Hrvatski sabor
42
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT MODERNIZACIJE I RESTRUKTURIRANJA CESTOVNOG SEKTORA
Proglašavam Zakon o potvrđivanju Ugovora o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt modernizacije i restrukturiranja cestovnog sektora, koji je Hrvatski sabor donio na sjednici 30. lipnja 2017.
Klasa: 011-01/17-01/45
Urbroj: 71-06-01/1-17-2
Zagreb, 5. srpnja 2017.
Predsjednica
Republike Hrvatske
Kolinda Grabar-Kitarović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT MODERNIZACIJE I RESTRUKTURIRANJA CESTOVNOG SEKTORA
Članak 1.
Potvrđuje se Ugovor o zajmu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt modernizacije i restrukturiranja cestovnog sektora, potpisan u Zagrebu 8. svibnja 2017. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora o zajmu iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
LOAN AGREEMENT
AGREEMENT dated May 8, 2017 between REPUBLIC OF CROATIA («Borrower») and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank»). The Borrower and the Bank hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement.
1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement.
Article II
LOAN
2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, the amount of twenty two million Euro (€ 22,000,000), as such amount may be converted from time to time through a Currency Conversion in accordance with the provisions of Section 2.08 of this Agreement («Loan»), to assist in financing the project described in Schedule 1 to this Agreement («Project»).
2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of Schedule 2 to this Agreement.
2.03. The Front-end Fee payable by the Borrower shall be equal to one quarter of one percent (0.25%) of the Loan amount. The Borrower shall pay the Front-end Fee not later than sixty days after the Effective Date.
2.04. The Commitment Charge payable by the Borrower shall be equal to one quarter of one percent (0.25%) per annum on the Unwithdrawn Loan Balance.
2.05. The interest payable by the Borrower for each Interest Period shall be at a rate equal to the Reference Rate for the Loan Currency plus the Fixed Spread; provided, however, that the interest payable shall in no event be less than zero percent (0%) per annum; and provided furthermore that, upon a Conversion of all or any portion of the principal amount of the Loan, the interest payable by the Borrower during the Conversion Period on such amount shall be determined in accordance with the relevant provisions of Article IV of the General Conditions. Notwithstanding the foregoing, if any amount of the Withdrawn Loan Balance remains unpaid when due and such non-payment continues for a period of thirty days, then the interest payable by the Borrower shall instead be calculated as provided in Section 3.02 (e) of the General Conditions.
2.06. The Payment Dates are May 15 and November 15 in each year.
2.07. The principal amount of the Loan shall be repaid in accordance with the amortization schedule and provisions set forth in Schedule 3 to this Agreement.
2.08. (a) The Borrower may at any time request any of the following Conversions of the terms of the Loan in order to facilitate prudent debt management: (i) a change of the Loan Currency of all or any portion of the principal amount of the Loan, withdrawn or unwithdrawn, to an Approved Currency; and (ii) a change of the interest rate basis applicable to: (A) all or any portion of the principal amount of the Loan withdrawn and outstanding from a Variable Rate to a Fixed Rate, or vice versa; or (B) all or any portion of the principal amount of the Loan withdrawn and outstanding from a Variable Rate based on a Reference Rate and the Variable Spread to a Variable Rate based on a Fixed Reference Rate and the Variable Spread, or vice versa; or (C) all of the principal amount of the Loan withdrawn and outstanding from a Variable Rate based on a Variable Spread to a Variable Rate based on a Fixed Spread; and (iii) the setting of limits on the Variable Rate or the Reference Rate applicable to all or any portion of the principal amount of the Loan withdrawn and outstanding by the establishment of an Interest Rate Cap or Interest Rate Collar on the Variable Rate or the Reference Rate.
(b) Any conversion requested pursuant to paragraph (a) of this Section that is accepted by the Bank shall be considered a «Conversion», as defined in the General Conditions, and shall be effected in accordance with the provisions of Article IV of the General Conditions and of the Conversion Guidelines.
Article III
PROJECT
3.01. The Borrower declares its commitment to the objective of the Project. To this end, the Borrower shall carry out Parts A and B(a) of the Project through its Ministry of Sea, Transport and Infrastructure, and shall cause Parts B(b) of the Project to be carried out by HC and HAC, Parts B(c) and B(d) of the Project to be carried out by HAC and ARZ, Part B(e) of the Project to be carried out by HC and Part B(f) of the Project to be carried out by HAC, each in accordance with the provisions of Article V of the General Conditions and the Subsidiary Agreement or Inter-Institutional Agreements, as relevant.
3.02. Without limitation upon the provisions of Section 3.01 of this Agreement, and except as the Borrower and the Bank shall otherwise agree, the Borrower shall ensure that the Project is carried out in accordance with the provisions of Schedule 2 to this Agreement.
Article IV
REMEDIES OF THE BANK
4.01. The Additional Event of Suspension consists of the following, namely that any of the HC Legislation, HAC Legislation or ARZ Legislation has been amended, suspended, abrogated, repealed or waived so as to affect materially and adversely the ability of any of HC, HAC or ARZ to perform any of their obligations under the respective Subsidiary Agreement or Inter-Institutional Agreement, as relevant.
4.02. The Additional Event of Acceleration consists of the following, namely that any event specified in Section 4.01 of this Agreement occurs and is continuing for a period of sixty (60) days after notice of the event has been given by the Bank to the Borrower.
Article V
EFFECTIVENESS
5.01. The Additional Conditions of Effectiveness consist of the following:
(a) The Subsidiary Agreement and inter-Institutional Agreements have been executed on behalf of the Borrower and each of HC, HAC and ARZ, as relevant.
(b) The Project Implementation Manual shall have been adopted by the Borrower, through MSTI, in a manner satisfactory to the Bank.
5.02. The Additional Legal Matter consists of the following, namely that the Subsidiary Agreement and Inter-Institutional Agreements have been duly authorized or ratified by the Borrower, MSTI, and each of HC, HAC and ARZ (as relevant) and are legally binding upon the Borrower, MSTI each of HC, HAC and ARZ (as relevant) in accordance with their terms.
5.03. The Effectiveness Deadline is the date one hundred and eighty (180) days after the date of this Agreement.
Article VI
REPRESENTATIVE; ADDRESSES
6.01. The Borrower’s Representative is its minister in charge of finance or any successor thereto.
6.02. The Borrower’s Address is:
Ministry of Finance
Katanciceva 5 10000 Zagreb
Republic of Croatia
Facsimile:
+385 1 4591416
6.03. The Bank’s Address is:
International Bank for Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America
Telex: Facsimile:
248423(MCI) or 1-202-477-6391
64145(MCI)
AGREED at Zagreb, Republic of Croatia, as of the day and year first above written.
SCHEDULE 1
PROJECT DESCRIPTION
The objective of the Project is to strengthen institutional effectiveness, enhance operational efficiency and increase debt service capacity of the Borrower’s road sector.
The Project consists of the following parts:
Part A: Institutional Strengthening and Sector Reforms
The objective of this component is to establish an institutional framework for the road sector, including through:
(a) Financial Transaction Advisor
Hiring of a financial transaction advisor who shall, inter alia: (a) prepare a debt optimization strategy for the Road Sector Companies; (b) analyze debt facilities for rescheduling and refinancing; (c) propose the type and sequencing of the refinancing instrument; and (d) develop and implement the engagement strategy for communication, negotiation and conclusion of the arrangements with the capital market.
(b) Transport Sector Planning and Road Sector Governance and Monitoring
(i) Development of a directorate in the MSTI to coordinate strategic planning and public investment management.
(ii) Development of a sector governance framework including definition of KPIs and monitoring arrangements.
(iii) Establishment of an application for data exchange and reporting between MSTI and the Road Sector Companies.
(iv) Improvement and standardization of accounting practices across the Road Sector Companies.
(v) Improvement of the business environment for the freight transport industry through review of administrative processes applied to the road transport sector.
(vi) Introduction and improvement of citizen engagement through consultation processes.
(c) Implementation support
Provision of support to MSTI in managing and coordinating the Project and building its procurement, financial management, safeguards management, monitoring and evaluation capacity, dealing with legal, public relations, communication and human resources matters through the provision of technical advisory services, Training, as well as Project audits.
Part B: Operational Restructuring of Road Sector Companies
The objective of this component is to implement management tools and carry out the revenue enhancement and cost rationalization actions required to improve operational and financial sustainability of the Road Sector Companies, including through:
(a) Road classification and standards
Provision of support to MSTI and the Road Sector Companies to: (i) implement a technical classification of the public road network; and (ii) develop consistent sets of maintenance-related regulations and specifications for all classes of roads.
(b) Road Asset Management System
(i) Design and implementation of a road asset management system (RAMS) for all Road Sector Companies to comprise a computerized database with inventory, condition and traffic data.
(ii) Development of a multi-year costed road maintenance program by each Road Sector Company.
(c) Rationalization of Operations and Business Functions – Motorways
(i) Development of action plans and their implementation to improve technical and business efficiency and effectiveness through optimization of management and roads’ operations and maintenance costs, outsourcing enhancement and rationalization of technical units, administrative activities and revenue improvements.
(ii) Provision of staff retrenchment packages to include support for retraining, counselling, advisory services and employment intermediation.
(d) Tolling
Carrying out of studies to identify the preferred automated tolling system and new tariff structure, including plans to transition from the current system and pricing regime.
(e) Operational and business rationalization of HC
Development of an action plan to support the: (i) restructuring and transition of HC to a regional management system based on six regions; (ii) carrying out of joint procurement at regional level among HC and ZUC; (iii) development of improved maintenance contracting practices; and (iv) assessment and programming of periodic maintenance based on the RAMS.
(f) Road Safety
Carrying out of technical studies for purpose of increasing road safety on the motorway system including tunnels and traffic information.
SCHEDULE 2
PROJECT EXECUTION
Section I.
Implementation Arrangements
A. Project Steering Committee
The Borrower, through MSTI, shall maintain at all times during the implementation of the Project, the Project Steering Committee (PSC) chaired by the Minister of MSTI with composition, mandate and resources satisfactory to the Bank, for the purpose of guidance and monitoring of all technical and financial aspects of the sector reform and debt refinancing, while ensuring Project oversight and timely decision making, including being responsible for strategic guidance of Project implementation and coordination of the Project-led initiatives and reforms.
B. Project Implementation Unit
The Borrower, shall ensure that the Project Implementation Unit (PIU), established within MSTI, is maintained at all times during the implementation of the Project, with composition, mandate and resources satisfactory to the Bank, for the purpose of ensuring prompt and efficient overall coordination, implementation and communication of Project activities, including being responsible for: (i) technical investments, retrenchment and human resources aspects; (ii) financial management and procurement; (iii) ensuring compliance with environmental and social safeguards; (iv) preparing and circulating progress reports every semester; and (v) monitoring and evaluation of Project activities. The PIU shall report to the Minister of MSTI and the PSC.
C. Subsidiary Agreement and Inter-Institutional Agreements
(a) To facilitate the carrying out of Parts B(b), (c), (d) and (f) of the Project, the Borrower, through MOF, shall make part of the proceeds of the Loan available to HAC under a subsidiary agreement between the Borrower, through MOF and MSTI, and HAC (the Subsidiary Agreement), under terms and conditions approved by the Bank, whereby, inter alia: (i) the Borrower, through MOF and MSTI, agrees to make available to HAC, on a grant basis and free of any charges, part of the proceeds of the Loan to finance HAC’s activities described under Part B(c)(ii) of the Project; (ii) HAC agrees to cooperate with the Borrower in the carrying out of the activities under Part B (b), (c), (d) and (f) of the Project, including by exchanging information, holding reviews and providing reports on the progress of activities under its responsibility in accordance with the terms and conditions set forth in this Agreement, as well as by complying with the Anti-Corruption Guidelines, Project Implementation Manual and World Bank’s Safeguard Policies; and (iii) the Borrower, through MOF and MSTI, agrees to take all action necessary to permit HAC to implement Parts B (b), (c), (d) and (f) of the Project.
(b) The Borrower, through MOF and MSTI, shall exercise its rights and carry out its obligations under the Subsidiary Agreement in such manner as to protect the interests of the Borrower and the Bank and to accomplish the purposes of the Loan. Except as the Bank shall otherwise agree, the Borrower shall not assign, amend, abrogate or waive the Subsidiary Agreement or any of its provisions.
(c) To facilitate the carrying out of: (i) Parts B(b) and B (e) of the Project, the Borrower, through MSTI, shall enter into an inter-institutional agreement with HC (the Inter-Institutional Agreement/HC), under terms and conditions approved by the Bank, whereby, inter alia: (1) HC agrees to cooperate with MSTI in the carrying out of the activities under Parts B(b)and B(e) of the Project, including by exchanging information, holding reviews and providing reports on the progress of activities under its responsibility in accordance with the terms and conditions set forth in this Agreement, as well as by complying with the Project Implementation Manual, the Anti-Corruption Guidelines and the World Bank’s Safeguards Policies; and (2) the Borrower agrees to take all action necessary to permit HC to implement Part B(b) and B(e) of the Project; and (ii) Parts B (c) and B (d) of the Project, the Borrower, through MSTI, shall enter into an inter-institutional agreement with ARZ (the Inter-Institutional Agreement/ARZ), under terms and conditions approved by the Bank, whereby, inter alia: (1) ARZ agrees to cooperate with MSTI in the carrying out of the activities under Parts B(c) and B(d) of the Project, including by exchanging information, holding reviews and providing reports on the progress of activities under its responsibility in accordance with the terms and conditions set forth in this Agreement, as well as by complying with the Project Implementation Manual, the Anti-Corruption Guidelines and World Bank’s Safeguards Policies.
(d) The Borrower, through MSTI, shall exercise its rights and carry out its obligations under each of the Inter-Institutional Agreements in such manner as to protect the interests of the Borrower and the Bank and to accomplish the purposes of the Loan. Except as the Bank shall otherwise agree, the Borrower shall not assign, amend, abrogate or waive the Inter-Institutional Agreements or any of their provisions.
D. Anti-Corruption
The Borrower shall ensure that the Project is carried out in accordance with the provisions of the Anti-Corruption Guidelines.
E. Project Implementation Manual
1. The Borrower, through MSTI, shall carry out the Project in accordance with a project implementation manual in form and substance satisfactory to the Bank, providing details of arrangements and procedures for the implementation of the Project, including: (a) capacity building activities for sustained achievement of the Project’s objective; (b) disbursement and financial management; (c) institutional administration, coordination and day-to-day execution of Project activities; (d) monitoring, evaluation, reporting (including mechanisms and formats for the preparation of Annual Work Plans and Budgets), information and communication; (e) procurement; and (f) such other administrative, financial, technical and organizational arrangements and procedures as shall be required for the Project; provided, however, that in case of any conflict between the provisions of the Project Implementation Manual and those of this Agreement, this Agreement shall prevail.
2. Except as the Bank shall otherwise agree, the Borrower, through MSTI, shall not amend, abrogate or waive any provision of the Project Implementation Manual if, in the opinion of the Bank, such amendment or waiver may materially and adversely affect the implementation of the Project.
F. Annual Work Plan and Budget
1. The Borrower, through MSTI, shall cause the Road Sector Companies to prepare and furnish to the Bank for review and approval, not later than one (1) month prior to the start of each fiscal year of the Borrower during the implementation of the Project, a proposed annual work plan and budget covering all activities proposed to be carried out under the Project in the forthcoming fiscal year.
2. Each such proposed annual work plan and budget shall specify among the activities, any training activities that may be required under the Project, including: (a) the type of training; (b) the purpose of the training; (c) the personnel to be trained; (d) the institution or individual who will conduct the training; (e) the location and duration of the training; (f) the cost of the training; and (g) the expected outcome and impact of the training.
3. The Borrower, through MSTI, shall cause the Road Sector Companies to afford the Bank a reasonable opportunity to exchange views with the Borrower on each such proposed annual work plan and budget, and thereafter to implement the Project or cause it to be implemented with due diligence in accordance with such annual work plan and budget as shall have been approved by the Bank.
G. Safeguards Instruments
1. The Borrower, through MSTI, shall cause each of the Road Sector Companies to ensure that an ESMS acceptable to the Bank is in place and operated in a manner acceptable to the Bank throughout Project implementation.
2. The Borrower, through MSTI, shall cause the Road Sector Companies to, not later than twelve (12) months after the Effective Date, carry out an ESCR under terms of reference satisfactory to the Bank, and on the basis of said ESCR, cause the Road Sector Companies to: (i) prepare and disclose an action plan that, inter alia, identifies actions, agreed with the Bank, as may be necessary for the environmentally and socially sustainable management of the Borrower’s road sector; and (ii) adopt such action plan not later than three months after the completion of the ESCR.
3. The Borrower, through MSTI, shall ensure that the Project Reports referred to in Part A of Section II of this Schedule include adequate information on the status of compliance with the provisions of this paragraph, including information on the status of preparation and implementation of the instruments referred to in paragraphs 1 and 2 herein.
4. For purposes of Part B (c)(ii) of the Project, the Borrower, through MSTI shall cause the Road Sector Companies to: (i) prepare Retrenchment Plans under terms of reference satisfactory to the Bank and on the basis of the Retrenchment Framework; (ii) adopt such Retrenchment Plans before any retrenchment is carried out under the Project; and (iii) ensure that any retrenchment of the Road Sector Companies’ staff is carried out according to such Retrenchment Plans, in a manner satisfactory to the Bank.
5. The Borrower, through MSTI, shall ensure that all terms of reference for any technical assistance, studies, and analytical work under the Project are consistent with the Bank’s environmental and social safeguards.
6. The Borrower, through MSTI, shall cause the Road Sector Companies to maintain a grievance redress mechanism for the Project, with adequate staffing and processes acceptable to the Bank, to address any grievances associated with potential retrenchment under the Project.
Section II.
Project Monitoring Reporting and Evaluation
A. Project Reports
1. The Borrower, through MSTI, shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators acceptable to the Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than one (1) month after the end of the period covered by such report.
B. Financial Management, Financial Reports and Audits
1. The Borrower, through MSTI, shall maintain or cause to be maintained a financial management system in accordance with the provisions of Section 5.09 of the General Conditions.
2. Without limitation on the provisions of Part A of this Section, the Borrower, through MSTI, shall prepare and furnish to the Bank as part of the Project Report not later than forty-five (45) days after the end of each calendar semester, interim unaudited financial reports for the Project covering the semester, in form and substance satisfactory to the Bank.
3. The Borrower, through MSTI, shall have the Project’s Financial Statements audited in accordance with the provisions of Section 5.09 (b) of the General Conditions. Each audit of the Financial Statements shall cover the period of one (1) fiscal year of the Borrower, commencing with the fiscal year in which the first withdrawal was made under the Project. The audited Financial Statements for each such period shall be furnished to the Bank not later than six (6) months after the end of such period.
4. The Borrower, through MSTI, shall cause each of the Road Sector Companies to have their respective financial statements and their consolidated HAC group financial statements, as applicable, audited by independent auditors acceptable to the Bank, in accordance with consistently applied auditing standards acceptable to the Bank. Each audit of these financial statements shall cover the period of one (1) fiscal year of the Borrower, commencing with the fiscal year in which the first withdrawal is made under the Project.