Hrvatski sabor
19
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT UČINKOVITOG PRAVOSUĐA ZA BOLJE POSLOVNO OKRUŽENJE
Proglašavam Zakon o potvrđivanju Ugovora o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt učinkovitog pravosuđa za bolje poslovno okruženje, koji je Hrvatski sabor donio na sjednici 18. svibnja 2020.
Klasa: 011-01/20-01/83
Urbroj: 71-06-01/1-20-2
Zagreb, 22. svibnja 2020.
Predsjednik
Republike Hrvatske
Zoran Milanović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT UČINKOVITOG PRAVOSUĐA ZA BOLJE POSLOVNO OKRUŽENJE
Članak 1.
Potvrđuje se Ugovor o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt učinkovitog pravosuđa za bolje poslovno okruženje, sklopljen u Zagrebu 15. travnja 2020. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
LOAN NUMBER 9057-HR
LOAN AGREEMENT
(JUSTICE FOR BUSINESS PROJECT) BETWEEN REPUBLIC OF CROATIA AND INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
LOAN AGREEMENT
AGREEMENT dated as of the Signature Date between REPUBLIC OF CROATIA («Borrower») and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank»). The Borrower and the Bank hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
1.01. The General Conditions (as defined in the Appendix to this Agreement) apply to and form part of this Agreement.
1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement.
Article II
LOAN
2.01. The Bank agrees to lend to the Borrower the amount of one hundred million Euro (€100,000,000), as such amount may be converted from time to time through a Currency Conversion («Loan»), to assist in financing the Parts 1, 2.1, 2.2, 2.3 and 3.1 of the project described in Schedule 1 to this Agreement («Project»).
2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section III of Schedule 2 to this Agreement.
2.03. The Front-end Fee is one quarter of one percent (0.25%) of the Loan amount.
2.04. The Commitment Charge is one quarter of one percent (0.25%) per annum on the Unwithdrawn Loan Balance.
2.05. The interest rate is the Reference Rate plus the Fixed Spread or such rate as may apply following a Conversion; subject to Section 3.02(e) of the General Conditions.
2.06. The Payment Dates are May 15 and November 15 in each year.
2.07. The principal amount of the Loan shall be repaid in accordance with Schedule 3 to this Agreement.
Article III
PROJECT
3.01. The Borrower declares its commitment to the objectives of the Project. To this end, the Borrower shall carry out Part 1.1 of the Project through the MOEEC, Part 1.2 of the Project through the MOCPP, Part 3.2 (a) through MOEEC and MOCPP respectively, and Parts 2, 3.1 and 3.2 (b) of the Project through MOJ, all in accordance with the provisions of Article V of the General Conditions and Schedule 2 to this Agreement.
Article IV
REMEDIES OF THE BANK
4.01. The Additional Event of Suspension consists of the following, namely that the Borrower’s Courts Act and Courts Areas and Seats Act shall have been amended, suspended, abrogated, repealed or waived so as to affect, materially and adversely, in the opinion of the Bank, the ability of the Borrower to carry out the Project.
4.02. The Additional Event of Acceleration consists of the following, namely that the event specified in Section 4.01 of this Agreement occurs and is continuing for a period of 60 days after notice of the event has been given by the Bank to the Borrower.
Article V
EFFECTIVENESS; TERMINATION
5.01. The Additional Condition of Effectiveness consists of the following, namely that the Borrower has established a Project Implementation Unit (PIU) under terms, conditions, composition, functions, and resources satisfactory to the Bank.
5.02 The Effectiveness Deadline is the date ninety (90) days after the Signature Date.
Article VI
REPRESENTATIVE; ADDRESSES
6.01. The Borrower’s Representative is the Minister in charge of finance.
6.02. For purposes of Section 10.01 of the General Conditions the Borrower’s address is:
Ministry of Finance
Katanciceva 5
10000 Zagreb
Republic of Croatia
Facsimile: (385-1) 4922-598.
6.03. For purposes of Section 10.01 of the General Conditions:
(a) the Bank’s address is:
International Bank for Reconstruction and Development
1818 H Street, N. W.
Washington, D.C. 20433
United States of America; and
(b) the Bank’s Electronic Address is:
Facsimile: 1-202-477-6391
AGREED as of the Signature Date.
REPUBLIC OF CROATIA
Name: Zdravko Marić
Title: Deputy Prime Minister and Minister of Finance
Date: 15 April 2020
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
Name: Elisabetta Capannell
Title: Country Manager
Date: 14 April 2020/
SCHEDULE 1
PROJECT DESCRIPTION
The objective of the Project is to improve the business regulatory procedures and justice service standards for businesses and citizens.
The Project consists of the following parts:
Part 1 – Reducing the administrative burden for businesses to interact with government
1. Provision of financing of payments for Eligible Expenditure Programs (EEPs) to support the simplification and automatization of procedures to start and operate a business in the Borrower’s territory, through the carrying out of the following activities:
(a) Implementing and expanding a single digital window to enable a one-stop-shop online registration of and key changes to Limited Liability Companies (LLCs) established in the Borrower’s territory.
(b) Online publishing and consolidating of licensing requirements to start a business activity in the Borrower’s territory and digitalization of selected licenses procedures.
2. Provision of financing of payments for EEPs to support the simplification of construction permitting and improve availability of construction services, through:
(a) The expanded use of E-Dozvola.
(b) Simplification of the requirements for the provision of professional services in the construction sector
Part 2 – Improving justice services for businesses and citizens
1. Provision of financing of payments for EEPs to support the expanded use of electronic services in the justice sector by justice sector users and interested stakeholders, including e-communication systems and the use of an integrated court management system (ICMS) by courts.
2. Provision of financing of payments for EEPs to support the reduction of: (a) the judiciary courts’ backlog of pending cases older than 10 years; and (b) the Disposition Time for the issuance of judicial decisions in cases before commercial courts, all through the adoption of procedural regulatory reforms, case management improvements, and facilitating access to management tools.
3. Provision of technical assistance, Training, goods and works to rehabilitate and upgrade selected judicial court facilities in Zagreb, Vinkovci, Kutina and Varazdin for better court performance and user experience, including, as applicable, aspects related to: (a) standardized spaces for judges and courts; (b) user access and public spaces including separate circulation where feasible, and waiting areas for victims and court personnel; (c) inclusive design focused on gender aspects and people with disabilities; (d) environmentally friendly designs and features, including adoption of energy efficiency standards, waste and recycling management systems; (e) extensive use of information technology support systems for automated operations of the building and judicial services; and (f) security and safety standards and procedures for both internal and exterior areas and the use of safety related equipment as necessary.
4. Provision of technical assistance to strengthen public investment management practices on the judiciary to optimize infrastructure spending.
Part 3: Project Management
1. Provision of goods, technical assistance, Training, and Operating Costs to support the PIU in the overall day-to-day implementation of the Project, including procurement, financial management, monitoring, and evaluation, carrying out of audits, safeguards and carrying out of engagement surveys.
2. Provision of additional technical assistance to provide advisory services for the implementation of the Project in areas related to: (a) reducing the administrative burden for businesses to interact with government; and (b) improving justice services for businesses and citizens; as further elaborated in the Project Operations Manual.
SCHEDULE 2
PROJECT EXECUTION
Section I. Implementation Arrangements
A. Institutional Arrangements
1. Without limitation to the provisions of Article V of the General Conditions, and except as the Bank shall otherwise agree, the Borrower shall:
(a) maintain at all times during the implementation of the Project, a PIU, within the MOJ, with composition, resources, terms of reference and functions acceptable to the Bank. The PIU shall be responsible for the day-to-day implementation of the Project including disbursement, procurement, monitoring and evaluation, reporting, carrying out engagement surveys, and ensuring safeguards compliance under the Project as further elaborated in the Project Operations Manual; and
(b) establish by not later than three months following the Effective Date and thereafter maintain at all times during the implementation of the Project, a high-level Steering Committee, with composition, resources, terms of reference and functions acceptable to the Bank. The Steering Committee shall be responsible for providing strategic guidance, overall oversight of the Project and coordination and monitoring of the Project led initiatives and reforms among the various ministries and agencies involved in the implementation of the Project.
2. The Borrower shall by not later than 2 months following the Effective Date appoint the focal points within: (a) the MOEEC to support the implementation of Part 1.1 of the Project; (b) the MOCPP to support the implementation of Part 1.2 of the Project; and (c) the MOJ to support the implementation of Parts 2 and 3.1 of the Project, all under terms of reference and functions acceptable to the Bank, and in line with the POM.
B. Project Operations Manual
1. The Borrower, through the PIU, shall adopt not later than two (2) months after the Effective Date, and thereafter carry out the Project, in accordance with a manual («Project Operations Manual» or «POM»), satisfactory to the Bank, which shall include the rules, methods, guidelines, standard documents and procedures for the carrying out of the Project, including the following: (a) the detailed description of the Project activities and the institutional arrangements of the Project; (b) the description of DLIs and the criteria, detailed rules and procedures for DLIs implementation and monitoring; (c) the DLI Verification Protocols; (d) the Project accounting, auditing, reporting, financial, procurement and disbursement procedures; (e) the monitoring indicators for the Project; and (f) the detailed Project costs and financing.
2. The POM may not be assigned, amended, abrogated or waived, or permitted to be assigned, amended, abrogated or waived, or any provision thereof, in a manner which, in the opinion of the Bank, may materially and adversely affect the implementation of the Project. The POM may only be amended in consultation with, and after approval of, the Bank. In case of any conflict between the terms of the POM and those of this Agreement, the terms of this Agreement shall prevail.
C. Annual Work Plan and Budget
The Borrower, through PIU, shall:
(a) unless otherwise agreed with the Bank, prepare and furnish to the Bank not later than October 15 of each year during the implementation of the Project, starting in 2020 a proposed Annual Work Plan and Budget for the next calendar year containing: (i) all activities to be carried out under the Project during that calendar year; and (ii) a proposed financing plan for expenditures required for such activities, setting forth the proposed amounts and sources of financing; and
(b) provide the Bank a reasonable opportunity to exchange views with the Borrower on each such proposed Annual Work Plan and Budget, and shall thereafter ensure that the Project is implemented with due diligence during said following year, in accordance with such Annual Work Plan and Budget as shall have been approved by the Bank; and not make or allow to be made any change to the approved Annual Work Plan and Budget without the Bank’s prior written approval.
D. Environmental and Social Standards
1. The Borrower, through the PIU, shall ensure that the Project is carried out in accordance with the Environmental and Social Standards, in a manner acceptable to the Bank.
2. Without limitation upon paragraph 1 above, the Borrower, through the PIU, shall ensure that the Project is implemented in accordance with the Environmental and Social Commitment Plan («ESCP»), in a manner acceptable to the Bank. To this end, the Borrower, through the PIU, shall ensure that:
(a) the measures and actions specified in the ESCP are implemented with due diligence and efficiency, and as further specified in the ESCP;
(b) sufficient funds are available to cover the costs of implementing the ESCP;
(c) policies, procedures and qualified staff are maintained to enable it to implement the ESCP, as further specified in the ESCP; and
(d) the ESCP or any provision thereof, is not amended, revised or waived, except as the Bank shall otherwise agree in writing and the Borrower has, thereafter, disclosed the revised ESCP.
In case of any inconsistencies between the ESCP and the provisions of this Agreement, the provisions of this Agreement shall prevail.
3. The Borrower, through the PIU, shall:
(a) take all measures necessary on its part to collect, compile, and furnish to the Bank through regular reports, with the frequency specified in the ESCP, and promptly in a separate report or reports, if so requested by the Bank, information on the status of compliance with the ESCP and the management tools and instruments referred to therein, all such reports in form and substance acceptable to the Bank, setting out, inter alia: (i) the status of implementation of the ESCP; (ii) conditions, if any, which interfere or threaten to interfere with the implementation of the ESCP; and (iii) corrective and preventive measures taken or required to be taken to address such conditions; and
(b) promptly notify the Bank of any incident or accident related to or having an impact on the Project which has, or is likely to have, a significant adverse effect on the environment, the affected communities, the public or workers, in accordance with the ESCP, the instruments referenced therein and the Environmental and Social Standards.
4. The Borrower, through the PIU, shall maintain and publicize the availability of a grievance mechanism, in form and substance satisfactory to the Bank, to hear and determine fairly and in good faith all complaints raised in relation to the Project, and take all measures necessary to implement the determinations made by such mechanism in a manner satisfactory to the Bank.
Section II. Project Monitoring Reporting and Evaluation
The Borrower, through the PIU, shall furnish to the Bank each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.
Section III. Withdrawal of Loan Proceeds
A. General