Tekst izvorne objave
NN-MU 5/2006Sažetak
Bez Sažetka
Ostalo
Bez Sažetka
HRVATSKI SABOR
72
Na temelju članka 88. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU MEMORANDUMA O FINANCIRANJU USUGLAŠENOG IZMEĐU EUROPSKE KOMISIJE I VLADE REPUBLIKE HRVATSKE O DODJELI POMOĆI IZ INSTRUMENTA ZA PRETPRISTUPNU STRUKTURNU POLITIKU ZA SLJEDEĆU MJERU: PROGRAM ZA VODE I OTPADNE VODE U KARLOVCU, ZA GRAD KARLOVAC, KARLOVČKA ŽUPANIJA, HRVATSKA
Proglašavam Zakon o potvrđivanju Memoranduma o financiranju usuglašenog između Europske komisije i Vlade Republike Hrvatske o dodjeli pomoći iz Instrumenta za pretpristupnu strukturnu politiku za sljedeću mjeru: Program za vode i otpadne vode u Karlovcu, za Grad Karlovac, Karlovčka županija, Hrvatska, kojega je Hrvatski sabor donio na sjednici 18. svibnja 2006. godine.
Klasa: 011-01/06-01/16
Urbroj: 71-05-03/1-06-2
Zagreb, 24. svibnja 2006.
Predsjednik
Republike Hrvatske
Stjepan Mesić, v. r.
ZAKON
O POTVRĐIVANJU MEMORANDUMA O FINANCIRANJU USUGLAŠENOG IZMEĐU EUROPSKE KOMISIJE I VLADE REPUBLIKE HRVATSKE O DODJELI POMOĆI IZ INSTRUMENTA ZA PRETPRISTUPNU STRUKTURNU POLITIKU ZA SLJEDEĆU MJERU: PROGRAM ZA VODE I OTPADNE VODE U KARLOVCU, ZA GRAD KARLOVAC, KARLOVAČKA ŽUPANIJA, HRVATSKA
Članak 1.
Potvrđuje se Memorandum o financiranju usuglašen između Europske komisije i Vlade Republike Hrvatske o dodjeli pomoći iz Instrumenta za pretpristupnu strukturnu politiku za sljedeću mjeru: Program za vode i otpadne vode u Karlovcu za Grad Karlovac, Karlovačka županija, Hrvatska, potpisan 30. siječnja 2006., u izvorniku na engleskom jeziku.
Članak 2.
Tekst Memoranduma iz članka 1. ovoga Zakona u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik glasi:
ISPA Measure No: 2005 HR 16 P PE 001
FINANCING MEMORANDUM
Agreed between the European Commission and the Government of the Republic of Croatia Concerning the grant of assistance from the Instrument for Structural Policies for Pre-accession to the following measure Karlovac Water and Waste Water Programme located in Town of Karlovac, Karlovacka County in Croatia
The European Commission, hereinafter referred to as «the Commission», acting for and on behalf of the European Community, hereinafter referred to as «the Community» represented by the Director General for Regional Policy, Mr Graham Meadows, for the Commission
on the one part, and
The Government of the Republic of Croatia, acting on behalf of the Republic of Croatia, hereinafter referred to as “the beneficiary”
on the other part,
HAVE AGREED AS FOLLOWS:
Article 1
The measure referred to in Article 2 below shall be implemented and financed out of the budgetary resources of the Community in accordance with the provisions set out in this Memorandum. The measure referred to in Article 2 below shall be implemented in line with the General Conditions annexed to the Framework Agreement signed between the Commission and the beneficiary and supplemented by the terms of this Memorandum and the provisions annexed hereto.
Article 2
Identification of the measure
The Instrument for Structural Policies for Pre-accession shall contribute, by way of a grant, towards the financing of the following measure as described in Annex I:
Measure number: 2005 HR 16 P PE 001
Title: Karlovac Water and Waste Water Programme – Town of Karlovac
Duration: Start date: The date of signature of the financing memorandum by the Commission
End date: 31/12/2010
Location: Municipality of Karlovac, Karlovacka County
Group:Kupa River, Danube River Basin
Article 3
Commitment
1. The maximum public or equivalent expenditure which may be taken into account for the purpose of calculating assistance shall be € 36 000 000;
2. The rate of Community assistance granted to the measure is fixed at 62.5 % of total public or equivalent expenditure as indicated in the financing plan in Annex II;
3. The maximum amount of assistance from the Instrument for Structural Policies for Pre-accession is fixed at € 22 500 000;
4. An amount of € 12 300 000 is committed from the 2005 budget under budgetary line 13.050101 Commitments in respect of subsequent instalments shall be based on the initial or revised financing plan for the measure, subject to the state of implementation of the measure and to budgetary availability.
Article 4
Payments
1. Community assistance shall cover payments on the measure for which legally binding commitments have been made by the Beneficiary and for which the requisite finance has been specifically allocated. These payments must relate to the works described in Annex I.
2. Payments made before the date of signature of Financing Memorandum by the Commission shall not be eligible for assistance from the Instrument for Structural Policies for Pre-accession.
3. The measure described in Annex I and payments by the body responsible for the implementation of the measure shall be completed no later than the End date indicated in the Article 2 above.
The report required for the payment of the final balance should be submitted not later than 6 months after this date.
4. The advance payment is fixed at € 4 500 000, which shall be transferred as follows:
– An amount of € 2 250 000 is paid out after signature of this memorandum by the Beneficiary and fulfilment of the conditions in Article (8) 3;
– The remainder is paid out after signature of the first substantial works contract indicated in the procurement plan and fulfilment of the conditions in Article 8 (4) hereunder.
Article 5
Respect of Community law and policies
The measure shall be carried out in compliance with the relevant provisions set out in the Stabilisation and Association Agreement1 and shall contribute to the achievement of Community policies, in particular those concerning environmental protection and improvement.
Article 6
Intellectual property
The Beneficiary and the authority responsible for implementation mentioned in Annex I point 3 shall ensure that they acquire all necessary intellectual property rights to studies, drawings, plans, publicity and other material made in conjunction with planning, implementation, monitoring and evaluation of the project. They shall guarantee that the Commission, or any body or person delegated by the Commission shall have access and the right to use such material. The Commission will only use such material for its own purpose.
Article 7
Permits and authorisations
Any type of permits and or authorisations required for the implementation of the measure must be provided by the competent authorities of the Beneficiary in due time and in accordance with national law.
Article 8
Specific conditions related to the measure
Without prejudice to the general provisions specified in Annex III the Community grant for the measure is subject to the following conditions:
1. Condition on the assumptions and the status of the assets:
The Commission reserves the right to revise the amount of the assistance for ISPA set out in Article 3 if, within five years of the date of the completion of works, the operating conditions (tariffs, revenues, etc.) vary significantly relative to the original assumptions made in determining the level of the grant and/or there is a substantial modification:
a) affecting the nature of the operation or its implementing conditions, or giving to a private or public body an undue advantage; and
b) resulting either from a change in the nature of the ownership of any part of the financed infrastructure, or a cessation or material change in the operating arrangements.
The beneficiary country shall inform the Commission of any such change, and shall seek the ex-ante agreement of the Commission to these changes.
2. Condition on viability:
The Community grant for the measure is subject to the authorities concerned making available sufficient resources in order to ensure the effective operation and maintenance of the assets.
3. The first instalment of the advance payment is subject to the awarding of Decentralised Implementation System (DIS) accreditation by the Commission to the ISPA implementing agency identified in Annex I.3.
4. The second instalment of the advance payment is subject to:
(a) an undertaking by Vodovod i Kanalizacija Karlovac to take the corrective measures necessary to mitigate the impact of the project on the environment.
(b) a loan agreement with the EBRD for co-financing investments included in this measure has been signed.
(c) the completion of a full EIA in conformity with the requirements of Directive 85/337/EC as amended by Directive 97/11/EC an Directive 2003/35/EC, including public consultation, and the issuing of an environmental decision by the competent environmental authority.
5. The final payment is subject to:
(b) the Commission receiving evidence that a solution for the safe management of sludge, compliant with applicable EC Directives, has been implemented.
Article 9
The implementation provisions described in the Annexes to this financing memorandum form an integral part of it.
Non-compliance with the conditions and implementation provisions shall be dealt with by the Commission according to the procedure stipulated in Annex III.1. Section VIII.
Article 10
The authentic text of this financing memorandum is the present document as signed hereunder.
Done at Vinkovci,30 January 2006 Done at Brussels,
For the Recipient For the Community
Marija Pejčinović Burić Graham Meadows
National ISPA Coordinator Director General
ANNEX 1
Description of measure
Karlovac Water and Waste Water Programme
Commission code No: 2005 HR 16 P PE 001
|
1. |
MEASURE TITLE |
|
|
Karlovac Water and Waste Water Programme |
||
|
2. |
AUTHORITY MAKING THE APPLICATION |
|
|
|
2.1. Name: |
Ministry of Foreign Affairs and European Integration Mrs Marija Pejčinović Burić – National ISPA Coordinator |
|
|
2.2. Address: |
Petretićev trg 2, 10 000 Zagreb, Croatia |
|
3. |
AUTHORITY RESPONSIBLE FOR IMPLEMENTATION |
|
|
|
3.1 Name: |
Central Finance and Contracting Unit, Ministry of Finance |
|
|
3.2. Address: |
Katančićeva 5, 10 000 Zagreb, Croatia |
|
4. |
FINAL BENEFICIARY |
|
|
|
4.1. Name: |
Vodovod i Kanalizacija Karlovac (The Karlovac Water and Sewage Company) |
|
|
4.2. Address: |
Gažanski trg 8, 47000 Karlovac, Croatia |
|
5. |
LOCATION |
|
|
|
5.1. Beneficiary country: Croatia |
|
|
|
5.2. Region: Karlovacka County |
|
|
6. |
DESCRIPTION |
|
6.1. Background
The town of Karlovac has a population of slightly less than60,000. It is situated at the confluence of the Korana, Mrežnica and the Kupa rivers. The River Kupa flows into the River Sava, which in turn discharges into the Danube.
The town is provided with a combined wastewater collection system, large parts of which were originally constructed in the 1930s. Approximately 75% of the city’s urban population is connected to the mains sewerage system. The system comprises 93 km of sewers. Sections of the existing network need to be replaced or repaired and the network needs to be extended in order to provide greater cover for the town’s inhabitants.
Currently the wastewater which is collected is discharged untreated through 6 main outfalls in the town. Two discharges are into the River Mreznica. This then impacts on water quality in the River Korana which also flows through the town and which contains a designated bathing water site. The other four discharges are into the River Kupa which runs through the centre of the town. The 6 outfalls need to be intercepted and the sewage flow diverted in order to be suitably treated prior to it being discharged into the River Kupa downstream of the town.
There is no WWTP plant in Karlovac, other than a small package treatment plant serving the suburb of Turanj to the South of the Town, and so a new WWTP is envisaged within the project to provide preliminary, primary, secondary and tertiary treatment thereby ensuring that all the sewage collected in the town is treated according to European Community and Croatian standards. The combined result of the actions will be the prevention of further pollution of the local rivers and raising their level of cleanliness to European norms.
The Karlovac project has been identified by the Danube and Black Sea Task Force (DABLAS) as a priority project due to the inclusion of the town of Karlovac on the Danube basin emission inventory. The inclusion on the inventory indicates that the discharge from the town has a regional, as well as national significance. In addition, due to it fulfilling the established priority investment criteria, the project is listed in the Croatian National ISPA Strategy for the Environment Sector as a priority project contributing to the improvement of water quality in the tributaries of the Sava River.
The water and sewerage systems in the city are managed by Vodovod i Kanalizacija Karlovac (ViK Karlovac) – the Karlovac Water and Sewage Company – which is a company 100% owned by the municipality of Karlovac. In addition ViK Karlovac has signed a loan agreement with the European Bank for Reconstruction and Development in order to joint finance the project.
Aside from wastewater services ViK Karlovac is also responsible for the provision of water supply services for the town of Karlovac and to 46 smaller settlements within the county of Karlovac. The connection rate within the town is close to 100%, but there are some nearby villages without adequate piped water supplies. The few households that are not served by ViK Karlovac operate their own shallow wells.
Monitoring of the current system for water supply in the City does not show any significant risk to human health associated with the drinking water supply. However, the condition of many elements of the system is such that there is an increasing risk of non-compliance with the parametric limits set out in the Drinking Water Directive, particularly as a result of breakages in older elements of the network. There are high levels of water losses, and there is a significant risk of drinking water wells being contaminated by river water at times of high flow or flood and from ingress of polluted water into damaged distribution pipes.
The water for the town is abstracted from 6 shallow well complexes within the town, where water is disinfected by chlorination. In addition to pumping stations at the well heads, there are another eight pumping stations delivering to eight storage reservoirs and a distribution system of approximately 482 km of pipes with diameters of up to 500 mm. The oldest pipes date back to 1914.
Approximately 25,000 m3 per day (9 million m3 per annum) of water is delivered to some 29,000 premises by ViK Karlovac, with unaccounted water representing about 43% of the water abstracted.
As a result of the water and wastewater problems described above the town of Karlovac currently fails to comply with the following EU Directives:
• Drinking Water Directive (98/83/EC)
• Bathing Waters Directive (76/160/EEC)
• Urban Wastewater Treatment Directive (91/271/EEC)
• Water Framework Directive (2000/60/EC)
The objective of this measure is to eliminate the water and wastewater problems in the town of Karlovac thereby ensuring a greater degree of compliance with the mentioned Directives through the most cost-effective and sustainable means.
6.2. Components of the Project
The project consists of five groups of investment items, which are divided into 3 categories:
Water Supply
A. Water Supply System
Waste Water Treatment
B. Main Collector Sewers and Pump Stations
C. Secondary and Tertiary Sewers
D. New Wastewater Treatment Plant
Technical Assistance and Supervision
E. Technical Assistance, Supervision during Implementation and Publicity
A. Water Supply System
The water supply investments will help to minimise the risk to drinking water quality and reliability of service being compromised, through the refurbishment of key elements of the system and through the introduction of network management systems which will help to ensure safe operation of the supply system. In particular the improvements will help to minimise the level of system breakage and leakage. This will in turn minimise the potential for ingress into the system of contamination. System management tools will help to improve leak detection and prompt remediation. The main items to be carried out within this scope of work are:
1) Water Source Works
There is no immediate requirement for the development of any water recourses for the town of Karlovac. Refurbishment and cleaning of the existing (but unused) water abstraction wells at Mekušje and at Borlin will ensure that there is adequate supply for the town in the short term for immediate use in periods of water shortages due to seasonal low flows in the river or due to emergencies. In addition the reliable yields of the existing well systems are not known. Therefore hydro-geological investigations are required to determine the reliable yields of the existing well systems. These investigations should be followed by the refinement of the water resources management strategy for the service area. Such a strategy may include the development of new resources in addition to the cleaning of the existing ones, but until adequate information is available, this cannot be properly determined.
2) Network modelling
This task will include computer, specialist software and specialist support. This will enable the creation and calibration of a computerised model of the water distribution systems. This model will be used to improve the detailed management of the system.
3) Metering of the distribution network
Water meters are already installed at the well systems and at pumping stations within the water distribution network However, at present there is no district metering programme which will provide vital information both for leak detection and for the general management of the system. A district metering system, consisting of water meters monitoring flows into and out of specific districts, will be installed so that areas with already high or increasing flows can be quickly identified and the necessary leak detection and repairs carried out. This will assist in the reduction of unaccounted for water.
4) Leak detection programme
This will include the provision of two loggers, a noise leak correlator, a vehicle and suitable specialist training. Initially, the programme will concentrate on the detection of leaks in an area to be selected based on historical data on the numbers of leaks identified and the condition of the pipes at the repair locations. During this initial programme, ViK Karlovac staff will be trained in the operation of the leak detection equipment.
5) Water distribution pipe replacement
There are 135 km of old asbestos cement pipes that are in poor condition and are in need of replacement or refurbishment. The project will replace 10.5 km of the pipes which are in the worst condition as the start of a programme for their gradual total replacement.
6) Refurbishment of reservoirs
This will entail the refurbishment of the Borlin reservoir, as well as the refurbishment and repair of the other existing reservoirs. This system will help to ensure that appropriate levels and pressures are maintained in the system.
B. Main Collector Sewers and Pump Stations
These investment elements will refurbish and complete the main elements of the wastewater collection network as required by the UWWT Directive. Moreover this network will divert wastewater flows from the receiving waters in the vicinity of both the town’s water abstraction points and a designated bathing water site, to the location of the new wastewater treatment plant, downstream of the town. The main items to be carried out within this scope of work are:
1) Construction of the Banija Interceptor Sewer and Syphon
This sewer will collect wastewater from the Banija and Drežnik areas of the town and transfer it to the main sewer network via a siphon passing under the Kupa river. This will eradicate the three discharges of untreated wastewater into the River Kupa from the North bank.
2) Construction of the Svarca Interceptor Sewer
This will comprise of the construction of interceptor sewers in the Svarca and Mostanje regions of the town together with associated pumping stations. These interceptors will collect wastewater from these areas (on the South side of the Town) and transfer them to the South Collector and then to the wastewater treatment plant. This will eradicate the current discharge of untreated wastewater into the River Mrežnica from the North bank.
3) Construction of the Grad Collector Sewer and Lift Station
This new main sewer, known as the Grad Collector Sewer, will be constructed to intercept the flows to the existing Grad outfall in the 3m diameter Grad Main Sewer at the edge of the Zvijezda area of the town. The collector will then direct the wastewater to the WWTP via a syphon beneath the River Korana. This sewer will eradicate the main discharge into the River Kupa from the South Bank.
4) Construction of the Grad Stormwater Outfall
Stormwater flows greater than 2 × DWF will be discharged directly to the River Kupa through a new storm water outfall sewer. The separation of the wastewater from the storm water will reduce the amount of sewage requiring treatment as the existing sewerage system is largely a combined one.
5) Construction of the Grad Stormwater Pumping Station
A stormwater pumping station is needed to pump the stormwater into the river Kupa at times of high water level (on the infrequent occasions when large storm water flows in the sewerage systems coincide with high water levels in the River Kupa). The new pumping station will replace the existing Sanac Pumping Station and Grad Outfall Sewer both of which are more than seventy years old.
6) Construction of the PPK Inceptor Sewer
The wastewater effluent from the PPK meat factory will be collected by this new sewer and will in turn connect into the proposed Banija Interceptor Sewer. The construction of this sewer will eradicate discharges from the PPK meat factory which currently go untreated into the River Kupa.
7) Replacement of damaged sewers in the Central Urban Area
Many of the sewers in Karlovac were built over 50 years ago and some are more than 70 years old. Many of these sewers were built with poor quality materials and they have deteriorated over time. During periods of high groundwater levels, water from the surrounding soil gains access to the sewers through badly constructed joints and the poor quality pipe materials. This contributes to the relatively high levels of infiltration that are known to be present in some parts of the sewerage system. Approximately 1.3 km of the most seriously damaged sewers are to be replaced within this measure.
C. Secondary and Tertiary Sewers
The installation of these elements will further contribute to the completion of the wastewater collection network for the agglomeration of Karlovac. The combination of this investment and the main collector system investments will ensure that wastewater from premises within the city is safely and reliably collected and transferred to the new wastewater treatment plant. The main items to be carried out within this scope of work are:
1) Construction of sewerage systems in the areas of Mala Svarca and Logoriste, These areas are located close to the South Collector sewer and their connection to it is a cost-effective solution to the provision of wastewater collection in these areas.
2) Construction of sewerage systems in the area of Eastern Svarca. This area is located close to the South Collector sewer and connection to it is a cost-effective solution to the provision of wastewater collection in this area.
D. New Wastewater Treatment Plant
This item will entail the construction of a completely new 100,000 p.e., 26,000 m3/d (approx. 300 l/sec) design dry weather flow capacity wastewater treatment plant to provide full treatment to all the wastewater collected within the town of Karlovac. To fully comply with the effluent requirement standards for a Category II river in a «sensitive» area, the treatment processes will include nutrient reduction facilities.
This item will comprise 6 elements:
1) Inlet Pumping Station, Inlet Works, Offices, Workshops & Laboratory
The construction of an inlet works for preliminary treatment of the wastewater using screening, grit removal, and fat & grease removal. The laboratory will provide for the monitoring of both the inflow and outflow characteristics of the wastewater and associated environmental monitoring.
2) Primary Sedimentation & Sludge Treatment facilities
The sedimentation tanks will provide primary treatment for the inflow. Sludge treatment will be in the form of thickening, anaerobic digestion, and mechanical dewatering.
3) Secondary and tertiary sewage treatment facilities
A biological treatment stage using activated sludge will be employed. This will incorporate tertiary treatment using de-nitrification and phosphorous precipitation.
4) Effluent pumping station
The effluent pumping station will pump the treated final effluent to the river during high water level periods.
5) Embankments & fencing
These elements are to prevent flooding of the WWTP and to ensure security of the facilities;
6) Access road;
E. Technical Assistance, Supervision during Implementation and Publicity
These items will contribute to an increase in the overall efficiency of operation of the water and wastewater management systems within ViK Karlovac. In addition the technical support will assist in the implementation of the project and also the preparation of a long term investment strategy for ViK Karlovac. The items consist of the following elements:
1) Technical Assistance for improving operational efficiency
This task consists of the following elements designed to improve the asset management knowledge of the Beneficiary. It comprises of:
• Provision of advice and training to the PIU (Project Implementation Unit) in the use of mapping, Flow Measurement techniques, GIS database and network hydraulic modelling software, in order to undertake a comprehensive inventory of the condition of the water supply and sewerage networks.
• Devising an infiltration reduction strategy to identify short and long term projects to further reduce infiltration and leakage and consequent operational costs.
2) Supply of operational and maintenance equipment
This task consists of the supply of 2 modern vacuum and jetting tankers and 1 small jetting tanker for the collection of sewage and sewerage system maintenance. They will replace the existing obsolete tankers owned by ViK Karlovac.
3) Preparation of phase II investments
A consultant will review and revise the existing long term investment plan for water and wastewater services in Karlovac taking into account changes in the baseline situation and the results of the investigations and studies described above.
4) Support for the PIU
This assistance will help to ensure the effective implementation of the measure. The Project Implementation Consultants (PIC) will assist the PIU as required in the design, procurement and contract administration processes. The consultants will be expected to prepare detailed designs and tender documents for the proposed works and other contracts, and to assist in the preparation of all the necessary documentation such as public notifications, pre-qualifications where appropriate, invitations to tender, answering tender questions, functional guarantees, detailed specifications, evaluation criteria etc. The consultants will also provide tender evaluators and specialist assistance and training required for the wastewater and water surveys and future investment strategies.
Furthermore, the consultants will provide advice and training in the following areas:
• Capacity building (capacity of the Project Implementation Unit in the preparation, implementation and monitoring of internationally funded projects), including an agreed training needs analysis and the provision of an on-the-job training programme.
• Ensuring the continuous upgrading of an action plan for the monitoring of industrial wastewater and the enforcement of pre-treatment or treatment compliance, including advice and training in this field for the PIU. The action plan has clearly to outline the future strategy regarding the choice between connection of industrial waste water to the municipal WWTP (and the development of separate tariffs, which reflect the true costs of treatment) or the installation of a proper purely industrial treatment process, which will also need clear enforcement requirements.
• Elaboration of a strategy for the safe management of sludge in compliance with local legislation and EC Directives and advice and training of the PIU on this.
• Support to the PIU in preparing project progress reports and performance indicator monitoring information.
5) Supervision of the construction works
This assistance is required in order to effectively supervise the various works contracts that are contained in the measure in accordance with FIDIC Conditions of Contract.
6) Publicity for the project
This will cover both publicity of the EU contribution to the ISPA measure and also an awareness campaign with regard to the improvements in the quality of services following the investments. This will be important to support the acceptance by the population of the necessary tariff increases.
7. OBJECTIVES
The main objectives of the measures are:
1. To ensure the provision of safe drinking water in accordance with the requirements of European Community and Croatian legislation.
2. To protect the water environment in the Karlovac region and in so doing to achieve improved compliance with European Community and Croatian legislation in respect of the water environment.
The project’s specific objectives are:
1. Protect existing drinking water sources from potential contamination by surface water during high water conditions,
2. Prevent contamination of the water distribution network and thereby safeguard drinking water quality,
3. Improve the water supply system operational efficiency and reliability,
4. Improve the water quality of surface waters within the town of Karlovac, by reducing pollution load by over 3,000 kg BOD/d,
5. Raise the Kupa river water quality downstream of the town from Class III to II or better,
6. Reduce ground water pollution through infiltration from sewers,
7. Improve the operational reliability and efficiency of the wastewater network.
7.1 Physical Indicators
The indicative key indicators, as illustrated in the following tables, will be used to monitor the physical progress of the construction of the project. A final list of physical indicators will be established for monitoring purposes once the design of the various components has been finalised.
The proposed indicative performance indicators are the following:
|
Performance Indicators |
Before ISPA |
After ISPA |
|
Drinking Water |
|
|
|
Unaccounted for water |
43% |
35% |
|
Drinking Water Quality Degradation in Distribution |
7% |
5% |
|
Performance Indicators |
Before ISPA |
After ISPA |
|
Wastewater treatment and collection |
|
|
|
Resident population connected to the sewerage system/total resident population |
75% |
95% & 100%* |
|
Average wastewater volume collected and treated/day |
0 |
20,800 m3/d |
|
Water quality classification of the Kupa river immediately downstream of Karlovac |
Class III |
Class II |
|
Infiltration to the sewerage system |
2000 m3/d |
1,500 m3/d |
|
Compliance with discharge standards of UWWTD |
0% |
100% |
*Town of Karlovac – 95%, suburb of Duga Resa – 100%
For the outflow of the WWTP, the following reductions are envisaged:
|
Agent |
Present situation mg/l |
After ISPA |
% |
|
BOD (Biological Oxygen Demand) |
231 |
22 |
90 |
|
COD (Chemical Oxygen Demand) |
512 |
121.5 |
75 |
|
SS (Suspended Solids) |
272 |
25.8 |
90 |
|
Nitrogen |
40 |
9.5 |
75 |
|
Phosphorous |
9 |
1.6 |
80 |
8. INDICATIVE WORK SCHEDULE
|
|
Category of work |
Tendering |
Award |
Completion |
|
1 |
Supervision of construction works |
July 2006 |
January 2007 |
December 2010 |
|
2 |
Technical support equipment including leak detection equipment, a vehicle, network modelling equipment and software, together with training |
July 2006 |
January 2007 |
December 2009 |
|
3 |
Sewer Maintenance Equipment |
October 2007 |
January 2008 |
December 2009 |
|
4 |
Construction and refurbishment of wastewater collectors, pumping stations and water pipes |
November 2006 |
February 2007 |
December 2009 |
|
5 |
Construction of WWTP |
November 2006 |
February 2007 |
July 2010 |
|
6 |
Technical Assistance (PIC) |
February 2006 |
August 2006 |
June 2010 |
9. ECONOMIC AND SOCIAL COST-BENEFIT ANALYSIS
The measure carries a number of important economic, social and environmental benefits. For the combined water and wastewater components, the cost benefit analysis results in a positive benefit/cost ratio.
10. MAIN ELEMENTS OF FINANCIAL ANALYSIS
A financial analysis of the project has been carried out to ensure its financial viability and affordability. The following assumptions underlie the financial analysis:
– the proposed investment programme of € 36,5 million, out of which a total of € 36 million in eligible expenses, will be financed by a 62.5% ISPA grant, 9.7% national sources and 27.8% EBRD loan;
– the actual water/ wastewater tariff in 2005 is € 0.82/m3 (incl. 22% VAT) for domestic consumers and €1.89/m3 for non-domestic consumers (incl. 22|% VAT);
– the water consumption: 132 l/d/c in 2004;
– with the average monthly household income of €375 in 2004 the affordability ratio does not go above 2.05% during the whole project life;
– The NPV for the project is €1.17 mln. using ISPA assistance;
– The FIRR is 5.3% for the project using ISPA assistance;
– The Benefit/Cost ratio is 1.03.
10.1. Polluter Pays Principle
Existing tariffs are applied on a per unit consumption basis, with all consumption being metered. The volume of water consumed is used to calculate charges for wastewater services. Since, wastewater discharges are currently not treated – the charging mechanism for water supply and wastewater services does not distinguish between degrees of pollution discharged by the current charging system.
The Republic of Croatia is committed to the application of the polluter pays principle and the charging system applied by ViK Karlovac will be adapted to meet this needs. The application of a full cost recovery tariff necessitates significant changes (increases) in tariff levels to be made. The needs of the polluter pays principle will form part of the change process, for which the development of an implementation strategy is under preparation.
The Polluter Pays Principle is already applied in Croatia to a great extent as set out in the relevant national legislation and in the National ISPA Strategy for the Environment.
10.2. Tariffs
Charges for water supply and wastewater services are set to recover operating costs, provisions for depreciation and partial capitol costs. Owing to differences in projected sales volumes and budgeted operating costs, ViK realises a small operating loss. The operating margin in the year 2004 was –3%. Future tariff polices envisage the continuation of this policy, with tariff levels gradually being increased to recover:
• Additional depreciation charges from the proposed capital investment,
• the operating costs of providing wastewater treatment services,
• debt servicing obligations arising from the proposed capital investments,
• financial returns enabling future capital investment needs to be financed from user charges.
Different tariff levels are currently applied for domestic and non domestic (industry, commercial and public enterprises. It is intended that equalisation of tariffs will be implemented over the next 10 years, except where different tariffs reflecting treatment costs can be justified. This policy forms part of the Loan Agreement between ViK and the EBRD and the Guarantee Agreement from the City of Karlovac. This will likely result in larger increases in household tariffs than would otherwise have been required if the differential were maintained. It is expected that these increases would be at least 20-30% above other required tariff increases for domestic customers.
To ensure financial sustainability the following increases in average tariff levels for water supply and wastewater services are required for the years 2007-2009:
• 2007: 12% in real terms;
• 2008: 11% in real terms;
• 2009: 15% in real terms.