutions and bodies and on the free movement of such data. For the purposes of the GDPR (as defined below) and Regulation (EU) 2018/1725, the Parties acknowledge that each Party will act as an independent controller, and not a processor on behalf of or joint controller with the other Party, when processing personal data in connection with this Contract.
(k) The Bank supports the implementation of international and European Union standards in the field of anti-money laundering and countering the financing of terrorism and promotes tax good governance standards. It has established policies and procedures to avoid the risk of misuse of its funds for purposes which are illegal or abusive in relation to applicable laws. The Bank’s group statement on tax fraud, tax evasion, tax avoidance, aggressive tax planning, money laundering and financing of terrorism is available on the Bank’s website and offers further guidance to the Bank’s contracting counterparties.
NOW THEREFORE it is hereby agreed as follows:
INTERPRETATION AND DEFINITIONS
Interpretation
In this Contract:
(a) references to «Articles», «Recitals», «Schedules» and «Annexes» are, save if explicitly stipulated otherwise, references respectively to articles of, and recitals, schedules and annexes to this Contract;
(b) references to «law» or «laws» mean:
(i) any applicable law and any applicable treaty, constitution, statute, legislation, decree, normative act, rule, regulation, judgement, order, writ, injunction, determination, award or other legislative or administrative measure or judicial or arbitral decision in any jurisdiction which is binding or applicable case law; and
(ii) EU Law;
(c) references to «applicable law», «applicable laws» or «applicable jurisdiction» mean:
(i) a law or jurisdiction applicable to the Borrower, its rights and/or obligations (in each case arising out of or in connection with this Contract), its capacity and/or assets and/or the Project; and/or, as applicable
(ii) a law or jurisdiction (including in each case the Bank’s Statute) applicable to the Bank, its rights, obligations, capacity and/or assets;
(d) references to a provision of law or a treaty are references to that provision as amended or re-enacted;
(e) references to any other agreement or instrument are references to that other agreement or instrument as amended, novated, supplemented, extended or restated;
(f) words and expressions in plural shall include singular and vice versa;
(g) terms defined in the GDPR (as defined below), including the terms «controller», «data subject», «personal data», «processing», and «processor», have the same meanings when used in Recital (j) or Article 6.9 of this Contract;
(h) references to «month» mean a period starting on one day in a calendar month and ending on the numerically corresponding day in the next calendar month, except that and subject to the definition of Payment Date, Article 5.1 and Prilog B and unless provided otherwise in this Contract:
(i) if the numerically corresponding day is not a Business Day, that period shall end on the next Business Day in that calendar month in which that period is to end if there is one, or if there is not, on the immediately preceding Business Day; and
(ii) if there is no numerically corresponding day in the calendar month in which that period is to end, that period shall end on the last Business Day in that calendar month; and
(i) a reference in this Contract to a page or screen of an information service displaying a rate shall include:
(i) any replacement page of that information service which displays that rate; and
(ii) the appropriate page of such other information service which displays that rate from time to time in place of that information service,
and, if such page or service ceases to be available, shall include any other page or service displaying that rate specified by the Bank.
Definitions
In this Contract:
«Affected Scheme» has the meaning given to it in Article 4.3.A(5).
«Agreed Deferred Disbursement Date» has the meaning given to it in Article 1.5.A(2)(b).
«Allocation Period» has the meaning given to it in Article 1.9.A.
«Allocation Request» has the meaning given to it in Article 1.9.A.
«AML Criminal Law Directive» means Directive (EU) 2018/1673 of the European Parliament and of the Council of 23 October 2018 on combating money laundering by criminal law, as amended, supplemented or restated.
«AML Directives» means the 4th and 5th AML Directives and the AML Criminal Law Directive.
«4th and 5th AML Directives» means Directive 2015/849 of the European Parliament and of the Council of 20 May 2015 on the prevention of the use of the financial system for the purposes of money laundering or terrorist financing, as amended by Directive (EU) 2018/843 of the European Parliament and of the Council of 30 May 2018, as amended, supplemented or restated.
«Approved Credit» has the meaning given to it in Recital (d).
«Authorisation» means an authorisation, permit, consent, approval, resolution, licence, exemption, filing, notarisation or registration.
«Authorised Signatory» means a person authorised to sign individually or jointly (as the case may be) Disbursement Requests on behalf of the Borrower and named in the most recent List of Authorised Signatories and Accounts received by the Bank prior to the receipt of the relevant Disbursement Request.
«Birds Directive» means the Directive 2009/147/EC of the European Parliament and of the Council on the conservation of wild birds of 30 November 2009, as amended, supplemented or restated.
«Business Day» means a day (other than a Saturday or Sunday) on which the Bank and commercial banks are open for general business in Luxembourg.
«Cancelled Tranche» has the meaning given to it in Article 1.6.C(2)(a).
«Change-of-Law Event» has the meaning given to it in Article 4.3.A(2).
«Constitution of the Republic of Croatia» means the Constitution of the Republic of Croatia as published in the Official Gazette no. 85/10 – consolidated text and 5/14 – Decision of the Constitutional Court of the Republic of Croatia, as amended, supplemented or restated.
«Contract» has the meaning given to it in Recital (d).
«Contract Number» means the Bank generated number identifying this Contract and indicated on the cover page of this Contract after the letters «FI N°».
«Credit» has the meaning given to it in Article 1.1.
«Debt Instrument» has the meaning given to it in Article 7.1.
«Deferment Fee» means a fee calculated on the amount of a Notified Tranche deferred or suspended at the rate of the higher of:
(a) 0.125 % (12.5 basis points), per annum; and
(b) the percentage rate by which:
(i) the interest rate that would have been applicable to such Tranche had it been disbursed to the Borrower on the Scheduled Disbursement Date, exceeds
(ii) the EURIBOR (one month rate) less 0.125 % (12.5 basis points), unless such rate is less than zero in which case it shall be set at zero.
Such fee shall accrue from the Scheduled Disbursement Date to the Disbursement Date or, as the case may be, until the date of cancellation of the Notified Tranche in accordance with this Contract.
«Disbursement Account» means, in respect of each Tranche, the bank account to which disbursements may be made under this Contract, as set out in the most recent List of Authorised Signatories and Accounts.
«Disbursement Date» means the date on which disbursement of a Tranche is made by the Bank.
«Disbursement Notice» means a notice from the Bank to the Borrower pursuant to and in accordance with Article 1.2.C.
«Disbursement Request» means a notice substantially in the form set out in 0.
«Dispute» has the meaning given to it in Article 11.2.
«Disruption Event» means either or both of:
(a) a material disruption to those payment or communications systems or to those financial markets which are, in each case, required to operate in order for payments to be made in connection with this Contract; or
(b) the occurrence of any other event which results in a disruption (of a technical or systems-related nature) to the treasury or payments operations of either the Bank or the Borrower, preventing that Party from:
(i) performing its payment obligations under this Contract; or
(ii) communicating with the other Party,
and which disruption (in either such case as per (a) or (b) above) is not caused by, and is beyond the control of, the Party whose operations are disrupted.
«EIA» means the Environmental Impact Assessment in the meaning of the EIA Directive.
«EIA Directive» means the Directive 2014/52/EU of the European Parliament and of the Council of 16 April 2014 amending Directive 2011/92/EU on the assessment of the effects of certain public and private projects on the environment, as amended, supplemented or restated.
«EIB Finance Contracts» means this Contract and any other finance contract between the Bank and the Borrower having the same Operation Number as this Contract.
«EIB Funds» means the Credit made available hereunder and any other funds made available by the Bank for the purpose of the Project under any EIB Finance Contract.
«Environment» means the following:
(a) fauna and flora, living organisms including the ecological systems;
(b) land, soil, water (including marine and coastal waters), air, climate and the landscape (natural or man-made structures, whether above or below ground);
(c) cultural heritage (natural, tangible and intangible);
(d) the built environment; and
(e) human health and wellbeing.
«Environmental and Social Approval» means any Authorisation required by Environmental and Social Law.
«Environmental or Social Claim» means any claim, proceeding, formal notice or investigation by any person in respect of any Environmental and Social Law.
«Environmental and Social Law» means:
(a) EU Law, including principles and standards;
(b) the laws and regulations of the Republic of Croatia; and
(c) applicable international treaties,
in each case of which a principal objective is the preservation, protection or improvement of the Environment and/or the protection or improvement of Social Matters.
«EU Funds» means any and all funds from the European Union.
«EU Funds Event» has the meaning given to it in Article 4.3.A(5)(c).
«EU Law» means the acquis communautaire of the European Union as expressed through the Treaties of the European Union, the regulations, directives, delegated acts, implementing acts, principles, decisions and the case law of the Court of Justice of the European Union.
«EU Commission» means the Commission of the European Union.
«EUR» or «euro» means the lawful currency of the Member States of the European Union, which adopt or have adopted it as their currency in accordance with the relevant provisions of the Treaty on European Union and the Treaty on the Functioning of the European Union or their succeeding treaties.
«EURIBOR» has the meaning given to it in Prilog B.
«EU Sanctions» has the meaning set out in limb (b) of the definition of Sanctions.
«Event of Default» means any of the circumstances, events or occurrences specified in Article 1.44.
«Exclusion Policy» means the European Investment Bank Exclusion Policy as published on the Bank’s website.
«Final Availability Date» means the date falling 60 (sixty) months after the signature of this Contract.
«Fixed Rate» means an annual interest rate determined by the Bank in accordance with the applicable principles from time to time laid down by the governing bodies of the Bank for loans made at a fixed rate of interest, denominated in the currency of the Tranche and bearing equivalent terms for the repayment of capital and the payment of interest. Such rate shall not be of negative value.
«Fixed Rate Tranche» means a Tranche on which the Fixed Rate is applied.
«Floating Rate» means a fixed-spread floating annual interest rate, determined by the Bank for each successive Floating Rate Reference Period equal to the EURIBOR plus the Spread. If the Floating Rate for any Floating Rate Reference Period is calculated to be below zero, it will be set at zero.
«Floating Rate Reference Period» means each period from one Payment Date to the next relevant Payment Date; the first Floating Rate Reference Period shall commence on the date of disbursement of the Tranche.
«Floating Rate Tranche» means a Tranche on which the Floating Rate is applied.
«GDPR» means General Data Protection Regulation (EU) 2016/679, as amended, supplemented or restated.
«Habitats Directive» means the Directive 92/43/EEC of 21 May 1992 of the Council on the conservation of natural habitats and of wild fauna and flora, as amended, supplemented or restated.
«Illegal Activity» means any of the following illegal activities or activities carried out for illegal purposes according to applicable laws in any of the following areas: (i) fraud, corruption, coercion, collusion or obstruction, (ii) money laundering, financing of terrorism or tax crimes each as defined in the AML Directives, and (iii) other illegal activity against the financial interests of the European Union as defined in the PIF Directive.
«Illegality Event» has the meaning given to it in Article 4.3.A(3).
«Indemnifiable Prepayment Event» means a Prepayment Event other than the Illegality Event.
«Interest Revision/Conversion» means the determination of new financial conditions relative to the interest rate, specifically the same interest rate basis (»revision») or a different interest rate basis (»conversion») which can be offered for the remaining term of a Tranche or until the next Interest Revision/Conversion Date, if any.
«Interest Revision/Conversion Date» means the date, which shall be a Payment Date, specified by the Bank pursuant to Article 1.2.C in the Disbursement Notice.
«Interest Revision/Conversion Proposal» means a proposal made by the Bank under Prilog D.
«Interest Revision/Conversion Request» means a written notice from the Borrower, delivered at least 75 (seventy-five) days before an Interest Revision/Conversion Date, requesting the Bank to submit to it an Interest Revision/Conversion Proposal. The Interest Revision/Conversion Request shall also specify:
(a) the Payment Dates chosen in accordance with the provisions of Article 1.13;
(b) the amount of the Tranche for which the Interest Revision/Conversion shall apply; and
(c) any further Interest Revision/Conversion Date chosen in accordance with Article 1.13.
«Law on the Conclusion and Execution of Treaties» means the Croatian Law on the conclusion and execution of treaties published in the Official Gazette no. 28/96 of 20 April 1996, as amended, supplemented or restated.
«Letter of Allocation» has the meaning given to it Article 1.9.B(d).
«List of Authorised Signatories and Accounts» means a list, in form and substance satisfactory to the Bank, setting out:
(a) the Authorised Signatories accompanied by evidence of signing authority of the persons named on the list and specifying if they have individual or joint signing authority;
(b) the specimen signatures of such persons;
(c) the bank account(s) to which disbursements may be made under this Contract (specified by IBAN code if the country is included in the IBAN Registry published by SWIFT, or in the appropriate account format in line with the local banking practice), BIC/SWIFT code of the bank and the name of the bank account(s) beneficiary, together with evidence that such account(s) have been opened in the name of the beneficiary; and
(d) the bank account(s) from which payments under this Contract will be made by the Borrower (specified by IBAN code if the country is included in the IBAN Registry published by SWIFT, or in the appropriate account format in line with the local banking practice), BIC/SWIFT code of the bank and the name of the bank account(s) beneficiary, together with evidence that such account(s) have been opened in the name of the beneficiary.
«Loan» means the aggregate of the amounts disbursed from time to time by the Bank under this Contract.
«Loan Outstanding» means the aggregate of the amounts disbursed from time to time by the Bank under this Contract that remains outstanding.
«Market Disruption Event» means any of the following circumstances:
(a) there are, in the opinion of the Bank, events or circumstances adversely affecting the Bank’s access to its sources of funding;
(b) in the opinion of the Bank, funds are not available from the Bank’s ordinary sources of funding in order to adequately fund a Tranche in the relevant currency and/or for the relevant maturity and/or in relation to the reimbursement profile of such Tranche; or
(c) in relation to a Floating Rate Tranche:
(i) the cost to the Bank of obtaining funds from its sources of funding, as determined by the Bank, for a period equal to the Floating Rate Reference Period of such Tranche (i.e. in the money market) would be in excess of the EURIBOR; or
(ii) the Bank determines that adequate and fair means do not exist for ascertaining the EURIBOR.
«Material Adverse Change» means, in relation to the Borrower any event or change of condition affecting the Borrower, which, in the opinion of the Bank:
(a) materially impairs the ability of the Borrower to perform its financial or any of its other obligations under this Contract;
(b) materially impairs the prospects or financial condition of the Borrower; or
(c) adversely affects any security provided by the Borrower.
«Maturity Date» means the last Repayment Date of a Tranche specified pursuant to Article 1.16A(b)(iv)or the sole Repayment Date of a Tranche specified pursuant to Article 4.1.B.
«Notified Tranche» means a Tranche in respect of which the Bank has issued a Disbursement Notice.
«Payment Account» means the bank account from which payments under this Contract will be made by the Borrower, as set out in the most recent List of Authorised Signatories and Accounts.
«Payment Date» means the annual, semi-annual or quarterly dates specified in the Disbursement Notice until and including the Interest Revision/Conversion Date, if any, or the Maturity Date, save that, in case any such date is not a Relevant Business Day, it means:
(a) for a Fixed Rate Tranche, either:
(i) the following Relevant Business Day, without adjustment to the interest due under Article 1.13;
(ii) the preceding Relevant Business Day with adjustment (but only to the amount of interest due under Article 1.13 that accrued over the last interest period), in case repayment of principal is made in a single instalment in accordance with Prilog D point C; and
(b) for a Floating Rate Tranche, the following Relevant Business Day in that month or, failing that, the nearest preceding Relevant Business Day, in all cases with corresponding adjustment to the interest due under Article 1.13.
«PIF Directive» means Directive (EU) 2017/1371 of the European Parliament and of the Council of 5 July 2017 on the fight against fraud to the Union’s financial interests by means of criminal law, as amended, supplemented or restated.
«Prepayment Amount» means the amount of a Tranche to be prepaid by the Borrower in accordance with Article 4.2.A or Article 4.3.A, as applicable.
«Prepayment Date» means the date, as requested by the Borrower and agreed by the Bank or indicated by the Bank (as applicable) on which the Borrower shall effect prepayment of a Prepayment Amount.
«Prepayment Event» means any of the events described in Article 4.3.A.
«Prepayment Indemnity» means in respect of any principal amount to be prepaid, the amount communicated by the Bank to the Borrower as the present value (calculated as of the Prepayment Date) of the excess, if any, of:
(a) the interest that would accrue thereafter on the Prepayment Amount over the period from the Prepayment Date to the Interest Revision/Conversion Date, if any, or the Maturity Date, if it were not prepaid; over
(b) the interest that would so accrue over that period, if it were calculated at the Redeployment Rate, less 0.19 % (nineteen basis points).
The said present value shall be calculated at a discount rate equal to the Redeployment Rate, applied as of each relevant Payment Date.
«Prepayment Notice» means a written notice from the Bank to the Borrower in accordance with Article 4.2.C.
«Prepayment Request» means a written request from the Borrower to the Bank to prepay all or part of the Loan Outstanding, in accordance with Article 4.2.A.
«Project Agreement» means the agreement to be entered into between HŽI, HŽPP the Ministry of the Sea, Transport and Infrastructure and the Ministry of Finance, providing for the tasks and roles of the HŽI, HŽPP, the Ministry of the Sea, Transport and Infrastructure and the Ministry of Finance with respect to the Project and the Loan.
«Project Company» means HŽI for carrying out and managing infrastructure Schemes and HŽPP for carrying out and managing passenger rolling stock Schemes or any of their successors or other companies designated by the Borrower to carry out any of the Schemes under the Project.
«Project Cost Reduction Event» has the meaning given to it in Article 4.3.A(1).
«Public Tender» means the public tender (or open competition on the basis of Regulation 1370/2007 EU) process for the new Public Service Contracts (as defined below) with the Borrower (represented by the Promoter (or its legal successor for this purpose) in respect of railway public transportation).
«Public Service Contract» or «PSC» means the public service contracts concerning the Project entered or to be entered into between HŽPP or any other transport operating company and the Borrower (represented by the Promoter (or its legal successor for this purpose) for public passenger transport service by rail on the basis of, and complying with, the Regulation 1370/2007 EU.
«Redeployment Rate» means the fixed annual rate determined by the Bank, being a rate which the Bank would apply on the day of the indemnity calculation to a loan that has the same currency, the same terms for the payment of interest and the same repayment profile to the Interest Revision/Conversion Date, if any, or the Maturity Date as the Tranche in respect of which a prepayment or cancellation is proposed or requested to be made. Such rate shall not be of negative value.
«Regulation 1370/2007 EU» means Regulation (EC) No. 1370/2007 of the European Parliament and of the Council of 23 October 2007 on public passenger transport services by rail and by road and repealing Council Regulations (EEC) Nos 1191/69 and 1107/70, as amended, supplemented and restated, including by Regulation (EU) 2016/2338 of the European Parliament and of the Council of 14 December 2016 amending Regulation (EC) No. 1370/2007 concerning the opening of the market for domestic passenger transport services by rail.
«Relevant Business Day» means a day on which real time gross settlement system operated by the Eurosystem (T2), or any successor system, is open for settlement of payments in EUR.
«Relevant Person» means:
(a) with respect to the Borrower, any ministries, other central executive government bodies, central bank or other governmental sub-divisions and any of their officials or representatives, or any other person acting for it, on its behalf or under its control, having the authority to manage and/or supervise the Credit, the Loan or the Project or any Scheme; or
(b) with respect to the Project Company, any member of its management bodies or any of its employees or any other person acting for it, on its behalf or under its control, having the power to give material directions and/or exercise material control with respect to the Credit, the Loan or any Scheme.
«Repayment Date» means each of the Payment Dates specified for the repayment of the principal of a Tranche in the Disbursement Notice, in accordance with Article 1.16.
«Requested Deferred Disbursement Date» has the meaning given to it in Article 1.5.A(1)(a)(ii).
«Sanctions» means the economic or financial sanctions laws, regulations, trade embargoes or other restrictive measures (including, in particular, but not limited to, measures in relation to the financing of terrorism) enacted, administered, implemented and/or enforced from time to time by any of the following:
(a) the United Nations, including, inter alia, the United Nations Security Council;
(b) the European Union, including, inter alia, the Council of the European Union and the European Commission, and any other competent bodies/institutions or agencies of the European Union;
(c) the government of the United States of America, and any department, division, agency, or office thereof, including, inter alia, the Office of Foreign Asset Control (OFAC) of the United States Department of the Treasury, the United States Department of State and/or the United States Department of Commerce; and
(d) the government of the United Kingdom, and any department, division, agency, office or authority, including, inter alia, the Office of Financial Sanctions Implementation of His Majesty’s Treasury and the Department for International Trade of the United Kingdom.
«Scheduled Disbursement Date» means the date on which a Tranche is scheduled to be disbursed in accordance with Article 1.2.C.
«Scheme» has the meaning given to it in Recital (a).
«Security» means any mortgage, pledge, lien, charge, assignment, hypothecation, or other security interest securing any obligation of any person or any other agreement or arrangement having a similar effect.
«Social Matters» means all, or any of, the following:
(a) labour and working conditions;
(b) occupational health and safety;
(c) rights and interests of vulnerable groups;
(d) rights and interests of indigenous peoples;
(e) gender equality;
(f) public health, safety and security;
(g) avoidance of forced evictions and alleviation of hardship arising from involuntary resettlement; and
(h) stakeholder engagement.
«Spread» means the fixed spread (being of either positive or negative value) to the EURIBOR, as determined by the Bank and notified to the Borrower in the relevant Disbursement Notice, or in the Interest Revision/Conversion Proposal.
«Tax» means any tax, levy, impost, duty or other charge or withholding of a similar nature (including any penalty or interest payable in connection with any failure to pay or any delay in paying any of the same).
«Technical Description» has the meaning given to it in Recital (a).
«Tranche» means each disbursement made or to be made under this Contract. In case no Disbursement Notice has been delivered, Tranche shall mean a Tranche as requested under Article 1.2.B.
Article 1
Credit and Disbursements
1.1. Amount of Credit
By this Contract the Bank establishes in favour of the Borrower, and the Borrower accepts, a credit in an amount equivalent to EUR 400,000,000 (four hundred million euros) for the financing of the Project (the «Credit»).
1.2 Disbursement procedure
1.2.A Tranches
The Bank shall disburse the Credit in up to 10 (ten) Tranches. The amount of each Tranche shall be in a minimum amount of EUR 40,000,000.00 (forty million euros) or (if less) the entire undrawn balance of the Credit.
The First Tranche shall be in a maximum amount not exceeding EUR 270,000,000 (two hundred and seventy million euros).
1.2.B Disbursement Request
(a) The Borrower may present to the Bank a Disbursement Request for the disbursement of a Tranche, such Disbursement Request to be received at the latest 15 (fifteen) days before the Final Availability Date. The Disbursement Request shall be in the form set out in 0 and shall specify:
(i) the amount and currency of the Tranche;
(ii) the preferred disbursement date for the Tranche; such preferred disbursement date must be a Relevant Business Day falling at least 15 (fifteen) days after the date of the Disbursement Request and, in any event, on or before the Final Availability Date. It being understood that notwithstanding the Final Availability Date the Bank may set the disbursement date for the Tranche at a date falling up to 4 (four) months from the date of the Disbursement Request;
(iii) whether the Tranche is a Fixed Rate Tranche or a Floating Rate Tranche, each pursuant to the relevant provisions of Article 3.;
(iv) the preferred interest payment periodicity for the Tranche, chosen in accordance with Article 3;
(v) the preferred terms for repayment of principal for the Tranche, chosen in accordance with Article 4.;
(vi) the preferred first and last dates for repayment of principal for the Tranche;
(vii) the Borrower’s choice of Interest Revision/Conversion Date, if any, for the Tranche; and
(viii) the Disbursement Account to which the disbursement of the Tranche should be made in accordance with Article 1.2.D.
(b) If the Bank, following a request by the Borrower, has provided the Borrower, before the submission of the Disbursement Request, with a non-binding fixed interest rate or spread quotation to be applicable to the Tranche, the Borrower may also at its discretion specify in the Disbursement Request such quotation, that is to say:
(i) in the case of a Fixed Rate Tranche, the aforementioned fixed interest rate previously quoted by the Bank; or
(ii) in the case of a Floating Rate Tranche, the aforementioned spread previously quoted by the Bank,
applicable to the Tranche until the Maturity Date or until the Interest Revision/Conversion Date, if any.
(c) Each Disbursement Request shall be signed by an Authorised Signatory.
(d) The Bank may rely on the information set out in the most recent List of Authorised Signatories and Accounts provided to the Bank by the Borrower.
(e) If a Disbursement Request is signed by a person defined as Authorised Signatory under the most recent List of Authorised Signatories and Accounts provided to the Bank by the Borrower, the Bank may assume that such person has the power to sign and deliver in the name and on behalf of the Borrower such Disbursement Request.
(f) Subject to Article 1.2.C(b), each Disbursement Request is irrevocable.
1.2.C Disbursement Notice
(a) Not less than 10 (ten) days before the proposed Scheduled Disbursement Date of a Tranche the Bank shall, if the Disbursement Request conforms to Article 1.2., deliver to the Borrower a Disbursement Notice which shall specify:
(i) the currency and amount of the Tranche;
(ii) the Scheduled Disbursement Date;
(iii) the interest rate basis for the Tranche, being:
(1) a Fixed Rate Tranche; or
(2) a Floating Rate Tranche,
all pursuant to the relevant provisions of Article 3.;
(iv) the Payment Dates and the first interest Payment Date for the Tranche;
(v) the terms for repayment of principal for the Tranche, in accordance with the provisions of Article 4.;
(vi) the Repayment Dates and the first and the last Repayment Date for the Tranche;
(vii) the Interest Revision/Conversion Date, if requested by the Borrower, for the Tranche; and
(viii) for a Fixed Rate Tranche the Fixed Rate and for a Floating Rate Tranche the Spread applicable to the Tranche until the Interest Revision/Conversion Date, if any or until the Maturity Date.
(b) If one or more conditions specified in the Disbursement Notice received by the Borrower does not conform to the corresponding condition, if any, in the Disbursement Request, the Borrower may revoke its Disbursement Request by a written notice to be received by the Bank not later than 12h00 noon Luxembourg time on the next business day when the Bank is open for general business and thereupon the Disbursement Request and the Disbursement Notice shall be of no effect. If the Borrower has not revoked the Disbursement Request in writing and within the deadline indicated above, the Borrower shall be deemed to have accepted all conditions specified in the Disbursement Notice.
(c) If the Borrower has not specified in the Disbursement Request the fixed interest rate or spread referred to in Article 1.2.B(b), the Borrower will be deemed to have agreed in advance to the Fixed Rate or Spread as subsequently specified in the Disbursement Notice.
1.2.D Disbursement Account
Disbursement shall be made to the Disbursement Account specified in the relevant Disbursement Request, provided that such Disbursement Account is acceptable to the Bank.
Notwithstanding Article 5.2(e), the Borrower acknowledges that payments to a Disbursement Account notified by the Borrower shall constitute disbursements under this Contract as if they had been made to the Borrower’s own bank account.
Only one Disbursement Account may be specified for each Tranche.
1.3 Currency of disbursement
The disbursement of each Tranche shall be made in EUR.
1.4 Conditions of disbursement
1.4.A Condition precedent to the first Disbursement Request
The Bank shall have received from the Borrower in form and substance satisfactory to the Bank:
(a) evidence that the execution of this Contract by the Borrower has been duly authorised and that the person or persons signing this Contract on behalf of the Borrower is/are duly authorised to do so together with the specimen signature of each such person or persons; and
(b) at least 2 (two) originals of this Contract duly executed by all Parties; and
(c) the List of Authorised Signatories and Accounts,
prior to a presentation of a Disbursement Request by the Borrower. Any Disbursement Request made by the Borrower without the above documents having been received by the Bank and to its satisfaction shall be deemed not made.
1.4.B First Tranche
The disbursement of the first Tranche under Article 1.2. is conditional upon receipt by the Bank, in form and substance satisfactory to it, on or before the date falling 5 (five) Business Days before the Scheduled Disbursement Date (and, in the case of deferment under Article 1.5, the Requested Deferred Disbursement Date or the Agreed Deferred Disbursement Date, respectively) for the proposed Tranche, of the following documents or evidence:
(a) evidence that the Borrower has obtained all necessary Authorisations, required in connection with the Project;
(b) a legal opinion, in the English language, issued by the Croatian Minister of Justice on the due execution of this Contract by the Borrower and on the validity and enforceability under Croatian law of the Borrower’s obligations under this Contract, substantially in the form set out in Annex I; and
(c) evidence that the Project Agreement was duly executed and remains in place.
1.4.C Second and subsequent Tranches
The disbursement of second and subsequent Tranches under Article 1.2, is conditional upon receipt by the Bank in form and substance satisfactory to it, at least 5 (five) Business Days before the Scheduled Disbursement Date (and, in the case of deferment under Article 1.5, the Requested Deferred Disbursement Date or the Agreed Deferred Disbursement Date, respectively) for the proposed Tranche, of a written evidence demonstrating that:
(a) at least 80 % (eighty per cent) of the Loan has been allocated to Scheme(s) subject to the Letter(s) of Allocation; and
(b) at least 50 % (fifty per cent) of the Loan has been paid out towards any expenditure incurred with respect to the Scheme(s) subject to the Letter(s) of Allocation.
1.4.D All Tranches
The disbursement of each Tranche under Article 1.2, including the first, is subject to the following conditions:
(a) that the Bank has received, in form and substance satisfactory to it, on or before the date falling 5 (five) Business Days before the Scheduled Disbursement Date (and, in the case of deferment under Article 1.5, the Requested Deferred Disbursement Date or the Agreed Deferred Disbursement Date, respectively) for the proposed Tranche, of the following documents or evidence:
(i) evidence that the Borrower has obtained all necessary Authorisations, required in connection with the borrowing of the Credit on the terms and conditions hereof, including the terms of the relevant Disbursement Notice;
(ii) a certificate from the Borrower in the form of Schedule 0 signed by the Authorised Signatories in accordance with the general representation rules applicable to the Borrower and dated no earlier than the date falling 30 (thirty) days before the Scheduled Disbursement Date (and, in the case of deferment under Article 1.5, the Requested Deferred Disbursement Date or the Agreed Deferred Disbursement Date, respectively);
(iii) a copy of any other authorisation or other document, opinion or assurance which the Bank has notified the Borrower is necessary or desirable in connection with the entry into and performance of, and the transactions contemplated by, this Contract or the legality, validity, binding effect or enforceability of the same; and
(iv) for any Scheme to be financed with the requested Tranche with the likely total cost equal to or in excess of an equivalent of EUR 50,000,000 (fifty million euros) any documentation, as individually indicated by the Bank to the Borrower, which may be deemed necessary by the Bank for individual appraisal of any such Scheme and the approval thereof by the Bank’s governing bodies; and
(v) for any Tranche used to finance Schemes relating to rolling stock or maintenance facilities considered installations necessary for operating passenger transport services implemented by HŽPP, a copy of the current Public Service Contract or equivalent and any further evidence, if needed, that there are no outstanding state aid issues related to such Schemes;
(b) that on the Scheduled Disbursement Date (and, in the case of deferment under Article 1.5, on the Requested Deferred Disbursement Date or the Agreed Deferred Disbursement Date, respectively) for the proposed Tranche:
(i) the representations and warranties which are repeated pursuant to Article 6.10 are correct in all material respects; and
(ii) no event or circumstance which constitutes or would with the passage of time or the giving of notice or the making of any determination under this Contract (or any combination of the foregoing) constitute:
(1) an Event of Default; or
(2) a Prepayment Event,
has occurred and is continuing unremedied or unwaived or would result from the disbursement of the proposed Tranche.
1.5 Deferment of disbursement
1.5.A Grounds for deferment
1.5.A(1) BORROWER’S REQUEST
(a) The Borrower may send a written request to the Bank requesting the deferral of the disbursement of a Notified Tranche. The written request must be received by the Bank at least 5 (five) Business Days before the Scheduled Disbursement Date of the Notified Tranche and specify:
(i) whether the Borrower would like to defer the disbursement in whole or in part, and if in part, the amount to be deferred; and
(ii) the date until which the Borrower would like to defer a disbursement of the above amount (the «Requested Deferred Disbursement Date»), which must be a date, falling not later than:
(1) 6 (six) months from its Scheduled Disbursement Date;
(2) 30 (thirty) days prior to the first Repayment Date; and
(3) the Final Availability Date.
(b) Upon receipt of such a written request, the Bank shall defer the disbursement of the relevant amount until the Requested Deferred Disbursement Date.
1.5.A(2) FAILURE TO SATISFY CONDITIONS TO DISBURSEMENT
(a) The disbursement of a Notified Tranche shall be deferred if any condition for disbursement of such Notified Tranche referred to in Article 1.4 is not fulfilled both:
(i) at the date specified for fulfilment of such condition in Article 1.4.; and
(ii) at its Scheduled Disbursement Date (or, where the Scheduled Disbursement Date has been deferred previously, the date expected for disbursement).
(b) The Bank and the Borrower shall agree the date until which the disbursement of such Notified Tranche shall be deferred (the «Agreed Deferred Disbursement Date»), which must be a date falling:
(i) not earlier than 5 (five) Business Days following the fulfilment of all conditions of disbursement; and
(ii) not later than the Final Availability Date.
(c) Without prejudice to the Bank’s right to suspend and/or cancel the undisbursed portion of the Credit in whole or in part pursuant to Article 1.6.B, the Bank shall defer disbursement of such Notified Tranche until the Agreed Deferred Disbursement Date.
1.5.A(3) DEFERMENT FEE
If disbursement of a Notified Tranche is deferred pursuant to paragraphs 1.5.A(1) or 1.5.A(2) above, the Borrower shall pay the Deferment Fee.
1.5.B Cancellation of a disbursement deferred by 6 (six) months
If a disbursement has been deferred by more than 6 (six) months in aggregate pursuant to Article 1.5.A, the Bank may notify the Borrower in writing that such disbursement shall be cancelled and such cancellation shall take effect on the date of such written notification. The amount of the disbursement which is cancelled by the Bank pursuant to this Article 1.5.B shall remain available for disbursement under Article 1.2.
1.6 Cancellation and suspension
1.6.A Borrower’s right to cancel
(a) The Borrower may send a written notice to the Bank requesting a cancellation of the undisbursed Credit or a portion thereof.
(b) In its written notice, the Borrower:
(i) must specify whether the Credit shall be cancelled in whole or in part and, if in part, the amount of the Credit to be cancelled; and
(ii) must not request any cancellation of:
(1) a Notified Tranche which has a Scheduled Disbursement Date falling within 5 (five) Business Days of the date of such written notice; or
(2) a Tranche in respect of which a Disbursement Request has been submitted but no Disbursement Notice has been issued by the Bank.
(c) Upon receipt of such written notice, the Bank shall cancel the requested portion of the Credit with immediate effect.
1.6.B Bank’s right to suspend and cancel
(a) At any time upon the occurrence of the following events, the Bank may notify the Borrower in writing that the undisbursed portion of the Credit shall be suspended and/or (except upon the occurrence of a Market Disruption Event) cancelled in whole or in part:
(i) a Prepayment Event;
(ii) an Event of Default;
(iii) an event or circumstance which would with the passage of time or the giving of notice or the making of any determination under this Contract (or any combination of the foregoing) constitute a Prepayment Event or an Event of Default; or
(iv) a Market Disruption Event provided the Bank has not issued a Disbursement Notice.
(b) On the date of such written notification from the Bank, the relevant portion of the Credit shall be suspended and/or cancelled with immediate effect. Any suspension shall continue until the Bank ends the suspension or cancels the suspended amount.
1.6.C Indemnity for suspension and cancellation of a Tranche
1.6.C(1) SUSPENSION
If the Bank suspends a Notified Tranche upon the occurrence of an Indemnifiable Prepayment Event or an Event of Default or of an event or circumstance which would (with the passage of time or the giving of notice or the making of any determination under this Contract or any combination of the foregoing) constitute an Indemnifiable Prepayment Event or an Event of Default, the Borrower shall pay to the Bank the Deferment Fee calculated on the amount of such Notified Tranche.
1.6.C(2) CANCELLATION
(a) If a Notified Tranche which is a Fixed Rate Tranche (the «Cancelled Tranche») is cancelled:
(i) by the Borrower pursuant to Article 1.6.A; or
(ii) by the Bank upon an Indemnifiable Prepayment Event or an event or circumstance which would (with the passage of time or the giving of notice or the making of any determination under this Contract or any combination of the foregoing) constitute an Indemnifiable Prepayment Event or pursuant to Article 1.5.B,
the Borrower shall pay to the Bank an indemnity on such Cancelled Tranche.
(b) Such indemnity shall be:
(i) calculated assuming that the Cancelled Tranche had been disbursed and repaid on the same Scheduled Disbursement Date or, to the extent the disbursement of the Tranche is currently deferred or suspended, on the date of the cancellation notice; and
(ii) in the amount communicated by the Bank to the Borrower as the present value (calculated as of the date of cancellation) of the excess, if any, of:
(1) the interest that would accrue thereafter on the Cancelled Tranche over the period from the date of cancellation pursuant to this Article 1.6.C(2), to the Interest Revision/Conversion Date, if any, or the Maturity Date, if it were not cancelled; over
(2) the interest that would so accrue over that period, if it were calculated at the Redeployment Rate, less 0.19 % (nineteen basis points).
The said present value shall be calculated at a discount rate equal to the Redeployment Rate applied as of each relevant Payment Date of the applicable Tranche.
(c) If the Bank cancels any Notified Tranche upon the occurrence of an Event of Default, the Borrower shall indemnify the Bank in accordance with Article 10.3.
1.7 Cancellation after expiry of the Credit
On the day following the Final Availability Date, unless otherwise specifically notified in writing by the Bank to the Borrower, any part of the Credit in respect of which no Disbursement Request has been made in accordance with Article 1.2.B shall be automatically cancelled, without any further notice from the Bank to the Borrower and without any liability arising on the part of either Party.
1.8 Sums due under Articles 1.5 and 1.6
Sums due under Articles 1.5 and 1.6 shall be payable:
(a) in EUR; and
(b) within 15 (fifteen) days of the Borrower’s receipt of the Bank’s demand or within any longer period specified in the Bank’s demand.
1.9 Allocation and reallocation of Credit or Loan
1.9.A Allocation procedure
Between the date hereof and the date falling 3 (three) months before the Final Availability Date (the «Allocation Period»), the Borrower (acting through the Promoter) may submit to the Bank a request for allocation (hereinafter referred to as the «Allocation Request»). In order to qualify for financing hereunder, each Scheme has to meet the Bank’s eligibility criteria and comply with the Technical Description (Schedule A).
1.9.B Allocation Request
(a) The Borrower (acting through the Promoter) may submit to the Bank one or more Allocation Requests under this Contract.
(b) The availability of the EIB Funds with respect to any Scheme shall be established by successive allocations of the EIB Funds to eligible Schemes made by the Bank in accordance with the procedure described in this Article 1.9 and in Sections A.1.1 to A.1.4 of Schedule A.1.
(c) Each Allocation Request for a Scheme to be co-financed with the EU Funds must be submitted together with evidence of EU Funds available for co-financing of such a Scheme.
(d) The Bank shall have full discretion whether or not to approve the Allocation Request submitted by the Borrower (acting through the Promoter) following such examination of a Scheme as the Bank deems necessary. The Bank shall, in the event of approval of the Allocation Request, issue a letter of allocation (»Letter of Allocation»), informing the Borrower (through the Promoter) of its approval of the Scheme(s) submitted and specifying the amount of the EIB Funds, allocated to any such Scheme.
1.9.C Re-allocation
1.9.C(1) RE-ALLOCATION AT THE REQUEST OF THE BORROWER (ACTING THROUGH THE PROMOTER)
Until the date falling on 3 (three) months before the Final Availability Date the Borrower (acting through the Promoter) may, subject to the procedure described in Articles 1.9.A and 1.9.B, request the Bank to re-allocate any part of the EIB Funds, which has been already allocated. The Promoter’s request should include the reasons for the requested re-allocation.
1.9.C(2) RE-ALLOCATION AT THE REQUEST OF THE BANK
The Borrower shall propose to re-allocate any part of the EIB Funds which has been allocated in accordance with Article 1.9.B, if any Scheme subject to the Letter of Allocation from the Bank, is or becomes, in the opinion of the Bank, ineligible for financing by the Bank under the Bank’s Statute, policies or guidelines or under article 309 of the Treaty on the Functioning of the European Union. The Bank shall notify its opinion to the Promoter in writing.
1.9.C(3) RE-ALLOCATION PROCEDURES
The Bank shall carry out any such examination or appraisal, based on such information or documents as the Bank may reasonably require from the Borrower or Promoter with respect to the financing, procurement, implementation, operation and environmental or social impact of, or for a Scheme proposed for re-allocation.
The Bank shall, in the event of approval, issue a Letter of Allocation.
Article 2
The Loan
2.1 Amount of Loan
The Loan shall comprise the aggregate amount of Tranches disbursed by the Bank under the Credit, as confirmed by the Bank pursuant to Article 1.12.
2.2 Currency of payments
The Borrower shall pay interest, principal and other charges payable in respect of each Tranche in the currency in which the Tranche is disbursed.
Other payments, if any, shall be made in the currency specified by the Bank having regard to the currency of the expenditure to be reimbursed by means of that payment.
2.3 Confirmation by the Bank
The Bank shall deliver to the Borrower the amortisation table referred to in Article 1.16, if any, showing the Disbursement Date, the currency, the amount disbursed, the repayment terms and the interest rate for each Tranche, not later than 10 (ten) calendar days after the Scheduled Disbursement Date for such Tranche.
Article 3
Interest
3.1 Rate of interest
3.1.A Fixed Rate Tranches
The Borrower shall pay interest on the outstanding balance of each Fixed Rate Tranche at the Fixed Rate quarterly, semi-annually or annually in arrear on the relevant Payment Dates as specified in the Disbursement Notice, commencing on the first such Payment Date following the Disbursement Date of the Tranche. If the period from the Disbursement Date to the first Payment Date is 15 (fifteen) days or less then the payment of interest accrued during such period shall be postponed to the following Payment Date.
Interest shall be calculated on the basis of Article 1.20(a).
3.1.B Floating Rate Tranches
The Borrower shall pay interest on the outstanding balance of each Floating Rate Tranche at the Floating Rate quarterly or semi-annually in arrear on the relevant Payment Dates, as specified in the Disbursement Notice commencing on the first such Payment Date following the Disbursement Date of the Tranche. If the period from the Disbursement Date to the first Payment Date is 15 (fifteen) days or less then the payment of interest accrued during such period shall be postponed to the following Payment Date.
The Bank shall notify the Borrower of the Floating Rate within 10 (ten) days following the commencement of each Floating Rate Reference Period.
If pursuant to Articles 1.5 and 1.6 disbursement of any Floating Rate Tranche takes place after the Scheduled Disbursement Date the EURIBOR applicable to the first Floating Rate Reference Period shall be determined in accordance with Prilog B for the Floating Rate Reference Period commencing on the Disbursement Date and not on the Scheduled Disbursement Date.
Interest shall be calculated in respect of each Floating Rate Reference Period on the basis of Article 1.20(b).
3.1.C Revision or Conversion of Tranches
Where the Borrower exercises an option to revise or convert the interest rate basis of a Tranche, it shall, from the effective Interest Revision/Conversion Date (in accordance with the procedure set out in Prilog D) pay interest at a rate determined in accordance with the provisions of Prilog D.
3.2 Interest on overdue sums
Without prejudice to 0 and by way of exception to Article 1.13, if the Borrower fails to pay any amount payable by it under this Contract on its due date, interest shall accrue on any overdue amount payable under the terms of this Contract from the due date to the date of actual payment at an annual rate equal to:
(a) for overdue sums related to Floating Rate Tranches, the applicable Floating Rate plus 2 % (200 basis points);
(b) for overdue sums related to Fixed Rate Tranches, the higher of:
(i) the applicable Fixed Rate plus 2 % (200 basis points); or
(ii) the EURIBOR (one month) plus 2 % (200 basis points); and
(c) for overdue sums other than under (a) or (b) above, the EURIBOR (one month) plus 2 % (200 basis points),
and shall be payable in accordance with the demand of the Bank. For the purpose of determining the EURIBOR in relation to this Article 1.14(b) and (c), the relevant periods within the meaning of Prilog B shall be successive periods of 1 (one) month commencing on the due date.
Any unpaid but due interest may be capitalised in conformity with article 1154 of the Luxembourg Civil Code. For the avoidance of doubt, capitalisation of interest shall occur only for interest due but unpaid for a period of more than one year. The Borrower hereby agrees in advance to have the unpaid interest due for a period of more than one year compounded and that as of the capitalisation, such unpaid interest will in turn produce interest at the interest rate set out in this Article 3.2.
3.3 Market Disruption Event
(a) If at any time:
(i) from the issuance by the Bank of the Disbursement Notice in respect of a Tranche; and
(ii) until the date falling 30 (thirty) calendar days prior to the Scheduled Disbursement Date for Tranches to be disbursed in EUR; a Market Disruption Event occurs, the Bank may notify the Borrower that this Article 1.15 has come into effect.
(b) The rate of interest applicable to such Notified Tranche until the Maturity Date or the Interest Revision/Conversion Date, if any, shall be the rate (expressed as a percentage rate per annum) which is determined by the Bank to be the all-inclusive cost to the Bank for the funding of the relevant Tranche based upon the then applicable internally generated Bank reference rate or an alternative rate determination method reasonably determined by the Bank.
(c) The Borrower shall have the right to refuse in writing such disbursement within the deadline specified in the notice and it shall bear charges incurred as a result, if any, in which case the Bank shall not effect the disbursement and the corresponding portion of the Credit shall remain available for disbursement under Article 1.2.
(d) If the Borrower does not refuse the disbursement in time, the Parties agree that the disbursement in EUR and the conditions thereof shall be fully binding for both Parties.
(e) The Spread or Fixed Rate previously notified by the Bank shall no longer be applicable.
Article 4
Repayment
4.1 Normal repayment
4.1.A Repayment by Instalments
(a) The Borrower shall repay each Tranche by instalments on the Repayment Dates specified in the relevant Disbursement Notice in accordance with the terms of the amortisation table delivered pursuant to Article 2.3.
(b) Each amortisation table shall be drawn up on the basis that:
(i) in the case of a Fixed Rate Tranche without an Interest Revision/Conversion Date, repayment shall be made quarterly, semi-annually or annually by equal instalments of principal or constant instalments of principal and interest;
(ii) in the case of a Fixed Rate Tranche with an Interest Revision/Conversion Date or a Floating Rate Tranche, repayment shall be made by equal quarterly, semiannual or annual instalments of principal;
(iii) the first Repayment Date of each Tranche shall fall not earlier than 30 (thirty) days from the Scheduled Disbursement Date and not later than the Repayment Date immediately following the 5th (fifth) anniversary of the Scheduled Disbursement Date of the Tranche; and
(iv) the last Repayment Date of each Tranche shall fall not earlier than 4 (four) years and not later than 30 (thirty) years from the Scheduled Disbursement Date.
4.1.B Single instalment
Alternatively, the Borrower shall repay the Tranche in a single instalment on the sole Repayment Date specified in the Disbursement Notice, being a date falling not less than 3 (three) years or more than 17 (seventeen) years from the Scheduled Disbursement Date.
4.2 Voluntary prepayment
4.2.A Prepayment option
Subject to Articles 1.17.B, 1.17.C and 1.19, the Borrower may prepay all or part of any Tranche, together with accrued interest and indemnities if any, upon giving a Prepayment Request with at least 30 (thirty) calendar days’ prior notice specifying:
(a) the Prepayment Amount;
(b) the Prepayment Date, which shall be a Payment Date;
(c) if applicable, the choice of application method of the Prepayment Amount in line with Article 1.24.C(a); and
(d) the Contract Number.
The Prepayment Request shall be irrevocable.
4.2.B Prepayment indemnity
4.2.B(1) FIXED RATE TRANCHE
Subject to Article 1.17.B(3) below, if the Borrower prepays a Fixed Rate Tranche, the Borrower shall pay to the Bank on the Prepayment Date the Prepayment Indemnity in respect of the Fixed Rate Tranche which is being prepaid.
4.2.B(2) FLOATING RATE TRANCHE
Subject to Article 1.17.B(3) below, the Borrower may prepay a Floating Rate Tranche without indemnity.
4.2.B(3) REVISION/CONVERSION
Prepayment of a Tranche on its Interest Revision/Conversion Date may be effected without indemnity except if the Borrower has accepted pursuant to Prilog D a Fixed Rate under an Interest Revision/Conversion Proposal.
4.2.C Prepayment mechanics
Upon presentation by the Borrower to the Bank of a Prepayment Request, the Bank shall issue a Prepayment Notice to the Borrower, not later than 15 (fifteen) days prior to the Prepayment Date. The Prepayment Notice shall specify the Prepayment Amount, the accrued interest due thereon, the Prepayment Indemnity payable under Article 4.2.B or, as the case may be, that no indemnity is due, the method of application of the Prepayment Amount and, if a Prepayment Indemnity is applicable, the deadline by which the Borrower may accept the Prepayment Notice.
If the Borrower accepts the Prepayment Notice no later than by the deadline (if any) specified in the Prepayment Notice, the Borrower shall effect the prepayment. In any other case, the Borrower may not effect the prepayment.
The Borrower shall accompany the payment of the Prepayment Amount by the payment of accrued interest, the Prepayment Indemnity due on the Prepayment Amount, as specified in the Prepayment Notice and the fee under Article 4.2.D, if any.
4.2.D Administrative Fee
If the Borrower prepays a Tranche on a date other than a relevant Payment Date, or if the Bank exceptionally accepts, solely upon the Bank’s discretion, a Prepayment Request with prior notice of less than 30 (thirty) calendar days, the Borrower shall pay to the Bank an administrative fee in such amount as the Bank shall notify to the Borrower.
4.3 Compulsory prepayment and cancellation
4.3.A Prepayment Events
4.3.A(1) PROJECT COST REDUCTION EVENT
(a) The Borrower (acting through the Promoter) shall promptly inform the Bank if a Project Cost Reduction Event has occurred or is likely to occur. At any time after the occurrence of a Project Cost Reduction Event the Bank may, by notice to the Borrower and the Promoter, cancel the undisbursed portion of the Credit and/or demand prepayment of the Loan Outstanding up to the amount by which the EIB Funds exceeds the limits referred to in paragraph (c) below together with accrued interest and all other amounts accrued and outstanding under this Contract in relation to the proportion of the Loan Outstanding to be prepaid.
(b) The Borrower shall effect payment of the amount demanded on the date specified by the Bank, such date falling not less than 30 (thirty) days from the date of the demand.
(c) For the purpose of this Article, «Project Cost Reduction Event» means that the total cost of the Project falls below the figure stated in Recital (b) so that the amount of the EIB Funds exceeds:
(i) 50 % (fifty per cent) of such total cost of the Project as allocated to the Project by the Bank under any Letter(s) of Allocation;
(ii) when aggregated with the amount of any other EU Funds made available for the Project, 90 % (ninety per cent) of such total cost of the Project as allocated to the Project by the Bank under any Letter(s) of Allocation; or
(iii) 100 % (one hundred per cent) of eligible investment costs (as such costs are defined in the Technical Description), in relation to the Project.
4.3.A(2) CHANGE OF LAW EVENT
(a) The Borrower shall promptly inform the Bank if a Change-of-Law Event has occurred or is likely to occur. In such case, or if the Bank has reasonable cause to believe that a Change-of-Law Event has occurred or is about to occur, the Bank may request that the Borrower consult with it. Such consultation shall take place within 30 (thirty) days from the date of the Bank’s request. If, after the lapse of 30 (thirty) days from the date of such request for consultation the Bank is of the opinion that:
(i) such Change-of-Law Event would materially impair the Borrower’s ability to perform its obligations under this Contract; and
(ii) the effects of such Change-of-Law Event cannot be mitigated to its satisfaction,
the Bank may by notice to the Borrower, cancel the undisbursed portion of the Credit and/or demand prepayment of the Loan Outstanding, together with accrued interest and all other amounts accrued and outstanding under this Contract.
(b) The Borrower shall effect payment of the amount demanded on the date specified by the Bank, such date being a date falling not less than 30 (thirty) days from the date of the demand.
(c) For the purposes of this Article «Change-of-Law Event» means the enactment, promulgation, execution or ratification of or any change in or amendment to any law, rule or regulation (or in the application or official interpretation of any law, rule or regulation) that occurs after the date of this Contract and which could impair the Borrower’s ability to perform its obligations under this Contract.
4.3.A(3) ILLEGALITY EVENT
(a) Upon becoming aware of an Illegality Event:
(i) the Bank shall promptly notify the Borrower; and
(ii) the Bank may immediately (A) suspend or cancel the undisbursed portion of the Credit, and/or (B) demand prepayment of the Loan Outstanding, together with accrued interest and all other amounts accrued and outstanding under this Contract on the date indicated by the Bank in its notice to the Borrower.
(b) For the purposes of this Article, «Illegality Event» means that it becomes unlawful in any applicable jurisdiction, or if it becomes contrary to any Sanctions, for the Bank to:
(i) perform any of its obligations as contemplated in this Contract; or
(ii) fund or maintain the Loan.
4.3.A(4) NON UTILISATION EVENT
(a) If at the end of the Allocation Period, a Non Utilisation Event has occurred or is continuing unremedied, the Bank may, in proportion to the amount that failed to be allocated or re-allocated pursuant to Article 1.9, by notice to the Borrower, cancel the undisbursed portion of the Credit and/or demand immediate prepayment of the Loan Outstanding together with accrued interest and all other amounts accrued and outstanding under this Contract on the date indicated by the Bank in its notice to the Borrower.
(b) For the purposes of this Article, the «Non Utilisation Event» means that:
(i) any part of the EIB Funds has failed to be allocated to any Schemes subject to the Letter(s) of Allocation and pursuant to Article 1.9; or
(ii) any re-allocation pursuant to Article 1.9.C is not possible or possible only in part.
4.3.A(5) AFFECTED SCHEME EVENT
(a) The Borrower or the Promoter shall promptly inform the Bank if an Affected Scheme Event has occurred.
(b) If the Borrower or the Promoter notify the Bank of an Affected Scheme Event, or if the Bank becomes aware of any such Affected Scheme and notifies the Borrower and the Promoter to that effect, then the Borrower shall, within a period of 60 (sixty) days following its giving, or receiving of any such notice:
(i) take steps to remedy, to the Bank’s satisfaction, the event referred to in (a) above; and/or
(ii) request the Bank to re-allocate any part of the Credit or the EIB Funds allocated to the Affected Scheme to another eligible Scheme pursuant to Article 1.9.C,
failing which, the Bank may by further notice to the Borrower demand that the Borrower prepays the Loan Outstanding in the amount originally allocated to any such Affected Scheme on the date indicated by the Bank in its notice to the Borrower.
(c) For the purpose of this Contract:
(i) an «Affected Scheme» means a Scheme affected by an Affected Scheme Event;
(ii) an «Affected Scheme Event» means that:
(1) the Borrower, the Promoter or the Project Company has failed to comply with the Environmental and Social Law or any laws of the European Union and the Republic of Croatia with respect to state aid or public procurement with respect to any Scheme;
(2) an EU Funds Event has occurred or is likely to occur in relation to any Scheme;
(3) the Bank has issued a Letter of Allocation with respect to a Scheme that, contrary to the representation from the Borrower and/or Promoter delivered with any Allocation Request, is subject to the relevant EIA procedures; or
(4) the Borrower or the Promoter has applied the proceeds of the EIB Funds to finance any Scheme that, when applicable, failed to be subject to a relevant EIA procedures or a biodiversity assessment in accordance with the Birds Directive and/or the Habitats Directive; and
(iii) an «EU Funds Event» means any of the following (whether directly or indirectly) in relation to any Scheme:
(1) the Borrower is required to reimburse or repay any contribution from EU Funds in whole or in part as a result of a recovery, financial correction or similar procedures triggered by any irregularities in relation to such contribution from EU Funds for the reasons attributable to the Borrower; or
(2) otherwise than for the reasons indicated in item (1) above, EU Funds cease to be available or have been cancelled in full or in part and the financing of such Scheme from other resources has not been ensured by the Borrower or the Promoter to the satisfaction of the Bank.
(d) In case of substitution of any Affected Scheme with any other Scheme, the allocation deadlines set out in Article 1.9 shall not apply. The Borrower or the Promoter shall deliver to the Bank a list of any such substitutions in a form acceptable to the Bank.
4.3.B Prepayment mechanics
Any sum demanded by the Bank pursuant to Article 4.3.A, together with any interest or other amounts accrued or outstanding under this Contract including, without limitation, any indemnity due under Article 4.3.C, shall be paid on the Prepayment Date indicated by the Bank in its notice of demand.
4.3.C Prepayment indemnity
4.3.C(1) FIXED RATE TRANCHE
If the Borrower prepays a Fixed Rate Tranche in case of an Indemnifiable Prepayment Event, the Borrower shall pay to the Bank on the Prepayment Date the Prepayment Indemnity in respect of the Fixed Rate Tranche that is being prepaid.
4.3.C(2) FLOATING RATE TRANCHE
The Borrower may prepay the Floating Rate Tranches without the Prepayment Indemnity.
4.4 General
4.4.A No prejudice to Article 10
This 0 shall not prejudice 0.
4.4.B No reborrowing
A repaid or prepaid amount may not be reborrowed.
Article 5
Payments
5.1 Day count convention
Any amount due by way of interest, indemnity or the Deferment Fee from the Borrower under this Contract, and calculated in respect of a fraction of a year, shall be determined on the following respective conventions:
(a) under a Fixed Rate Tranche, a year of 360 (three hundred and sixty) days and a month of 30 (thirty) days; and
(b) under a Floating Rate Tranche, a year of 360 (three hundred and sixty) days for EUR and the number of days elapsed.
5.2 Time and place of payment
(a) Unless otherwise specified in this Contract or in the Bank’s demand, all sums other than sums of interest, indemnity and principal are payable within 15 (fifteen) days of the Borrower’s receipt of the Bank’s demand.
(b) Each sum payable by the Borrower under this Contract shall be paid to the relevant account notified by the Bank to the Borrower. The Bank shall notify the account not less than 15 (fifteen) days before the due date for the first payment by the Borrower and shall notify any change of account not less than 15 (fifteen) days before the date of the first payment to which the change applies. This period of notice does not apply in the case of payment under 0.
(c) The Borrower shall indicate the Contract Number in the payment details for each payment made hereunder.
(d) A sum due from the Borrower shall be deemed paid when the Bank receives it.
(e) Any disbursements by and payments to the Bank under this Contract shall be made using the Disbursement Account (for disbursements by the Bank) and the Payment Account (for payments to the Bank).
5.3 No set-off by the Borrower
All payments to be made by the Borrower under this Contract shall be calculated and be made without (and free and clear of any deduction for) set-off or counterclaim.
5.4 Disruption to Payment Systems
If either the Bank determines (in its discretion) that a Disruption Event has occurred or the Bank is notified by the Borrower that a Disruption Event has occurred:
(a) the Bank may, and shall if requested to do so by the Borrower, consult with the Borrower with a view to agreeing with the Borrower such changes to the operation or administration of this Contract as the Bank may deem necessary in the circumstances;
(b) the Bank shall not be obliged to consult with the Borrower in relation to any changes mentioned in paragraph (a) if, in its opinion, it is not practicable to do so in the circumstances and, in any event, shall have no obligation to agree to such changes; and
(c) the Bank shall not be liable for any damages, costs or losses whatsoever arising as a result of a Disruption Event or for taking or not taking any action pursuant to or in connection with this Article 5.4.
5.5 Application of sums received
5.5.A General
Sums received from the Borrower shall only discharge its payment obligations if received in accordance with the terms of this Contract.
5.5.B Partial payments
If the Bank receives a payment that is insufficient to discharge all the amounts then due and payable by the Borrower under this Contract, the Bank shall apply that payment in the order set out below, in or towards:
(a) pro rata to each of any unpaid fees, costs, indemnities and expenses due under this Contract;
(b) any accrued interest due but unpaid under this Contract;
(c) any principal due but unpaid under this Contract; and
(d) any other sum due but unpaid under this Contract.
5.5.C Allocation of sums related to Tranches
(a) In case of:
(i) a partial voluntary prepayment of a Tranche that is subject to a repayment in several instalments, the Prepayment Amount shall be applied pro rata to each outstanding instalment, or, at the request of the Borrower, in inverse order of maturity; or
(ii) a partial compulsory prepayment of a Tranche that is subject to a repayment in several instalments, the Prepayment Amount shall be applied in reduction of the outstanding instalments in inverse order of maturity.
(b) Sums received by the Bank following a demand under Article 1.44 and applied to a Tranche, shall reduce the outstanding instalments in inverse order of maturity. The Bank may apply sums received between Tranches at its discretion.
(c) In case of receipt of sums which cannot be identified as applicable to a specific Tranche, and on which there is no agreement between the Bank and the Borrower on their application, the Bank may apply these between Tranches at its discretion.
Article 6
Borrower undertakings and representations
The undertakings in this 0 remain in force from the date of this Contract for so long as any amount is outstanding under this Contract or the Credit is in force.
6.1 Use of Loan and availability of other funds
The Borrower and the Promoter shall, or shall procure that each Project Company will, use all amounts borrowed by it under this Contract for the execution of the Project.
The Borrower and the Promoter shall ensure that they have available to them other funds listed in Recital (b) and that such funds are expended, to the extent required, on the financing of the Project.
6.2 Completion of Project
The Borrower (acting through the Promoter) shall, or shall procure that each Project Company will, carry out the Project in accordance with the Technical Description as may be modified from time to time with the approval of the Bank, and complete it by the final date specified therein.
6.3 Increased cost of Project
If the total cost of the Project exceeds the estimated figure set out in Recital (b), the Borrower (acting through the Promoter) shall, or shall procure that the relevant Project Company will obtain the finance to fund the excess cost without recourse to the Bank, so as to enable the Project to be completed in accordance with the Technical Description. The plans for funding the excess cost shall be communicated to the Bank without delay.
6.4 Procurement procedure
(a) The Borrower and the Promoter shall, or shall procure that each Project Company will, procure works, services or goods for the Project:
(i) in accordance with EU Law in general and in particular with the relevant European Union procurement directives, if the latter are applicable;
(ii) in accordance with procurement procedures which, to the satisfaction of the Bank, respect the criteria of economy and efficiency and the principles of transparency, equal treatment and non-discrimination on the basis of nationality, in case of public contracts not subject to the European Union procurement directives; or
(iii) in accordance with procurement procedures which, to the satisfaction of the Bank, respect the criteria of economy and efficiency in case of contracts other than public contracts not subject to the European Union procurement directives.
(b) For cases of paragraphs (a)(i) and (a)(ii) above, the Borrower and the Promoter or the Project Company shall request in the tender documents or other reference documents for the procurement procedures referred to in Article 1.28(a) above that the bidder declares whether or not it is subject to any exclusion decision or temporary suspension pursuant to the ExclusionPolicy.
(c) If a bidder declares to the Borrower or the Promoter or the Project Company prior to the contract award that it is subject to any exclusion decision or temporary suspension covered by the Exclusion Policy, the Borrower or the Promoter or the Project Company shall engage with the Bank in good faith and shall make best efforts in order to:
(i) achieve an exclusion of such a bidder under applicable law so that the bidder does not participate in the Project or, should such an exclusion not be possible; or
(ii) restructure the scope of the Project so that no proceeds of the Loan be applied towards any works or services under any contract awarded to that bidder, unless otherwise agreed with the Bank.
6.5 Continuing Project undertakings
The Borrower shall, or shall procure that the Promoter and each Project Company will:
(a) Maintenance: maintain, repair, overhaul and renew all property forming part of the Project as required to keep it in good working order;
(b) Project assets: unless the Bank shall have given its prior consent in writing, retain title to and possession of substantially all the assets comprising the Project or, as appropriate, replace and renew such assets and maintain the Project in substantially continuous operation in accordance with its original purpose; the Bank may withhold its consent only where the proposed action would prejudice the Bank’s interests as lender to the Borrower or would render the Project ineligible for financing by the Bank under its Statute or under article 309 of the Treaty on the Functioning of the European Union;
(c) Insurance: ensure that all works and property forming part of the Project are adequately insured in accordance with the standard practice for similar works and property of public interest;
(d) Rights and Permits: maintain in force all rights of way or use and all Authorisations necessary for the execution and operation of the Project;
(e) Environment and Social Matters:
(i) implement and operate the Project materially in compliance with Environmental and Social Law;
(ii) obtain and maintain requisite Environmental and Social Approvals for the Project;
(iii) comply with any such Environmental and Social Approvals;
(iv) ensure that, unless the Borrower or the Promoter or the Project Company has obtained relevant Authorisations and the Non-Technical Summary of the EIA has been made available to the public, no proceeds of the EIB Funds will be used to finance any Scheme that is subject to a relevant EIA procedure or biodiversity assessment in accordance with the Birds Directive and the Habitats Directive; and
(v) procure and deliver to the Bank, as soon as available, however, no later than before its submission of the Project completion report (pursuant to Article 1.38(a)(i), below), energy performance certificate(s) in accordance with the Council Directive on Energy Performance of Buildings (Directive 2010/31/EU) in relation to any Scheme comprising any building and provide the Bank with all corresponding information that may be required by the Bank (including the energy efficiency performance indicators for each Scheme, if available and when applicable);
(f) Integrity: take, within a reasonable timeframe, appropriate measures in respect of:
(i) any of its employees with direct control and/or decision powers over any Scheme, the Credit or the Loan; or
(ii) any member of management bodies of the Project Company,
who has been convicted by a final and irrevocable court ruling of an Illegal Activity perpetrated in the course of the exercise of his/her professional duties, in order to ensure that such member is excluded from any activity in relation to the Credit, Loan or any Scheme or any other financial indebtedness from the Bank;
(g) Integrity Audit Rights: ensure that all contracts under the Project to be procured after the date of signature of this Contract in accordance with EU Directives on procurement provide for:
(i) the requirement that the relevant contractor promptly informs the Bank of a genuine allegation, complaint or information with regard to Illegal Activities related to any Scheme;
(ii) the requirement that the relevant contractor keeps books and records of all financial transactions and expenditures in connection with any Scheme; and
(iii) the Bank’s right, in relation to an alleged Illegal Activity, to review the books and records of the relevant contractor in relation to any Scheme and to take copies of documents unless prohibited by law;
(h) Allocation Procedures: comply with the allocation procedures applicable to the Project, as may be modified by the Bank from time to time in accordance with Article 1.9 of this Contract;
(i) Allocation monitoring: ensure that at the end of the physical implementation of all Schemes under the Project the amount of the EIB Funds disbursed towards such Schemes does not exceed the amount of allocations made by the Bank in relation to all such Schemes under the Letters of Allocation. The Borrower (acting through the Promoter) will promptly inform the Bank when the implementation of any allocated Scheme is suspended or the Scheme is cancelled;
(j) Public Service Contract: prior to allocating any Schemes towards investment in passenger of freight rolling stock, ensure to provide information concerning the operation arrangements, including confirmation of compliance of the current and anticipated follow-up PSC with the Regulation 1370/2007 EU relating to tendering of contracts for provision of passenger railway services. The Borrower or Promoter shall promptly inform the Bank on current and future contracts for national passenger services, specifically planned tender processes, the outcomes of these and all factors with significant influence on timing, content and outcome including-but not limited to legal proceedings, changes to schedules and other important changes thereto;
(k) State aid: implement and operate the Project in conformity with any laws of the European Union and the Republic of Croatia with respect to state aid.
(l) No double financing: ensure that no Scheme is financed from the proceeds of any Total Financial Indebtedness made available to the Borrower or to any Project Company by the Bank other than the EIB Funds; and