Na temelju članka 30. stavka 1. Zakona o sklapanju i izvršavanju međunarodnih ugovora (»Narodne novine«, broj 28/96), Vlada Republike Hrvatske je na sjednici održanoj 17. siječnja 2019. godine donijela
UREDBU
O OBJAVI SPORAZUMA O DODJELI BESPOVRATNIH SREDSTAVA IZMEĐU REPUBLIKE HRVATSKE I RAZVOJNE BANKE VIJEĆA EUROPE U VEZI S REGIONALNIM PROGRAMOM STAMBENOG ZBRINJAVANJA ZA POTPROJEKT BR. HR7 (2018)
Članak 1.
Objavljuje se Sporazum o dodjeli bespovratnih sredstava između Republike Hrvatske i Razvojne banke Vijeća Europe u vezi s Regionalnim programom stambenog zbrinjavanja za Potprojekt br. HR7 (2018), potpisan u Parizu 14. kolovoza 2018. godine i u Zagrebu 19. studenoga 2018. godine, u izvorniku na engleskom jeziku.
Članak 2.
Tekst Sporazuma iz članka 1. ove Uredbe, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
Sub-Project n° HR7 (2018)
GRANT AGREEMENT
BETWEEN THE REPUBLIC OF CROATIA AND THE COUNCIL OF EUROPE DEVELOPMENT BANK IN RELATION TO THE REGIONAL HOUSING PROGRAMME
The parties to this Grant Agreement (hereinafter, the «Agreement») are the REPUBLIC OF CROATIA, through Central State Office for Reconstruction and Housing Care, Savska cesta 28,
10000 Zagreb, Croatia (the «Partner Country») and the COUNCIL OF EUROPE
DEVELOPMENT BANK, International Organisation, with its headquarters at 55 avenue Kléber, 75116 Paris, France («CEB» or the «Finance Institution», jointly referred to hereinafter as the «Parties», each a «Party»).
WHEREAS
(A) CEB and the Partner Country entered into a Framework Agreement in relation to the Regional Housing Programme which was signed on 3 December 2013 and ratified by the Parliament of the Republic of Croatia on 4 April 2014 (with reference numbers KLASA:
022-03/14-01/44 and URBROJ: 65-14-02 attributed to it by the Partner Country) and which, following CEB’s receipt of the Partner Country’s notice pursuant to Article 14 of such Framework Agreement, entered into force on 1 June 2014 (the «Framework Agreement»).
(B) The Assembly of Donors approved on 6 June 2018 an investment subsidy grant to the Partner Country from the RHP Fund resources, as further described under Article 1 (the «Grant») for financing the sub-project under the Partner Country’s Country Housing Project called «Construction of a residential building for 21 families in Vukovar», as further described under Appendix A (the «Sub-Project»).
(C) The Partner Country has given its full agreement to the Grant and to the implementation of the Sub-Project.
(D) The Parties have decided to conclude the Agreement to set out the terms and conditions concerning (i) the transfer and utilisation of the Grant; and (ii) the implementation of the Sub-Project.
NOW THEREFORE the Parties hereby agree as follows:
Definitions
In this Agreement the defined terms and expressions shall bear the same meaning as given to them in the Framework Agreement and the following defined term and expression shall bear the following meaning, unless the context requires otherwise.
«Final Beneficiaries» means the final beneficiaries of the Sub-Project as defined in Appendix A hereto.
Article 1
THE GRANT
1.1 CEB shall, in the manner referred to in Paragraph 1.2 of this Article, place at the disposal of the Partner Country the Grant in an aggregate amount of up to EUR 859 499 (eight hundred fifty nine thousand four hundred and ninety-nine Euros), subject to Paragraph 1.8 of this Article.
1.2 Subject to the terms of this Agreement and to all conditions precedent for disbursement set out in Article 2 below being fulfilled, having received a duly completed and signed request for Grant Tranche disbursement from the Partner Country, substantially in the form set out in Appendix B (Request for Grant Tranche disbursement (Template)) hereto, CEB shall deposit the Grant in a minimum of two (2) Grant Tranches in the Special Account (as defined in Article 3.4 (Special Account) of the Framework Agreement):
1.3 Any positive interest earned on the balance on the Special Account shall be used exclusively to fund the Sub-Project under the Agreement mentioned above, and any negative interest accrued on the balance on the Special Account shall be borne by the Partner Country.
1.4 The Grant shall be paid in EURO (EUR). All financial accounts and statements shall be expressed in EUR.
1.5 The first Grant Tranche, representing an advance payment, shall be in an amount not exceeding 30% of the approved Grant amount, excluding the contingency reserve and the expenditure verification costs (set out in Appendix A hereto). It shall be disbursed to the Partner Country following the signature of the Agreement, subject to all conditions precedent for disbursement set out in Article 2 below being fulfilled.
1.6 The amount of each subsequent Grant Tranche shall be determined according to the Current State of Progress of Works and the Projected State of Progress of Works, as presented by the Partner Country in the Progress Reports pursuant to Article 5.
1.7 Each of the subsequent Grant Tranches can be disbursed only after the Partner Country presents a Progress Report to the CEB, subject to compliance with Article 5 below, confirming that 70% of the funds already disbursed by CEB to the Partner Country have been disbursed in accordance with the provisions of the Framework Agreement and the Agreement, subject to all conditions precedent for disbursement set out in Article 2 below being fulfilled.
1.8 It is expressly acknowledged and agreed that the CEB shall not be obliged to make any payment under and/or pursuant to this Agreement, except to the extent that an amount in respect of, and equal to, such payment is available in the RHP Fund account for purposes of financing this Sub-Project.
1.9 Pursuant to Article 3.3 (Completion Date) of the Framework Agreement the Completion Date with respect to the Sub-Project is estimated to be up to 29 months following the entry into force of the present Agreement and no later than 30 November 2021.
Article 2
CONDITIONS PRECEDENT FOR DISBURSEMENT
2.1 Pursuant to Article 3.2 (Conditions precedent for disbursement) of the Framework Agreement the conditions precedent for disbursement of the Grant are the following:
2.1.1 Prior to the disbursement of the first Grant Tranche:
a) The Partner Country shall deliver a legal opinion in the English language satisfactory to CEB covering the issues of capacity, power and authority of the Republic of Croatia to enter into the Framework Agreement and the Agreement and confirming that both agreements constitute valid, binding and enforceable undertakings.
b) The Partner Country’s Implementing Structure as defined in Article 4 of the Framework Agreement and as further specified in Article 4 below has been established and is operational to the satisfaction of CEB in accordance with the criteria outlined in Appendix 3 to the Framework Agreement.
c) Pursuant CEB’s Procurement Guidelines the Partner Country shall provide to CEB a procurement plan with respect to the Sub-Project approved by CEB.
d) Pursuant to the Assembly of Donors’ decision of 11 October 2013, an 18 months’ time limit with respect to the period from the Assembly of Donors’ approval of a grant request for a sub-project and the first disbursement from the CEB to the Partner Country under the relevant Grant Agreement for such approved sub-project applies. Hence, should no disbursement have occurred under this Agreement by 6 December 2019 (18 months from 6 June 2018), the Assembly of Donors, if it deems it appropriate, may (i) cancel the Grant approved in favour of this Sub-Project and (ii) re-allocate these funds in favour of other sub-projects.
2.1.2 Prior to the disbursement of any subsequent Grant Tranches:
– The Partner Country shall provide to the CEB information on the Grant implementation progress in the form of the Progress Report pursuant to Article 5 satisfactory to the CEB.
2.1.3 Prior to the disbursement of the last Grant Tranche:
– The Partner Country shall provide to the CEB in addition to the Progress Report an Expenditure Verification Report pursuant to Article 4.10.5 (Expenditure verification) of the Framework Agreement prepared by an external auditor whereby such auditor shall have been chosen and such Expenditure Verification Report shall have been prepared in accordance with the terms of reference set out in Appendix E (Terms of reference for an expenditure verification of a grant received from the RHP Fund) hereto, both satisfactory to the CEB.
– The Partner Country acknowledges that the Terms of Reference for Expenditure Verification (Appendix E of this Agreement) result from top-level requirements to the CEB from the European Union and explicitly accepts that the CEB has the right to modify the said Appendix E from time to time in order to flow down modified requirements from the European Union.
– The Partner Country shall publish the list of final beneficiaries, which have been selected according to UNHCR vulnerability criteria and under UNHCR monitoring, approximately 6 months before the completion of works and in any case prior to the disbursement of the last Grant Tranche.
Article 3
CONDITIONS FOR USE OF THE GRANT
3.1 The Partner Country acknowledges that this Agreement is subject to and incorporates by reference the terms and conditions of the Framework Agreement, including its Appendices, in full. In particular:
a) Pursuant to Article 2 (Conditions for use of the Grant/CHP Support Grant) the Grant made available by CEB shall be used exclusively for the Sub-Project.
b) The Grant shall not be used for financing non-eligible expenditure as outlined in Appendix F hereto.
c) The Sub-Project shall be implemented in accordance with Article 2 (Conditions for use of the Grant/CHP Support Grant) and Article 4 (Country Housing Project undertakings) of the Framework Agreement.
d) Pursuant to Article 7 (Consequences of failure to comply) of the Framework Agreement in the event of failure to comply with the provisions of Article 2 (Conditions for use of the Grant/CHP Support Grant) and Article 4 (Country Housing Project undertakings) of the Framework Agreement, CEB reserves the right to suspend, cancel or request immediate repayment of the Grant. Before such a claim is made, consultations shall be held between the Parties.
3.2 Allocation of Grant Tranches: Pursuant to Article 4.7.3 (Allocation of Grant Tranches) of the Framework Agreement (i) each Grant Tranche must be Allocated by the Partner Country to the component parts of the Sub-Project (identified by means of the Progress Reports as in the form set out in Appendix C hereto) within twelve (12) months from its disbursement date (the «Allocation End Date») and (ii) any amount not so Allocated must be repaid to the RHP Fund account managed by CEB within three (3) months from the Allocation End Date.
3.3 Latest date for implementation of works/supplies/services: Expenditure financed under this Grant Agreement must be incurred within 24 months from the entry into force of this Agreement until and no later than 30 June 2021 («Latest date for implementation
of works/supplies/services»). The term 1397967985incurred’ means services rendered, supplies delivered or works carried out.
3.4 Any balance remaining unspent of the Sub-Project or any repayment of the Grant in accordance with the Framework Agreement and the Agreement shall be deposited in EUR in the RHP Fund account within five (5) months from the Latest date for implementation of works/supplies/services, unless otherwise agreed. Such deposit into the RHP Fund account shall be made via the EUR account opened in the name of the Council of Europe Development Bank:
Article 4
IMPLEMENTING STRUCTURE OF THE SUB-PROJECT
4.1 Pursuant to Article 4.1.1 (Lead Institution) of the Framework Agreement the Partner Country has designated the State Office for Reconstruction and Housing as the Lead Institution with respect to the Country Housing Project and this Sub-Project thereunder.
4.2 Pursuant to Article 4.1.2 (Project Implementing Unit) of the Framework Agreement the Partner Country entrusts: (i) the implementation of the Sub-Project to the Project Implementation Unit situated within the Central State Office for Reconstruction and Housing acting as the Project Implementation Unit (the «PIU»); and (b) the project reporting to be made to CEB to the State Office for Reconstruction and Housing.
In any event, the responsibility to comply with all obligations under the Agreement remains with the Partner Country.
4.3 If unforeseen increases in expenditures are expected or realised (whether due to inflationary factors, fluctuation in exchange rates, natural and human-made disasters or other unforeseen contingencies), the Partner Country shall duly inform CEB on a timely basis and proceed in accordance with Article 4.8 (Increased or revised cost of a sub – project under the Country Housing Project) of the Framework Agreement. In any event, pursuant to Article 4.8 (Increased or revised cost of a sub-project under the Country Housing Project) of the Framework Agreement CEB does not undertake to cover any expenses in excess of the aggregate amount of the Grant set out in Article 1 of the Agreement.
Article 5
PROGRESS REPORTS ON THE SUB-PROJECT
5.1 Progress Reports: Pursuant to Article 4.10.2 (Progress Reports on sub-projects/CHP Support) of the Framework Agreement the Partner Country through the Lead Institution, shall provide on a 4-monthly basis, with respect to the cut-off dates of 30 April, 31 August and 31 December of every year until the last disbursement request under this Agreement (each such date, a «Cut-Off Date») on a date falling no later than 14 calendar days from the Cut-Off Date and if such date falls on a weekend or public holiday in the Partner Country then on the next following business day (each such date, a «Reporting Date») with the first Cut-Off Date under this Agreement falling on 31 December 2018 and the first Reporting Date under this Agreement falling on 15 January 2019, information to CEB on the Grant implementation progress in the framework of the Progress Reports.
In addition to the regular 4-monthly Progress Reports, the Partner Country shall also provide information to the CEB on the Grant implementation progress, in the form of the Progress Report, prior to any request for disbursement of Grant Tranches. If the timing of the submission of the request for disbursement coincides with the timing of the submission of the regular 4-monthly Progress Report, then the latter shall suffice. These Progress Reports shall be deemed satisfactory by the CEB before any disbursement may be made.
Appendix C hereto is a template specifying the minimum information required by CEB for Progress Reports.
In any case, the Progress Reports shall address at least the following:
a) detailed description of activities, including beneficiary selection and protection elements, carried out during the reporting period;
b) progress in the achievement of results against a set of indicators;
c) impact (economic, social and environmental) prospects;
d) sustainability;
e) state of Allocation of the Grant Tranches, which are disbursed to the Partner Country by CEB (cost committed);
f) progress of the procurement related activities;
g) incurred and disbursed expenditure and forecast for future expenditure expected to be incurred and disbursed for a determined period of time; and
h) visibility actions.
Reporting on expenditure shall be expressed in EUR or, should payments be made in any other currency, reporting on expenditure shall be expressed in local currency and converted into EUR at the exchange rate of the date of conversion of the corresponding Grant Tranche into local currency.
5.2 Completion Report: Pursuant to Article 4.10.2 (Progress Reports on sub-projects/CHP Support) of the Framework Agreement the Completion Report, which shall be provided to CEB within three (3) months following the Latest date for implementation of works/supplies/services under the Sub-Project, shall include an overall assessment of the performance of the Sub-Project against its objectives, as well as an assessment of the use of the Grant. The Completion Report must be deemed satisfactory by the CEB.
5.3 Final Report: Pursuant to Article 4.10.3 (Country Housing Project Final Report) of the Framework Agreement, and to the extent this Agreement is the last Grant Agreement under the Framework Agreement, upon the physical completion of the entire Country Housing Project, the Partner Country shall present to CEB a Final Report no later than two (2) months after the submission of the Completion Report. The Final Report shall refer to and take stock of all sub-projects under the Country Housing Project that received a Grant from the RHP Fund and shall contain an appraisal of the Country Housing Project’s economic, financial, social and environmental effects. The Final Report must be deemed satisfactory by the CEB.
Appendix D hereto is a template specifying the minimum information required by CEB for the Final Report.
Article 6
REPRESENTATIONS AND WARRANTIES
The Partner Country represents and warrants:
a) that it is authorized to enter into the Agreement and it has given the signatory(ies) the authorization therefor, in accordance with the laws, decrees, regulations and other texts applicable to it;
b) that the drawing up and execution of the Agreement does not contravene the laws, decrees, regulations and other texts applicable to it.
Article 7
NOTICES
7.1 Any notice to be given to either Party with respect to the Agreement shall be effectively given or sent by letter or facsimile to the Parties as addressed below. The address of either Party may be changed by notices in the manner set out in this provision.
7.2 Any notice to CEB shall be addressed to:
Council of Europe Development Bank
55, avenue Kléber
75116 Paris – France
7.3 Any notice to the Partner Country shall be addressed to: Central State Office for Reconstruction and Housing Care
Savska cesta 28, 10000 Zagreb, Croatia
Attention: Head of the Central State Office
Fax: + 385 1 61 84 707
Article 8
AMENDMENTS
8.1 This Agreement may be modified by written amendment entered into by CEB and the Partner Country.
Article 9
DISPUTE RESOLUTION
9.1 Any dispute arising out of or in connection with the Agreement, including its existence, validity, interpretation or termination shall be settled amicably between the Parties.
9.2 In default of amicable settlement, disputes shall be subject to arbitration in accordance with the terms of Article 11 (Dispute resolution) of the Framework Agreement.
Article 10
ENTRY INTO FORCE
10.1 The Agreement shall enter into force on the date of the last signature by the Parties.
Article 11
INTERPRETATION
11.1 The Partner Country acknowledges that this Agreement is subject to and incorporates by reference the terms and conditions of the Framework Agreement in full.
11.2 In the event of discrepancies, inconsistencies and/or conflicts between the terms of the Framework Agreement and this Agreement, the documents shall prevail in the following order: (i) this Agreement; (ii) the Framework Agreement.
IN WITNESS WHEREOF, the undersigned, being duly authorized thereto, have signed the Agreement in the English language in two (2) originals.
Potprojekt br. HR7 (2018)
SPORAZUM O DODJELI BESPOVRATNIH SREDSTAVA IZMEĐU REPUBLIKE HRVATSKE I RAZVOJNE BANKE VIJEĆA EUROPE U VEZI S REGIONALNIM PROGRAMOM STAMBENOG ZBRINJAVANJA
Stranke ovog Sporazuma o dodjeli bespovratnih sredstava (u daljnjem tekstu »Sporazum«) su REPUBLIKA HRVATSKA, putem Središnjeg državnog ureda za obnovu i stambeno zbrinjavanje, Savska cesta 28, 10000 Zagreb, Hrvatska (»zemlja partner«) i RAZVOJNA BANKA VIJEĆA EUROPE, međunarodna organizacija, s glavnim sjedištem na adresi: 55, avenue Kléber, 75116 Pariz, Francuska (»CEB« ili »financijska institucija«, u daljnjem tekstu zajednički navedene kao »stranke«, a svaka pojedinačno »stranka«).
BUDUĆI DA
(A) CEB i zemlja partner sklopile su Okvirni sporazum u vezi s Regionalnim programom stambenog zbrinjavanja, koji je potpisan 3. prosinca 2013. i koji je Hrvatski Sabor potvrdio 4. travnja 2014. (pod brojem KLASA: 022-03/14-01/44 i URBROJ: 65-14-02 koji mu je dodijelila zemlja partner) i koji je, po primitku obavijesti koji je zemlja partner podnijela CEB-u, sukladno članku 14. tog Okvirnog sporazuma, stupio na snagu 1. lipnja 2014. (»Okvirni sporazum«).
(B) Skupština donatora odobrila je 6. lipnja 2018. investicijsku potporu u obliku bespovratnih sredstava zemlji partneru iz sredstava Fonda RPSZ-a, kako što je opisano u članku 1. (»bespovratna sredstva«) za financiranje Potprojekta u okviru Nacionalnog programa stambenog zbrinjavanja (NPSZ) zemlje partnera pod nazivom Izgradnja višestambene zgrade za 21 obitelj u Vukovaru, kao što je dalje opisano u Dodatku A (»Potprojekt«).
(C) Zemlja partner je dala je punu suglasnost na bespovratna sredstva i na provedbu Potprojekta.
(D) Stranke su odlučile sklopiti Sporazum kako bi odredile odredbe i uvjete koji se odnose na (i) prijenos i korištenje bespovratnih sredstava; i (ii) provedbu Potprojekta.
STOGA su se stranke sporazumjele kako slijedi:
Definicije
U ovom Sporazumu utvrđeni pojmovi i izrazi imaju isto značenje kao u Okvirnom sporazumu i sljedeći utvrđeni pojmovi i izrazi imaju sljedeće značenje, osim ako sadržaj ne zahtijeva drugačije.
»Krajnji korisnici« znači krajnji korisnici Potprojekta, kako je određeno u Dodatku A.
Članak 1.
BESPOVRATNA SREDSTVA
1.1 CEB će, na način kako je opisano u stavku 1.2. ovog članka, staviti na raspolaganje zemlji partneru bespovratna sredstva u ukupnom iznosu od 859 499 EUR (osamsto pedeset devet tisuća četiristo devedeset i devet eura), sukladno stavku 1.8 ovog članka.
1.2 U skladu s uvjetima ovog Sporazuma i u skladu sa svim preduvjetima za isplatu iz članka 2. koji se moraju ispuniti, po primitku uredno ispunjenog i potpisanog Zahtjeva za isplatu rate bespovratnih sredstava od strane zemlje partnera, sadržajno u obliku navedenom u Dodatku B (Zahtjev za isplatu rate bespovratnih sredstava (Predložak)), CEB polaže bespovratna sredstva u najmanje dvije (2) rate na poseban račun (kao što je određeno u članku 3.4 (Poseban račun) Okvirnog sporazuma:
1.3 Pozitivna kamata u bilo kojem iznosu koja nastane na posebnom računu koristit će se isključivo za financiranje Potprojekta u skladu s gore navedenim Sporazumom, a trošak bilo koje negativne kamate koja se obračuna na saldo na posebnom računu snosit će zemlja partner.
1.4 Bespovratna će se sredstva isplaćivati u eurima (EUR). Svi će financijski izvještaji i računi biti izraženi u EUR.
1.5 Prva rata bespovratnih sredstava, koja predstavlja predujam, neće premašiti 30% odobrenog iznosa bespovratnih sredstava, isključujući pričuvu za nepredviđene izdatke i izdatke za verifikaciju troškova (kako je navedeno u Dodatku A). Ona će biti isplaćena zemlji partneru nakon potpisivanja Sporazuma, podložno ispunjenju svih uvjeta koji prethode isplati kako je utvrđeno u članku 2. niže.
1.6 Iznos svake sljedeće rate bespovratnih sredstava određuje se sukladno Trenutačnom stanju radova i predviđenom razvoju radova, u skladu s navodima zemlje partnera u izvješćima o napretku u skladu s člankom 5.
1.7 Svaka od sljedećih rata bespovratnih sredstava može biti isplaćena tek nakon što zemlja partner CEB-u predstavi Izvješće o napretku Potprojekta, podložno usklađenosti s člankom 5. niže, potvrđujući da je 70% sredstava koje je CEB prethodno isplatio zemlji partneru isplaćeno u skladu s odredbama Okvirnog sporazuma i Sporazuma, podložno ispunjenju svih uvjeta koji prethode isplati kako je utvrđeno u članku 2. niže u tekstu.
1.8 Izričito se priznaje i ugovara da CEB nije obvezan izvršiti bilo kakvu isplatu sukladno ili prema ovom Sporazumu, osim u mjeri u kojoj je iznos takve isplate ili jednak iznos na raspolaganju na računu Fonda RPSZ-a u svrhe financiranja ovog Potprojekta.
1.9 U skladu s člankom 3.3. (Datum završetka) Okvirnog sporazuma, procjenjuje se da je datum završetka Potprojekta 29 mjeseci nakon stupanja na snagu ovog Sporazuma, a najkasnije 30. studenoga 2021.
Članak 2.
UVJETI KOJI PRETHODE ISPLATI
2.1 U skladu s člankom 3.2. (Uvjeti koji prethode isplati) Okvirnog sporazuma, primjenjuju se sljedeći uvjeti koji prethode isplati:
2.1.1 Prije isplate prve rate bespovratnih sredstava:
a) Zemlja partner mora dostaviti pravno mišljenje na engleskom jeziku koje je zadovoljavajuće CEB-u i koje obuhvaća pitanja sposobnosti i ovlasti Republike Hrvatske za sklapanje Okvirnog sporazuma i Sporazuma. Zemlja partner potvrđuje da navedeni sporazumi predstavljaju valjane, obvezujuće i provedive obveze.
b) Provedbena struktura zemlje partnera kako je navedeno u članku 4. Okvirnog sporazuma te kako je određeno u članku 4. niže, uspostavljena je i funkcionira na način koji je zadovoljavajući CEB-u, u skladu s kriterijima navedenima u Prilogu 3. Okvirnom sporazumu.
c) U skladu sa Smjernicama za nabavu CEB-a, zemlja partner mora CEB-u dostaviti plan nabave u odnosu na Potprojekt koji je odobrila Razvojna banka Vijeća Europe.
d) U skladu s odlukom Skupštine donatora od 11. listopada 2013., primjenjuje se 18-mjesečno razdoblje od odobrenja zahtjeva za dodjelu bespovratnih sredstava za Potprojekt do isplate prve rate od strane Razvojne banke Vijeća Europe zemlji partneru sukladno Sporazumu o dodjeli bespovratnih sredstava za taj odobreni Potprojekt. Dakle, ako temeljem ovog Sporazuma nijedna isplata ne bude realizirana do 6. prosinca 2019. (18 mjeseci od 6. lipnja 2018.), Skupština donatora može, ako to smatra prikladnim, (i) poništiti bespovratna sredstva u korist tog dotičnog Potprojekta i (ii) preraspodijeliti ta sredstva u korist ostalih projekata.
2.1.2 Prije isplate bilo koje sljedeće rate bespovratnih sredstava:
– Zemlja partner mora CEB-u dostaviti informacije o napretku provedbe bespovratnih sredstava u obliku izvješća o napretku Potprojekta u skladu s člankom 5., a koje je zadovoljavajuće CEB-u.
2.1.3 Prije isplate posljednje rate bespovratnih sredstava:
– Uz izvješće o napretku Potprojekta, zemlja partner dostavit će CUB-u i izvješće o verifikaciji troškova u skladu s člankom 4.10.5 (Verifikacija troškova) Okvirnog sporazuma koje izrađuje vanjski revizor, pri čemu taj revizor mora biti odobren i to izvješće o verifikaciji troškova pripremljeno sukladno opisu poslova koji je naveden u Dodatku E (Opis poslova za verifikaciju troškova bespovratnih sredstva iz Fonda RPSZ-a) na način koji je zadovoljavajući CEB-u.
– Zemlja partner potvrđuje da Opis poslova za verifikaciju troškova (Dodatak E ovom Sporazumu) proistječe iz zahtjeva koji s visoke razine Europska unija postavlja pred CEB i izričito pristaje da CEB ima pravo periodički mijenjati navedeni Dodatak E u skladu s izmijenjenim zahtjevima Europske unije.
– Zemlja partner objavit će popis krajnjih korisnika koji su odabrani sukladno UNHCR-ovim kriterijima ranjivosti i pod UNHCR-ovim nadzorom, otprilike šest mjeseci prije završetka radova, a u svakom slučaju prije isplate posljednje rate bespovratnih sredstava.
Članak 3.
UVJETI ZA KORIŠTENJE BESPOVRATNIH SREDSTAVA
3.1 Zemlja partner prihvaća da ovaj Sporazum u cijelosti podliježe uvjetima Okvirnog sporazuma, uključujući i njegove Priloge, i da ih sadržava, a osobito:
a) U skladu s člankom 2. (Uvjeti za korištenje bespovratnih sredstava/Potpore NPSZ-u), bespovratna sredstva dostupna od strane CEB-a koriste se isključivo za Potprojekt.
b) Bespovratna se sredstva ne koriste za financiranje neprihvatljivih troškova kako je istaknuto u Dodatku F ovom Sporazumu.
c) Potprojekt će se provoditi u skladu s člankom 2. (Uvjeti za korištenje bespovratnih sredstava/Potpore NPSZ-u) i člankom 4. (Obveze u okviru Nacionalnog programa stambenog zbrinjavanja) Okvirnog sporazuma.
d) U skladu s člankom 7. (Posljedice neispunjavanja uvjeta) Okvirnog sporazuma, u slučaju nepoštivanja odredbi članka 2. (Uvjeti korištenja bespovratnih sredstava/Potpore NPSZ-u) i članka 4. (Obveze u okviru Nacionalnog programa stambenog zbrinjavanja) Okvirnog sporazuma, CEB zadržava pravo obustave, poništenja ili zahtijevanja hitnog povrata bespovratnih sredstava. Prije postavljanja takvog zahtjeva stranke će se međusobno posavjetovati.
3.2 Dodjela rata bespovratnih sredstava: U skladu s člankom 4.7.3. (Dodjela rata bespovratnih sredstava) Okvirnog sporazuma (i) zemlja partner mora svaku ratu bespovratnih sredstava dodijeliti sastavnim dijelovima Potprojekta (utvrđenim u izvješću o napretku na način opisan u Dodatku C) u roku od dvanaest (12) mjeseci od datuma njezine isplate (»Datum završetka dodjele«) i (ii) svaki iznos koji nije dodijeljen na taj način mora biti vraćen na račun Fonda RPSZ-a kojim upravlja CEB u roku od tri (3) mjeseca od datuma završetka dodjele.
3.3 Posljednji datum provedbe radova/dostave robe/pružanja usluga: Troškovi koji se financiraju u skladu s ovim Sporazumom o dodjeli bespovratnih sredstava, moraju nastati unutar 24 mjeseca od stupanja na snagu ovog Sporazuma, a najkasnije do 30. lipnja 2021. (»Posljednji datum provedbe radova/dostave robe/pružanja usluga«). Pojam »nastali« odnosi se na pružene usluge, izvršene dostave i izvedene radove.
3.4 Bilo koji iznos neutrošenih sredstava Potprojekta ili bilo koja otplata bespovratnih sredstava, mora se, u skladu s Okvirnim sporazumom i Sporazumom, položiti na račun Fonda RPSZ-a u EUR u roku od pet (5) mjeseci od posljednjeg datuma provedbe radova/dostave robe/pružanja usluga, osim ako nije drukčije dogovoreno. Polog se uplaćuje na račun Fonda RPSZ-a preko računa (EUR) otvorenog u ime Razvojne banke Vijeća Europe:
Članak 4.
PROVEDBENA STRUKTURA POTPROJEKTA
4.1 U skladu s člankom 4.1.1. (Vodeća institucija) Okvirnog sporazuma, zemlja partner imenovala je Središnji državni ured za obnovu i stambeno zbrinjavanje kao vodeću instituciju u odnosu na Nacionalni program stambenog zbrinjavanja i Potprojekt koji proistječe iz tog Programa.
4.2 U skladu s člankom 4.1.2 (Jedinica za provedbu projekta) Okvirnog sporazuma, zemlja partner povjerava (i) provedbu Potprojekta jedinici za provedbu projekta smještenoj unutar Središnjeg državnog ureda za obnovu i stambeno zbrinjavanje (»JPP«) i (ii) projektno izvještavanje CEB-u povjerava Središnjem državnom uredu za obnovu i stambeno zbrinjavanje.
U svakom slučaju, odgovornost je zemlje partnera pridržavati se svih obveza koje proistječu iz Sporazuma.
4.3 Ako se očekuje ili ostvari nepredviđen porast troškova (bilo zbog inflatornih čimbenika, fluktuacije tečajeva, prirodnih katastrofa i onih izazvanih ljudskim djelovanjem ili drugih nepredviđenih događaja), zemlja partner mora o tome propisno i pravovremeno obavijestiti CEB i postupiti temeljem članka 4.8. (Povećani ili izmijenjeni trošak Potprojekta u okviru Nacionalnog programa stambenog zbrinjavanja) Okvirnog sporazuma. U svakom slučaju, u skladu s člankom 4.8. (Povećani ili izmijenjeni trošak Potprojekta u okviru Nacionalnog programa stambenog zbrinjavanja) Okvirnog sporazuma, CEB se ne obvezuje pokriti troškove u iznosu koji premašuje ukupan iznos bespovratnih sredstava utvrđen u članku 1. ovog Sporazuma.
Članak 5.
IZVJEŠĆE O NAPRETKU POTPROJEKTA
5.1 Izvješća o napretku: U skladu s člankom 4.10.2 (Izvješća o napretku Potprojekata/ Potpore NPSZ-u) Okvirnog sporazuma, zemlja partner, preko vodeće institucije svaka četiri mjeseca dostavlja, s prijelomnim datumima 30. travnja, 31. kolovoza i 31. prosinca svake godine, do posljednjeg zahtjeva za isplatu sredstava temeljem ovog Sporazuma (svaki taj datum, »Prijelomni datum«), a ne kasnije od 14 kalendarskih dana od prijelomnog datuma, a ako se taj datum odnosi na vikend ili državni praznik u zemlji partneru, onda sljedeći radni dan (svaki takav datum, »Datum izvještavanja«), s prvim prijelomnim datumom 31. prosinca 2018. i prvim datumom izvještavanja 15. siječnja 2019., u skladu s ovim Sporazumom, podatke CEB-u u vezi napredovanja provedbe bespovratnih sredstava u okviru izvješća o napretku.
Uz redovna četveromjesečna izvješća o napretku, zemlja partner također će dostaviti informacije CEB-u o tijeku provedbe bespovratnih sredstava, u okviru Izvješća o napretku, prije svakog zahtjeva za isplatu rata bespovratnih sredstava. Ako se vrijeme podnošenja zahtjeva za isplatu podudara s vremenom podnošenja redovnog četveromjesečnog Izvješća o napretku, tada će potonje biti dostatno. Prije bilo koje isplate, CEB mora izvješća o napretku smatrati zadovoljavajućima.
Dodatak C ovom Sporazumu predložak je koji sadrži osnovne podatke koje CEB zahtijeva u izvješćima o napretku.
U svakom slučaju, izvješća o napretku trebaju sadržavati barem ove osnovne informacije:
a) detaljan opis aktivnosti, uključujući odabir korisnika i zaštitu osobnih podataka, koje su provedene tijekom izvještajnog razdoblja
b) napredak u ostvarivanju rezultata u odnosu na pokazatelje
c) vjerojatnost učinaka (gospodarskih, socijalnih, ekoloških)
d) održivost
e) stanje dodjele rata bespovratnih sredstava koje Razvojna banka Vijeća Europe isplaćuje zemlji partneru (opredijeljeni troškovi)
f) napredak aktivnosti vezanih uz postupak javne nabave
g) nastale i pokrivene izdatke i prognozu budućih izdataka koji se očekuju i koji će biti pokriveni tijekom određenog vremenskog razdoblja i
h) aktivnosti vezane uz vidljivost.
Izvještavanje o izdacima mora biti izraženo u eurima ili, ako se plaćanja izvršavaju u bilo kojoj drugoj valuti, u nacionalnoj valuti izraženoj u protuvrijednosti u eurima pri čemu se primjenjuje devizni tečaj na datum konverzije predmetne rate bespovratnih sredstava u nacionalnu valutu.
5.2 Izvješće o završetku: U skladu s člankom 4.10.2 (Izvješća o napretku Potprojekata/Potpore NPSZ-u) Okvirnog sporazuma, Izvješće o završetku, koje će biti dostavljeno CEB-u u roku od tri (3) mjeseca nakon posljednjeg datuma provedbe radova/dostave robe/pružanja usluga unutar Potprojekta, uključuje ukupnu ocjenu izvođenja Potprojekta u odnosu na postavljene ciljeve, kao i ocjenu korištenja bespovratnih sredstava. CEB mora Izvješće o završetku smatrati zadovoljavajućim.
5.3 Završno izvješće: U skladu s člankom 4.10.3 (Završno izvješće o Nacionalnom programu stambenog zbrinjavanja) i pod uvjetom da je ovaj Sporazum posljednji Sporazum o dodjeli bespovratnih sredstava prema Okvirnom sporazumu, po fizičkom dovršetku cjelokupnog Nacionalnog programa stambenog zbrinjavanja, zemlja partner predstavlja Završno izvješće CEB-u najkasnije dva (2) mjeseca nakon podnošenja Izvješća o završetku. Završno će izvješće obuhvatiti i ocijeniti sve Potprojekte unutar Nacionalnog programa stambenog zbrinjavanja kojima su dodijeljena bespovratna sredstva iz Fonda RPSZ-a i sadržavat će procjenu gospodarskih, financijskih, socijalnih i ekoloških učinaka Nacionalnog programa. CEB mora Završno izvješće smatrati zadovoljavajućim.
Dodatak D ovom Sporazumu je predložak koji sadrži osnovne podatke koje CEB zahtijeva u izvještajima o napretku.
Članak 6.
IZJAVE I JAMSTVA
Zemlja partner izjavljuje i jamči:
a) da je ovlaštena za sklapanje Sporazuma i da je potpisnici/cama dala ovlaštenje za isto, sukladno zakonima, uredbama, propisima i drugim aktima koji se na njega primjenjuju
b) da izrada i izvršenje Sporazuma nisu u suprotnosti sa zakonima, uredbama, propisima i drugim aktima koji su na njega primjenjivi.
Članak 7. OBAVIJESTI
7.1 Bilo koja obavijest koja se isporučuje strankama u odnosu na Sporazum uručuje se ili šalje pismom ili telefaksom strankama na adrese navedene u nastavku. Adrese obiju stranaka mogu se mijenjati na način utvrđen ovom odredbom.
7.2 Sve obavijesti CEB-u upućuju se na adresu:
Razvojna banka Vijeća Europe
55, avenue Kléber
75116 Pariz – Francuska
7.3 Sve obavijesti zemlji partneru upućuju se na adresu:
Središnji državni ured za obnovu i stambeno zbrinjavanje
Savska cesta 28, 10000 Zagreb, Croatia
Prima: Državni tajnik Središnjeg državnog ureda za obnovu i stambeno zbrinjavanje
Telefaks: + 385 1 61 84 707
Članak 8.
IZMJENE I DOPUNE
8.1 Ovaj Sporazum može biti izmijenjen pisanom izmjenom i dopunom koju sklapaju CEB i zemlja partner.
Članak 9.
RJEŠAVANJE SPOROVA
9.1 Svaki spor koji proizlazi iz ili je u vezi sa Sporazumom, uključujući njegovo postojanje, valjanost, tumačenje ili prestanak, rješavat će se mirnim putem između stranaka.
9.2 U slučaju neuspjelog mirnog rješavanja spora, sporovi podliježu arbitraži u skladu s odredbama iz članka 11. (Rješavanje sporova) Okvirnog sporazuma.
Članak 10.
STUPANJE NA SNAGU
10.1 Sporazum stupa na snagu datumom zadnjeg potpisa stranaka.
Članak 11.
TUMAČENJE
11.1 Zemlja partner priznaje da ovaj Sporazum podliježe i uključuje u cijelosti odredbe Okvirnog sporazuma.
11.2 U slučaju odstupanja, nedosljednosti i/ili sukoba između odredaba Okvirnog sporazuma i ovog Sporazuma, navedeni akti imaju prvenstvo slijedećim redoslijedom: (i) ovaj Sporazum; (ii) Okvirni sporazum.
U POTVRDU TOGA, niže potpisani, za to propisno ovlašteni, potpisali su Sporazum na engleskom jeziku u dva (2) izvornika.
APPENDIX A
SUB-PROJECT DESCRIPTION
DODATAK A
OPIS POTPROJEKTA
Procijenjeni ukupan trošak Potprojekta1 262 436 EUR
Logical Framework Matrix