HRVATSKI SABOR
54
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O JAMSTVU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT POMOĆI PODUZEĆIMA U OSIGURAVANJU LIKVIDNOSTI U HRVATSKOJ
Proglašavam Zakon o potvrđivanju Ugovora o jamstvu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt pomoći poduzećima u osiguravanju likvidnosti u Hrvatskoj, koji je Hrvatski sabor donio na sjednici 1. listopada 2021.
Klasa: 011-01/21-01/65
Urbroj: 71-10-01/1-21-2
Zagreb, 6. listopada 2021.
Predsjednik
Republike Hrvatske
Zoran Milanović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O JAMSTVU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT POMOĆI PODUZEĆIMA U OSIGURAVANJU LIKVIDNOSTI U HRVATSKOJ
Članak 1.
Potvrđuje se Ugovor o jamstvu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt pomoći poduzećima u osiguravanju likvidnosti u Hrvatskoj, potpisan u Zagrebu 7. lipnja 2021. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora o jamstvu iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
LOAN NUMBER 9233-HR
GUARANTEE AGREEMENT
AGREEMENT entered into between REPUBLIC OF CROATIA («Guarantor») and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank») («Guarantee Agreement») in connection with the Loan Agreement of the Signature Date between the Bank and CROATIAN BANK FOR RECONSTRUCTION AND DEVELOPMENT («Borrower»), concerning Loan No. 9233-HR («Loan Agreement»). The Guarantor and the Bank hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
Section 1.01. The General Conditions (as defined in the Appendix to the Loan Agreement) apply to and form part of this Agreement.
Section 1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Loan Agreement.
Article II
GUARANTEE; PROVISION OF FUNDS
Section 2.01. The Guarantor declares its commitment to the objectives of the Project. To this end, without limitation or restriction upon any of its other obligations under the Guarantee Agreement, the Guarantor hereby unconditionally guarantees, as primary obligor and not as surety merely, the due and punctual payment of all Loan Payments payable by the Borrower pursuant to the Loan Agreement, and the punctual performance of all the other obligations of the Borrower set forth or referred to in the Loan Agreement.
Section 2.02. Without limitation or restriction upon the provisions of Section 2.01 of this Agreement, the Guarantor specifically undertakes, whenever there is reasonable cause to believe that the funds available to the Borrower will be inadequate to meet the estimated expenditures required for the carrying out of the Project, promptly to provide the Borrower with the funds needed to meet such expenditures.
Article III
REPRESENTATIVE; ADDRESSES
Section 3.01. The Guarantor’s Representative is Minister of Finance.
Section 3.02. For purposes of Section 10.01 of the General Conditions the Guarantor’s address is:
Ministry of Finance
Katančićeva 5
10000 Zagreb
Republic of Croatia; and
(b) the Guarantor’s Electronic Address is:
Facsimile: (385-1) 4922-598
Section 3.03. For purposes of Section 10.01 of the General Conditions: (a) the Bank’s Address is:
International Bank for Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America; and
(b) the Bank’s Electronic Address is:
Facsimile: (1-202) 477-6391, Email: gvincelette@worldbank.org
AGREED as of the later of the two dates written below.
REPUBLIC OF CROATIA
By
Zdravko Marić
Deputy Prime Minister
and Minister of Finance
June 7, 2021
INTERNATIONAL BANK FOR RECONSTRUCTION AND
DEVELOPMENT
Elisabetta Capannelli
Country Manager
June 7, 2021
ZAJAM BROJ 9233-HR
UGOVOR O JAMSTVU
UGOVOR između REPUBLIKE HRVATSKE (»Jamac«) i MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ (»Banka«) (»Ugovor o jamstvu«) u vezi s Ugovorom o zajmu od datuma potpisivanja između Banke i HRVATSKE BANKE ZA OBNOVU I RAZVITAK (»Zajmoprimac«) vezano uz Zajam broj 9233-HR (»Ugovor o zajmu«). Jamac i Banka su se ovime sporazumjele kako slijedi:
Članak I.
OPĆI UVJETI; DEFINICIJE
Odjeljak 1.01. Opći uvjeti (kako su određeni u Dodatku Ugovora o zajmu) primjenjuju se na i čine dio ovoga Ugovora.
Odjeljak 1.02. Ako kontekst ne nalaže drukčije, izrazi napisani velikim početnim slovima koji se upotrebljavaju u ovom Ugovoru imaju značenja koja su im pripisana u Općim uvjetima ili u Ugovoru o zajmu.
Članak II.
JAMSTVO; OSIGURAVANJE SREDSTAVA
Odjeljak 2.01. Jamac izražava svoju opredijeljenost za ciljeve Projekta. U tu svrhu, ne ograničavajući ni na koji način bilo koju svoju drugu obvezu iz Ugovora o jamstvu, Jamac bezuvjetno jamči, kao dužnik, a ne samo kao jamac, pravodobno i točno plaćanje svih otplata Zajma koje je Zajmoprimac dužan plaćati u skladu s Ugovorom o zajmu, kao i točno izvršavanje svih drugih obveza Zajmoprimca navedenih u Ugovoru o zajmu.
Odjeljak 2.02. Ne ograničavajući ni na koji način odredbe Odjeljka 2.01. ovoga Ugovora, Jamac se posebno obvezuje da će, kad god bude imao razloga vjerovati da sredstva kojima raspolaže Zajmoprimac neće biti dostatna za podmirenje procijenjenih izdataka potrebnih za izvršenje Projekta, Zajmoprimcu promptno osigurati sredstva potrebna za podmirenje tih izdataka.
Članak III.
PREDSTAVNIK; ADRESE
Odjeljak 3.01. Predstavnik Jamca je ministar financija.
Odjeljak 3.02. Za potrebe odjeljka 10.01 Općih uvjeta: adresa Jamca je:
Ministarstvo financija
Katančićeva 5
10000 Zagreb
Republika Hrvatska; i
(b) Elektronička adresa Jamca je:
Telefaks: (385-1) 4922-598
Odjeljak 3.03. Za potrebe odjeljka 10.01 Općih uvjeta: (a) adresa Banke je:
International Bank for
Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America,; i
(b) Elektronička adresa Banke je:
Telefaks: (1-202) 477-6391, e-adresa: gvincelette@worldbank.org
DOGOVORENO na kasniji od dvaju datuma niže navedenih.
REPUBLIKA HRVATSKA
Zdravko Marić, v. r.
Potpredsjednik Vlade
i ministar financija
7. lipnja 2021.
MEĐUNARODNA BANKA ZA OBNOVU I RAZVOJ
Elisabetta Capannelli, v. r.
Voditeljica Ureda
Svjetske banke
7. lipnja 2021.
Članak 3.
Tekst Ugovora o zajmu između Hrvatske banke za obnovu i razvitak i Međunarodne banke za obnovu i razvoj za Projekt pomoći poduzećima u osiguravanju likvidnosti u Hrvatskoj, potpisan u Zagrebu 7. lipnja 2021., u izvorniku na engleskom jeziku i prijevodu na hrvatski jezik, glasi:
LOAN AGREEMENT
AGREEMENT dated as of the Signature Date between CROATIAN BANK FOR RECONSTRUCTION AND DEVELOPMENT («Borrower») and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank»). The Borrower and the Bank hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
1.01. The General Conditions (as defined in the Appendix to this Agreement) apply to and form part of this Agreement.
1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement.
Article II
LOAN
2.01. The Bank agrees to lend to the Borrower the amount of two hundred million Euro (€200,000,000), as such amount may be converted from time to time through a Currency Conversion («Loan»), to assist in financing the project described in Schedule 1 to this Agreement («Project»).
2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section III of Schedule 2 to this Agreement.
2.03. The Front-end Fee is one quarter of one percent (0.25%) of the Loan amount.
2.04. The Commitment Charge is one quarter of one percent (0.25%) per annum on the Unwithdrawn Loan Balance.
2.05. The interest rate is the Reference Rate plus the Variable Spread or such rate as may apply following a Conversion; subject to Section 3.02(e) of the General Conditions.
2.06. The Payment Dates are March 15 and September 15 in each year.
2.07. The principal amount of the Loan shall be repaid in accordance with Schedule 3 to this Agreement.
Article III
PROJECT
3.01. The Borrower declares its commitment to the objectives of the Project. To this end, the Borrower shall carry out the Project in accordance with the provisions of Article V of the General Conditions, and Schedule 2 to this Agreement.
Article IV
EFFECTIVENESS; TERMINATION
4.01. The Additional Conditions of Effectiveness consist of the following, namely that the Borrower has adopted a Project Operations Manual (POM) in a form and manner satisfactory to the Bank.
4.02. The Effectiveness Deadline is the date ninety (90) days after the Signature Date.
Article V
REPRESENTATIVE; ADDRESSES
5.01. The Borrower’s Representative is the President of the Management Board of the Borrower.
5.02. For purposes of Section 10.01 of the General Conditions: (a) the Borrower’s Address is:
Hrvatska banka za obnovu i razvitak
Strossmayerov trg 9
10000 Zagreb
Republic of Croatia
(b) The Borrower’s Electronic Address is:
Facsimile: + (385-1) 4597-882
E-mail: funding@hbor.hr
5.03. For purposes of Section 10.01 of the General Conditions: (a) the Bank’s address is:
International Bank for Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America; and
(b) the Bank’s Electronic Address is:
Facsimile: (1-202) 477-6391 Email: gvincelette@worldbank.org
AGREED as of the Signature Date.
Elisabetta CapannelliTamara PerkoHrvoje Čuvalo, MSc
SCHEDULE 1
PROJECT DESCRIPTION
The objectives of the Project are: (i) to support the recovery of private sector Exporters from the economic impact of the COVID-19 pandemic; (ii) enhance access to finance to enterprises in Underserved Segments and Lagging Regions; and (iii) to strengthen the Borrower’s institutional capacity as a development bank.
The Project consists of the following part:
Credit Line
Establishment and operation of a credit facility for: (a) the provision of Subsidiary Financing to select Participating Financial Institutions (PFIs) to provide Sub-loans to Beneficiaries; and (b) the provision of selective Direct Full-financing or of Co-financing to provide Sub-loans to Beneficiaries, all for the purposes of supporting Working Capitals and/or Financial Restructuring.
SCHEDULE 2
PROJECT EXECUTION
Section I.
IMPLEMENTATION ARRANGEMENTS
A. Institutional Arrangements
1. Without limitation to the provisions of Article V of the General Conditions, and except as the Bank shall otherwise agree, the Borrower shall maintain at all times during the implementation of the Project, a PIU, within the Borrower, with composition, resources, terms of reference and functions acceptable to the Bank. The PIU shall be responsible for the day-to-day implementation of the Project including disbursement, monitoring and evaluation, reporting, and ensuring compliance with environmental and social obligations and arrangements under the Project, as further elaborated in the POM.
B. Project Operations Manual (POM)
1. The Borrower shall carry out the Project, in accordance with POM, satisfactory to the Bank, which shall include the rules, guidelines, standard documents and procedures for the carrying out of the Project, including the following:
(a) a detailed description of the institutional and implementation arrangements of the Project;
(b) a detailed description of the eligibility criteria, conditionalities and procedures for the Sub-Projects, Sub-Loans, and Beneficiaries;
(c) a detailed description of detailed policies and procedures for the selection and financing of Sub-projects;
(d) the Project accounting, auditing, reporting, financial, and disbursement procedures;
(e) the environmental and social obligations and arrangements for the Project;
(f) the indicators to be used in the monitoring and evaluation of the Project and procedures for Project monitoring, supervision and evaluation, including the format and content of the Project Reports;
(g) the Performance Based Conditions (PBC) verification protocols; and
(h) the requirements of the Anti-Corruption Guidelines.
2. The POM may not be assigned, amended, abrogated or waived, or permitted to be assigned, amended, abrogated or waived, or any provision thereof, in a manner which, in the opinion of the Bank, may materially and adversely affect the implementation of the Project.
The POM may only be amended in consultation with, and after approval of, the Bank. In case of any conflict between the terms of the POM and those of this Agreement, the terms of this Agreement shall prevail.
C. Direct Full-Financing or Co-financing Sub-loan Agreements
1. To facilitate the carrying out of the provision of selective Direct Full-Financing and Co-financing Sub-loans to Beneficiaries under the Project, the Borrower shall make available part of the proceeds of the Loan pursuant to the terms of a Sub-loan Agreement between the Borrower and the Beneficiary, under the terms and conditions as set forth in the POM, and including the Anti-Corruption Guidelines, all satisfactory to the Bank (the «Direct Full-Financing or Co-financing Sub-loan Agreement»).
2. The Borrower shall exercise its rights under the Direct Full-Financing or Co-financing Sub-loan Agreement in such manner as to protect the interests of the Borrower and the Bank and to accomplish the purposes of the Loan.
3. Except as the Bank shall otherwise agree, the Borrower shall not assign, amend, abrogate or waive the Direct Full-Financing or Co-financing Sub-loan Agreement or any provision thereof.
(a) For the purposes of the Project, the Borrower shall extend proceeds of the Loan through the provision of Direct Full-Financing or Co-financing, all in accordance with the provisions set forth in the POM, pursuant to Direct Full-Financing or Co-financing Sub-loans Agreement(s) on terms and conditions which shall have been approved by the Bank, shall include the Anti-Corruption Guidelines, and require compliance with the ESCP.
(b) The Borrower shall comply, and cause the Beneficiary, through the Sub-Loan Agreement to comply, with the relevant terms of this Agreement, including the Anti-Corruption Guidelines, the environmental and social requirements and the POM.
(c) The Borrower shall monitor the overall execution of the Project in accordance with policies and procedures as defined in the POM and satisfactory to the Bank.
(d) The Borrower shall ensure that no Excluded Activities are included in any Sub-project.
(e) The Borrower shall exercise their rights under their respective Direct Full-Financing or Co-financing Sub-loans Agreements in such manner as to protect the interests of the Bank and the Borrower and to accomplish the purposes of the Loan, including the right to suspend or terminate the right of a Beneficiary to use the proceeds of a Sub-loan extended for a given Sub-project, or accelerate or obtain a refund of all or any part of the amount of said Sub-loan, upon the Beneficiary’s failure to perform any of its obligations under the related Direct Full-Financing or Co-financing Sub-loan Agreement or to comply with the ESCP or the provisions of the Anti-Corruption Guidelines applicable to recipients of loan proceeds other than the Borrower.
(f) The Borrower shall not assign, amend, abrogate or waive any such Direct Full-Financing or Co-financing Sub-loans Agreements or any provision thereof, except as the Bank shall otherwise agree.
(g) The Borrower shall at all times throughout the implementation of the Program, ensure that the sum of sub-loans to any individual Beneficiary or group of connected Beneficiaries will not exceed Euro 8.5 million equivalent, unless the World Bank otherwise agrees.
4. In cases of inconsistencies between the provisions of any Direct Full-Financing or Co-financing Sub-loan Agreements, and the provisions of this Agreement, the provisions of this Agreement shall prevail.
D. PFI Subsidiary Financing Agreements
1. To facilitate the carrying out of the provision of Subsidiary Financing to select PFIs to provide Sub-loans to Beneficiaries under the Project, the Borrower shall make available part of the proceeds of the Loan pursuant to the terms of a Subsidiary Financing Agreement between the Borrower and the PFIs, under the terms and conditions as set forth in the POM, and including the Anti-Corruption Guidelines, all satisfactory to the Bank (the «PFI Subsidiary Agreement»).
2. The Borrower shall exercise its rights under the PFI Subsidiary Financing Agreements in such manner as to protect the interests of the Borrower and the Bank and to accomplish the purposes of the Loan.
3. Except as the Bank shall otherwise agree, the Borrower shall not assign, amend, abrogate or waive the PFI Subsidiary Financing Agreements or any provision thereof.
4. For the purposes of the Project, the Borrower shall:
(a) select PFIs, acceptable to the Bank, pursuant to the eligibility criteria and procedures set forth in the POM; and
(b) on-lend proceeds of the Loan through the provision of Subsidiary Financing, all in accordance with the provisions set forth in the POM, pursuant to PFI Subsidiary Financing Agreements on terms and conditions which shall have been approved by the Bank, shall include the Anti-Corruption Guidelines, require compliance with the ESCP, and the following:
(i) Unless otherwise the World Bank agrees, the eligible PFIs’ obligations are to:
(A) on-lend the proceeds of the Loan through the provision of a Sub-loan provided to a Beneficiary for the carrying out of a Sub-project under a Sub-Loan Agreement to be entered into between a PFI and a Beneficiary, under terms and conditions acceptable to the Bank, all in accordance with the POM (the Sub-Loan Agreement);
(B) comply, and cause the Beneficiary, through the Sub-Loan Agreement to comply, with the relevant terms of this Agreement, including the Anti-Corruption Guidelines, the environmental and social requirements and the POM;
(ii) monitor the overall execution of the Project and the carrying out by the PFIs of their obligations under their respective Subsidiary Financing Agreements in accordance with policies and procedures satisfactory to the Bank;
(iii) ensure that no Excluded Activities are included in any Sub-project;
(iv) take or cause to be taken all action necessary or appropriate on their part to enable the PFIs to perform, in accordance with the provisions of their respective Subsidiary Financing Agreements, all the obligations of the PFIs therein set forth, and not take or permit to be taken any action which would prevent or interfere with such performance;
(v) exercise their rights under their respective PFI Subsidiary Financing Agreements in such manner as to protect the interests of the Bank and the Borrower and to accomplish the purposes of the Loan, including the right to suspend or terminate the right of a Beneficiary to use the proceeds of a Sub-loan extended by a PFI for a given Sub-project, or accelerate or obtain a refund of all or any part of the amount of said Sub-loan, upon the Beneficiary’s failure to perform any of its obligations under the related Sub-loan Agreement or to comply with the ESCP or the provisions of the Anti-Corruption Guidelines applicable to recipients of loan proceeds other than the Borrower;
(vi) not assign, amend, abrogate or waive any such PFI Subsidiary Financing Agreements or any provision thereof, except as the Bank shall otherwise agree; and
(vii) at all times throughout the implementation of the Program, ensure that the sum of sub-loans to any individual Beneficiary or group of connected Beneficiaries from one or more PFIs will not exceed Euro 8.5 million equivalent, unless the World Bank otherwise agrees.
5. In cases of inconsistencies between the provisions of any Subsidiary Financing Agreement, and the provisions of this Agreement, the provisions of this Agreement shall prevail.
E. Sub-projects
1. The Borrower shall ensure that Sub-project proposals shall be selected, appraised, and evaluated by the PFIs and the Borrower, as the case may be, and Sub-loan Agreements shall be entered into, all in accordance with the principles, eligibility criteria and procedures set forth in the POM, the Anti-Corruption Guidelines, the ESCP and the respective provisions of Schedule 2, Section I, Part C or Part D of this Agreement.
2. In accordance with the ESCP, the Borrower shall, and shall through the respective PFIs, require each Beneficiary to:
(a) carry out its obligations under the Sub-loan Agreement with due diligence and efficiency and in accordance with sound technical, economic, financial, managerial, environmental and social standards and practices satisfactory to the Bank, including in accordance with the provisions of the Anti-Corruption Guidelines applicable to recipients of loan proceeds other than the Borrower and the POM;