ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT »HRVATSKA: USUSRET ODRŽIVOM, PRAVEDNOM I UČINKOVITOM OBRAZOVANJU«
Proglašavam Zakon o potvrđivanju Ugovora o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt »Hrvatska: ususret održivom, pravednom i učinkovitom obrazovanju«, koji je Hrvatski sabor donio na sjednici 11. ožujka 2022.
Klasa: 011-02/22-02/23
Urbroj: 71-10-01/1-22-2
Zagreb, 11. ožujka 2022.
Predsjednik
Republike Hrvatske
Zoran Milanović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT »HRVATSKA: USUSRET ODRŽIVOM, PRAVEDNOM I UČINKOVITOM OBRAZOVANJU«
Članak 1.
Potvrđuje se Ugovor o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt »Hrvatska: ususret održivom, pravednom i učinkovitom obrazovanju«, potpisan u Zagrebu 16. prosinca 2021. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
LOAN NUMBER 9303-HR
LOAN AGREEMENT
AGREEMENT dated as of the Signature Date between REPUBLIC OF CROATIA («Borrower») and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank»). The Borrower and the Bank hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
1.01. The General Conditions (as defined in the Appendix to this Agreement) apply to and form part of this Agreement.
1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement.
Article II
LOAN
2.01. The Bank agrees to lend to the Borrower the amount of twenty-five million Euros (€25,000,000), as such amount may be converted from time to time through a Currency Conversion («Loan»), to assist in financing the project described in Schedule 1 to this Agreement («Project»).
2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section III of Schedule 2 to this Agreement.
2.03. The Front-end Fee is one quarter of one percent (0.25%) of the Loan amount.
2.04. The Commitment Charge is one quarter of one percent (0.25%) per annum on the Unwithdrawn Loan Balance.
2.05. The interest rate is the Reference Rate plus the Variable Spread or such rate as may apply following a Conversion; subject to Section 3.02(e) of the General Conditions.
2.06. The Payment Dates are May 15 and November 15 in each year.
2.07. The principal amount of the Loan shall be repaid in accordance with Schedule 3 to this Agreement.
Article III
PROJECT
3.01. The Borrower declares its commitment to the objectives of the Project. To this end, the Borrower shall carry out the Project through the MSE in accordance with the provisions of Article V of the General Conditions and Schedule 2 to this Agreement.
Article IV
EFFECTIVENESS; TERMINATION
4.01. The Additional Conditions of Effectiveness consists of the following: namely that the Borrower has: (i) developed and adopted a POM, satisfactory to the Bank, and (ii) established the Working Group in a manner satisfactory to the Bank.
4.02. The Effectiveness Deadline is the date ninety (90) days after the Signature Date.
4.03. For purposes of Section 9.05(b) of the General Conditions, the date on which the obligations of the Borrower under this Agreement (other than those providing for payment obligations) shall terminate is twenty (20) years after the Signature Date.
Article V
REPRESENTATIVE; ADDRESSES
5.01. The Borrower’s Representative is the minister in charge of finance.
5.02. For purposes of Section 10.01 of the General Conditions: (a) the Borrower’s address is:
Ministry of Finance
Katanciceva 5
10000 Zagreb
Republic of Croatia
Facsimile: (385-1) 4922-598; and
(b) the Borrower’s Electronic Address is:
kabinet@mfin.hr
5.03. For purposes of Section 10.01 of the General Conditions: (a) the Bank’s address is:
International Bank for Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America;
Facsimile: 1-202-477-6391; and
(b) the Bank’s Electronic Address is:
gvincelette@worldbank.org
AGREED as of the Signature Date.
REPUBLIC OF CROATIA
Authorized Representative
Name: Zdravko Marić
Title: Deputy Prime Minister and Minister of Finance
Date: December 16, 2021
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
Authorized Representative
Name: Jehan Arulpragasam
Title: Country Manager
Date: December 16, 2021
SCHEDULE 1
PROJECT DESCRIPTION
The objective of the Project is to improve the learning environment in selected schools under the WDS system and to strengthen the capacity of the MSE to scale up the WDS system and implement sector reforms.
The Project consists of the following parts:
Part 1: Ensure that more hours translate into more student learning
1. Technical assistance to MSE to design and support implementation and monitoring of the WDS system while learning from its rollout to inform the MSE’s future scale up of the reform, including through:
(a) The development of the WDS system and its adjustment following experience during the initial years of implementation by, inter alia, (i) developing guidelines to increase learning time for all students and incorporate additional extracurricular activities; (ii) defining pedagogical practices consistent with the new curriculum; (iii) designing training models for teachers; and (iv) contracting professors and experts from higher education institutions as learning counselors to train teachers in WDS implementation.
(b) The design and development of an advanced education database, utilizing administrative and student performance data by education sector stakeholders.
(c) (i) Design and establishment of a «peer-mentoring» program that would pair principals from Demonstration Schools with poor academic performance and located in high poverty areas, with principals from top-performing schools; and
(ii) provision of Small Grants to eligible Demonstration Schools participating in the «peer-mentoring» program, as set forth under the Small Grants Manual, to procure, inter alia, learning materials, minor information technology equipment for classrooms, and to build the capacity of teachers.
Part 2: Design and demonstrate infrastructure solutions for WDS
1. Technical assistance to MSE to transition schools into modern, climate-resilient and energy-efficient facilities by, inter alia: (i) adopting school infrastructure designs and standards following relevant international and European practices; (ii) developing guidelines to support national and subnational authorities in procurement, permits, and supervision; (iii) gathering data on existing infrastructure to inform prioritization of capital investments; (iv) carrying out preliminary analytical studies such as technical surveys and energy audits; and (v) developing learning and knowledge exchange mechanisms to exchange best practices and foster peer-to-peer learning around novel ways of using learning spaces.
2. Selecting, through a public call, the schools pioneering the implementation of the WDS system and serving as demonstration schools for the reform («Demonstration Schools») and implementing minor infrastructure investments in the Demonstration Schools, such as minor rehabilitation and refurbishment work, and procuring necessary school furniture and equipment for Demonstration Schools to facilitate their participation in the WDS.
Part 3: Strengthen MSE’s capacity to implement reforms
1. Provision of support for the implementation of the WDS system, including by: (i) strengthening MSE’s capacity to support key aspects of implementing the reform, including the establishment of the Reform Working Group; and (ii) support to the Reform Working Group in the overall day-to-day implementation of the Project, including procurement, financial management, monitoring and evaluation, carrying out of audits, communication and outreach strategy on the WDS, safeguards and implementation of grievance redress mechanisms.
2. Technical assistance, training and capacity-building to support MSE in the design, implementation and scale up of the WDS system, by inter alia (i) reviewing national regulations governing teachers, students with special needs, school autonomy, and organization of school day; (ii) reviewing the framework for human resources in the school sector; (iii) revising the WDS reform costing to ensure consistency with education policy reforms; (iv) conducting a needs assessment and training on school management; and (v) supporting local governments to adapt their local school network and promote their participation in the WDS system.
3. Technical assistance to support the MSE with the design of educational reforms beyond the WDS set forth under the NRRP, that seek to inter alia, (i) restructure the early childhood development financing model and enhance capacities of preschool teachers; (ii) optimize and adapt the vocational education school network to align with the needs of the economy and increase participation in general education programs; and (iii) restructure the higher education financing model and enhance the digital competencies of professors.
4. Support the establishment of a research program to monitor and analyze the impact of the WDS reform, including by conducting an impact evaluation of outcomes in Demonstration Schools vis-à-vis a statistically valid group of «control schools», as set forth in the POM, to (i) compare differences in average student learning outcomes and learning outcomes among disadvantaged students; (ii) inform future reform activities in a timely and evidence-based manner; and (iii) leverage the expertise of other national educational institutions for the benefit of students and teachers.
SCHEDULE 2
PROJECT EXECUTION
Section I.
IMPLEMENTATION ARRANGEMENTS
A. Institutional Arrangements
1. Without limitation to the provisions of Article V of the General Conditions, and except as the Bank shall otherwise agree, the Borrower shall maintain at all times during the implementation of the Project, a Working Group, withing MSE, with composition, resources, terms of reference and functions acceptable to the Bank, including, inter alia, an environmental specialist, social development specialist and communication specialist.
2. The Borrower shall ensure that the Reform Working Group is headed by a Project director and is responsible for the day-to-day implementation of the Project, including financial management, disbursement, procurement, monitoring and evaluation, consolidated reporting, and ensuring safeguards compliance under the Project, as further elaborated in the Project Operations Manual («POM»).
B. Project Operations Manual
1. The Borrower, through MSE, shall carry out the Project in accordance with the POM, satisfactory to the Bank.
2. The Borrower shall ensure that the POM includes the rules, methods, guidelines, standard documents and procedures for the carrying out of the Project, including: (a) a detailed description of the Project activities and the institutional arrangements of the Project; (b) a detailed description of prioritization and eligibility criteria for the Project activities; (c) the Project accounting, auditing, reporting, financial, procurement and disbursement procedures; (d) the monitoring indicators for the Project; and (e) the detailed Project costs and financing.
3. (a) The POM may not be assigned, amended, abrogated or waived, or permitted to be assigned, amended, abrogated or waived, or any provision thereof, in a manner which, in the opinion of the Bank, may materially and adversely affect the implementation of the Project.
(b) The POM may only be amended in consultation with, and after approval of, the Bank.
(c) In case of any conflict between the terms of the POM and those of this Agreement, the terms of this Agreement shall prevail.
C. Annual Work Plan and Budget
The Borrower, through the Reform Working Group, shall:
(a) unless otherwise agreed with the Bank, prepare and furnish to the Bank, not later than November 15 of each year during the implementation of the Project starting in 2022, a proposed Annual Work Plan and Budget for the next calendar year containing: (i) all activities to be carried out under the Project during that calendar year; and (ii) a proposed financing plan for expenditures required for such activities, setting forth the proposed amounts and sources of financing; and
(b) provide the Bank a reasonable opportunity to exchange views with the Borrower on each such proposed Annual Work Plan and Budget, and shall thereafter ensure that the Project is implemented with due diligence during said following year, in accordance with such Annual Work Plan and Budget as shall have been approved by the Bank; and not make or allow to be made any change to the approved Annual Work Plan and Budget without the Bank’s prior written approval.
D. Small Grants
1. To facilitate the carrying out of Part 1(1)(c) of the Project, the Borrower, through MSE, shall make part of the proceeds of the Loan available to Demonstration Schools under a grant agreement between the Borrower and the respective Demonstration School («Grant Agreement») for purposes of a Small Grant Sub-project, under terms and conditions approved by the Bank, which shall include the following:
(a) MSE shall make Small Grants to Demonstration Schools in accordance with eligibility criteria and procedures acceptable to the Bank, which shall be detailed in the Small Grants Manual.
(b) MSE shall make each Small Grant under a Grant Agreement with the respective Demonstration School on terms and conditions approved by the Bank, which shall include the following:
(i) MSE shall obtain rights adequate to protect its interests and those of the Bank, including the right to:
(1) suspend or terminate the right of the Demonstration School to use the proceeds of the Small Grant, or obtain a refund of all or any part of the amount of the Small Grant then withdrawn, upon the Demonstration School’s failure to perform any of its obligations under the Grant Agreement; and
(2) require each Demonstration School to:
(A) carry out its Small Grant Sub-project with due diligence and efficiency and in accordance with sound technical, economic, financial, managerial, environmental and social standards and practices satisfactory to the Bank, including in accordance with the provisions of the Anti-Corruption Guidelines applicable to recipients of loan proceeds other than the Borrower;
(B) provide, promptly as needed, the resources required for the purpose;