VLADA REPUBLIKE HRVATSKE
6
Na temelju članka 30. stavka 1. Zakona o sklapanju i izvršavanju međunarodnih ugovora (»Narodne novine«, broj 28/96), Vlada Republike Hrvatske je na sjednici održanoj 2. ožujka 2017. godine donijela
UREDBU
O OBJAVI SPORAZUMA O DODJELI BESPOVRATNIH SREDSTAVA IZMEĐU REPUBLIKE HRVATSKE I RAZVOJNE BANKE VIJEĆA EUROPE U VEZI S REGIONALNIM PROGRAMOM STAMBENOG ZBRINJAVANJA ZA POTPROJEKT BR. HR6 (2016)
Članak 1.
Objavljuje se Sporazum o dodjeli bespovratnih sredstava između Republike Hrvatske i Razvojne banke Vijeća Europe u vezi s Regionalnim programom stambenog zbrinjavanja za Potprojekt br. HR6 (2016), potpisan u Parizu 18. srpnja 2016. i u Zagrebu 27. srpnja 2016. godine, u izvorniku na engleskom jeziku.
Članak 2.
Tekst Sporazuma iz članka 1. ove Uredbe, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
Sub-Project n° HR6 (2016)
GRANT AGREEMENT BETWEEN THE REPUBLIC OF CROATIA AND THE COUNCIL OF EUROPE DEVELOPMENT BANK IN RELATION TO THE REGIONAL HOUSING PROGRAMME
The parties to this Grant Agreement (hereinafter, the «Agreement») are the REPUBLIC OF CROATIA, through State Office for Reconstruction and Housing Care, Radnička 22, 10000 Zagreb, Croatia (the «Partner Country») and the COUNCIL OF EUROPE DEVELOPMENT BANK, International Organisation, with its headquarters at 55 avenue Kléber, 75116 Paris, France («CEB» or the «Finance Institution», jointly referred to hereinafter as the «Parties», each a «Party»).
WHEREAS
(A) CEB and the Partner Country entered into a Framework Agreement in relation to the Regional Housing Programme which was signed on 3 December 2013 and ratified by the Parliament of the Republic of Croatia on 4 April 2014 (with reference numbers klasa: 022-03/14-01/44 and urbroj: 65-14-02 attributed to it by the Partner Country) and which, following CEB’s receipt of the Partner Country’s notice pursuant to Article 14 of such Framework Agreement, entered into force on 1 June 2014 (the «Framework Agreement»).
(B) The Assembly of Donors approved on 14 April 2016 an investment subsidy grant to the Partner Country from the RHP Fund resources, as further described under Article 1 (the «Grant») for financing the sub-project under the Partner Country’s Country Housing Project called «Renovation, reconstruction or construction of 62 family houses», as further described under Appendix A (the «Sub-Project»).
(C) The Partner Country has given its full agreement to the Grant and to the implementation of the Sub-Project.
(D) The Parties have decided to conclude the Agreement to set out the terms and conditions concerning (i) the transfer and utilisation of the Grant; and (ii) the implementation of the Sub-Project.
NOW THEREFORE the Parties hereby agree as follows:
DEFINITIONS
In this Agreement the defined terms and expressions shall bear the same meaning as given to them in the Framework Agreement and the following defined terms and expressions shall bear the following meaning, unless the context requires otherwise.
«Final Beneficiaries» means the final beneficiaries of the Sub-Project as defined in Appendix A hereto.
Article 1
THE GRANT
1.1 CEB shall, in the manner referred to in Paragraph 1.2 of this Article, place at the disposal of the Partner Country the Grant in an aggregate amount of up to EUR 2 000 000, subject to Paragraph 1.8 of this Article.
1.2 Subject to the terms of this Agreement and to all conditions precedent for disbursement set out in Article 2 below being fulfilled, having received a duly completed and signed request for Grant Tranche disbursement from the Partner Country, substantially in the form set out in Appendix B (Request for Grant Tranche disbursement (Template)) hereto, CEB shall deposit the Grant in a minimum of two (2) Grant Tranches in the Special Account (as defined in Article 3.4 (Special Account) of the Framework Agreement):
Account holder: Ministry of Finance
IBAN: HR52 1001 0051 5100 0014 4
Ref: Regional Housing Programme
Bank’s name: Croatian National Bank
Bank’s address: Trg hrvatskih velikana 3,
HR – 10002 Zagreb, Croatia
SWIFT BIC: NBHRHR2X
1.3 Any positive interest earned on the balance on the Special Account shall be used exclusively to fund the sub-project under the Grant Agreement mentioned above, and any negative interest accrued on the balance on the Special Account shall be borne by the Partner Country.
1.4 The Grant shall be paid in EURO (EUR). All financial accounts and statements shall be expressed in EUR.
1.5 The first Grant Tranche, representing an advance payment, shall be in an amount not exceeding 30% of the approved Grant amount, excluding the contingency reserve and the expenditure verification costs (set out in Appendix A hereto). It shall be disbursed to the Partner Country following the signature of the Agreement, subject to all conditions precedent for disbursement set out in Article 2 below being fulfilled.
1.6 The amount of each subsequent Grant Tranche shall be determined according to the Current State of Progress of Works and the Projected State of Progress of Works, as presented by the Partner Country in the Progress Reports pursuant to Article 5.
1.7 Each of the subsequent Grant Tranches can be disbursed only after the Partner Country presents a Progress Report to the CEB, subject to compliance with Article 5 below, confirming that 70% of the funds already disbursed by CEB to the Partner Country have been disbursed in accordance with the provisions of the Framework Agreement and the Agreement.
1.8 It is expressly acknowledged and agreed that the CEB shall not be obliged to make any payment under and/or pursuant to this Agreement, except to the extent that an amount in respect of, and equal to, such payment is available in the RHP Fund account.
1.9 Pursuant to Article 3.3 (Completion Date) of the Framework Agreement the Completion Date with respect to the Sub-Project is estimated to be up to 17 months following the entry into force of the present Grant Agreement.
Article 2
CONDITIONS PRECEDENT FOR DISBURSEMENT
2.1 Pursuant to Article 3.2 (Conditions precedent for disbursement) of the Framework Agreement the conditions precedent for disbursement of the Grant are the following:
2.1.1 Prior to the disbursement of the first Grant Tranche:
– The Partner Country shall deliver a Legal opinion in the English language satisfactory to CEB covering the issues of capacity, power and authority of the Republic of Croatia to enter into the Framework Agreement and the Agreement and confirming that both Agreements constitute valid, binding and enforceable undertakings.
– The Partner Country’s Implementing Structure as defined in Articale 4 of the Framework Agreement and as further specified in Article 4 below has been established and is operational to the satisfaction of CEB in accordance with the criteria outlined in Appendix 3 to the Framework Agreement.
– Pursuant CEB’s Procurement Guidelines the Partner Country shall provide to CEB a procurement plan with respect to the Sub-Project approved by CEB.
– Pursuant to the Assembly of Donors’ decision of 11 October 2013, an 18 months’ time limit with respect to the period from the Assembly of Donors’ approval of a grant request for a sub-project and the first disbursement from the CEB to the Partner Country under the relevant Grant Agreement for such approved sub-project applies. Hence, should no disbursement have occurred under this Grant Agreement by 14 October 2017 (18 months from 14 April 2016), the Assembly of Donors, if it deems it appropriate, may (i) cancel a Grant approved in favour of this Sub-Project and (ii) re-allocate these funds in favour of other sub-projects.
2.1.2 Prior to the disbursement of any subsequent Grant Tranches:
– Prior to the disbursement of any subsequent Grant Tranches the Partner Country shall provide to the CEB information on the Grant implementation progress in the form of the Progress Report pursuant to Article 5 satisfactory to the CEB.
2.1.3 Prior to the disbursement of last Grant Tranche:
– Prior to the disbursement of the last Grant Tranche the Partner Country shall provide to the CEB in addition to the Progress Report an Expenditure Verification Report pursuant to Article 4.10.5 (Expenditure verification) of the Framework Agreement prepared by an external auditor whereby such auditor shall have been chosen and such Expenditure Verification Report shall have been prepared in accordance with the terms of reference set out in Appendix E (Terms of reference for an expenditure verification of a grant received from the RHP Fund) hereto, both satisfactory to the CEB.
Article 3
CONDITIONS FOR USE OF THE GRANT
3.1 The Partner Country acknowledges that this Agreement is subject to and incorporates by reference the terms and conditions of the Framework Agreement, including its Appendices, in full. In particular:
– Pursuant to Article 2 (Conditions for use of the Grant/CHP Support Grant) the Grant made available by CEB shall be used exclusively for the Sub-Project.
– The Grant shall not be used for financing non-eligible expenditure as outlined in Appendix F hereto.
– The Sub-Project shall be implemented in accordance with Article 2 (Conditions for use of the Grant/CHP Support Grant) and Article 4 (Country Housing Project undertakings) of the Framework Agreement.
– Pursuant to Article 7 (Consequences of failure to comply) of the Framework Agreement in the event of failure to comply with the provisions of Article 2 (Conditions for use of the Grant/CHP Support Grant) and Article 4 (Country Housing Project undertakings) of the Framework Agreement, CEB reserves the right to suspend, cancel or request immediate repayment of the Grant. Before such a claim is made, consultations shall be held between the Parties.
3.2 Allocation of Grant Tranches: Pursuant to Article 4.7.3 (Allocation of Grant Tranches) of the Framework Agreement (i) each Grant Tranche must be Allocated by the Partner Country to the component parts of the Sub-Project (identified by means of the Progress Reports as in the form set out in Appendix C hereto) within 12 months from its disbursement date (the «Allocation End Date») and (ii) any amount not so Allocated must be repaid to the RHP Fund account managed by CEB within 3 months from the Allocation End Date.
3.3 Latest date for implementation of works/supplies/services: Expenditure financed under this Grant Agreement must be incurred in the period from the entry into force of this Grant Agreement until and no later than 30 November 2017 («Latest date for implementation of works/supplies/services»), subject to further extension. The term ‘incurred’ means services rendered, supplies delivered or works carried out. For the avoidance of doubt, any expenditure incurred after 30 November 2017, if any, may only be financed under this Grant Agreement provided that the Latest date for implementation of works/supplies/services is extended beyond 30 November 2017.
3.4 Any balance remaining unspent upon the Completion Date of the Sub-Project or any repayment of the Grant in accordance with the Framework Agreement and the Agreement shall be deposited in EUR in the RHP Fund account within 6 months from the Completion Date, unless otherwise agreed. Such deposit into the RHP Fund account shall be made via the EUR account opened in the name of the Council of Europe Development Bank:
Account holder: Council of Europe Development Bank, Paris (SWIFT: CEFP FR PP)
IBAN: DE44 5007 0010 0928 7384 00
Bank’s name: DEUTSCHE BANK AG, Frankfurt
Bank’s address: Taunusanlage 12
D – 60325 Frankfurt am Main
SWIFT/BIC: DEUT DE FF
with indication for further credit in EUR on the «RHP Fund Account».
Article 4
IMPLEMENTING STRUCTURE OF THE SUB-PROJECT
4.1 Pursuant to Article 4.1.1 (Lead Institution) of the Framework Agreement the Partner Country has designated the State Office for Reconstruction and Housing as the Lead Institution with respect to the Country Housing Project and this Sub-Project thereunder.
4.2 Pursuant to Article 4.1.2 (Project Implementing Unit) of the Framework Agreement the Partner Country entrusts the implementation of the Sub-Project to the Project Implementation Unit situated within the State Office for Reconstruction and Housing (the «PIU») and the project reporting to be made to CEB to the State Office for Reconstruction and Housing.
In any event, the responsibility to comply with all obligations under the Agreement remains with the Partner Country.
4.3 If unforeseen increases in expenditures are expected or realised (whether due to inflationary factors, fluctuation in exchange rates, natural and human-made disasters or other unforeseen contingencies), the Partner Country shall duly inform CEB on a timely basis and proceed in accordance with Article 4.8 (Increased or revised cost of a sub-project under the Country Housing Project) of the Framework Agreement. In any event, pursuant to Article 4.8 (Increased or revised cost of a sub-project under the Country Housing Project) of the Framework Agreement CEB does not undertake to cover any expenses in excess of the aggregate amount of the Grant set out in Article 1 of the Agreement.
Article 5
PROGRESS REPORTS ON THE SUB-PROJECT
5.1 Progress Reports: Pursuant to Article 4.10.2 (Progress Reports on sub-projects/CHP Support) of the Framework Agreement the Partner Country through the Lead Institution, shall provide on a 4-monthly basis, with respect to the cut-off dates of 30 April, 31 August and 31 December of every year until the last disbursement request under this Grant Agreement (each such date, a «Cut-Off Date») on a date falling no later than 14 calendar days from the Cut-Off Date and if such date falls on a weekend or public holiday in the Partner Country then on the next following business day (each such date, a «Reporting Date») with the first Cut-Off Date under this Grant Agreement falling on 31 August 2016 and the first Reporting Date under this Grant Agreement falling on 15 September 2016, information to CEB on the Grant implementation progress in the framework of the Progress Reports.
In addition to the regular 4-monthly Progress Reports, the Partner Country shall also provide information to the CEB on the Grant implementation progress, in the form of the Progress Report, prior to any request for disbursement of Grant Tranches. If the timing of the submission of the request for disbursement coincides with the timing of the submission of the regular 4-monthly Progress Report, than the later shall suffice. These Progress Reports shall be deemed satisfactory by the CEB before any disbursement may be made.
Appendix C hereto is a template specifying the minimum information required by CEB for Progress Reports.
In any case, the Progress Reports shall address:
– detailed description of activities, including beneficiary selection and protection elements, carried out during the reporting period;
– progress in the achievement of results against a set of indicators;
– impact (economic, social and environmental) prospects;
– sustainability;
– state of Allocation of the Grant Tranches, which are disbursed to the Partner Country by CEB (cost committed);
– progress of the procurement related activities;
– incurred and disbursed expenditure and forecast for future expenditure expected to be incurred and disbursed for a determined period of time; and
– visibility actions.
Reporting on expenditure shall be expressed in EUR or, should payments be made in any other currency, reporting on expenditure shall be expressed in local currency and converted into EUR at the exchange rate of the date of conversion of the corresponding Grant Tranche into local currency.
5.2 Completion Report: Pursuant to Article 4.10.2 (Progress Reports on sub-projects/CHP Support) of the Framework Agreement the Completion Report, which shall be provided to CEB within three (3) months following the Completion Date under the Sub-Project, shall include an overall assessment of the performance of the Sub-Project against objectives, as well as an assessment of the use of the Grant. The Completion Report must be deemed satisfactory by the CEB.
Article 6
REPRESENTATIONS AND WARRANTIES
The Partner Country represents and warrants:
– that it is authorized to enter into the Agreement and it has given the signatory(ies) the authorization therefor, in accordance with the laws, decrees, regulations and other texts applicable to it;
– that the drawing up and execution of the Agreement does not contravene the laws, decrees, regulations and other texts applicable to it.
Article 7
NOTICES
7.1 Any notice to be given to either Party with respect to the Agreement shall be effectively given or sent by letter or facsimile to the Parties as addressed below. The address of either Party may be changed by notices in the manner set out in this provision.
7.2 Any notice to CEB shall be addressed to:
Council of Europe Development Bank
55, avenue Kléber
75116 Paris – France
Attention: Director, Directorate for Loans and Social Development (RHP)
Fax: +33 1 47 55 37 52
Email: ceb-RHP@coebank.org
Copy to: Director, Directorate for European Cooperation and Strategy
Fax: +33 1 47 55 71 55
Email: ceb-donor-relations@coebank.org
7.3 Any notice to the Partner Country shall be addressed to:
State Office for Reconstruction and Housing Care
Radnička 22, 10000 Zagreb, Croatia
Attention: Head of the State Office
Fax: + 385 1 61 84 707
Article 8
AMENDMENTS
8.1. This Agreement may be modified by written amendment entered into by CEB and the Partner Country.
Article 9
DISPUTE RESOLUTION
9.1 Any dispute arising out of or in connection with the Agreement, including its existence, validity, interpretation or termination shall be settled amicably between the Parties.
9.2 In default of amicable settlement, disputes shall be subject to arbitration in accordance with the terms of Article 11 (Dispute resolution) of the Framework Agreement.
Article 10
ENTRY INTO FORCE
10.1 The Agreement shall enter into force upon signature by the Parties.
Article 11
INTERPRETATION
11.1 The Partner Country acknowledges that this Agreement is subject to and incorporates by reference the terms and conditions of the Framework Agreement in full.
11.2 In the event of discrepancies, inconsistencies and/or conflicts between the terms of the Framework Agreement and this Agreement, the documents shall prevail in the following order: (i) this Agreement; (ii) the Framework Agreement.
IN WITNESS WHEREOF, the undersigned, being duly authorized thereto, have signed the Agreement in the English language in two (2) originals.
Signed in Zagreb on 27 July 2016
FOR THE REPUBLIC OF CROATIA
Nikola Mažar
Head of State Office for Reconstruction and Housing Care
Signed in Paris on 18 July 2016
FOR THE COUNCIL OF EUROPE DEVELOPMENT BANK
Apolonio Ruiz Ligero
Vice – Govemor
Potprojekt br. HR6 (2016)
SPORAZUM O DODJELI BESPOVRATNIH SREDSTAVA IZMEĐU REPUBLIKE HRVATSKE I RAZVOJNE BANKE VIJEĆA EUROPE U VEZI S REGIONALNIM PROGRAMOM STAMBENOG ZBRINJAVANJA
Stranke ovog Sporazuma o dodjeli bespovratnih sredstava (u daljnjem tekstu: »Sporazum«) su REPUBLIKA HRVATSKA, preko Državnog ureda za obnovu i stambeno zbrinjavanje, Radnička 22, 10000 Zagreb, Hrvatska (»zemlja partner«) i RAZVOJNA BANKA VIJEĆA EUROPE, međunarodna organizacija sa sjedištem na adresi 55 avenue Kléber, 75116 Pariz, Francuska (»CEB« ili »Financijska institucija«, u daljnjem tekstu zajednički navedeno kao »stranke«, a svaka za sebe »stranka«).
BUDUĆI DA
(A) su CEB i zemlja partner sklopile Okvirni sporazum u vezi s Regionalnim programom stambenog zbrinjavanja, koji je potpisan 3. prosinca 2013. i potvrđen od strane Hrvatskoga sabora 4. travnja 2014. (s referentnim brojevima KLASA: 022-03/14-01/44 i URBROJ: 65-14-02. dodijeljeni od strane zemlje partnera) koji je, slijedom obavijesti koju je CEB zaprimila od zemlje partnera, sukladno članku 14. predmetnog Okvirnog sporazuma, stupio na snagu 1. lipnja 2014. (»Okvirni sporazum«).
(B) Skupština donatora odobrila je 14. travnja 2016. investicijsku potporu u obliku bespovratnih sredstva zemlji partner iz sredstava Fonda RPSZ-a, kao što je dalje opisano u članku 1. (»bespovratna sredstva«) za financiranje potprojekta prema Programu stambenog zbrinjavanja zemlje partner pod nazivom »Obnova, rekonstrukcija ili izgradnja 62 obiteljske kuće«, dodatno opisanog u Prilogu A (»potprojekt«).
(C) Zemlja partner dala je potpunu suglasnost za dodjelu bespovratnih sredstava i provedbu potprojekta.
(D) Stranke su odlučile sklopiti Sporazum kako bi odredile odredbe i uvjete koji se odnose na (i) prijenos i korištenje bespovratnih sredstava; i (ii) provedbu potprojekta.
STOGA su se stranke ovime sporazumjele kako slijedi:
DEFINICIJE
U ovom Sporazumu određeni pojmovi i izrazi imaju isto značenje onome koje im je dano u Okvirnom sporazumu te će sljedeći definirani pojmovi i izrazi imati sljedeće značenje, osim ako kontekst zahtijeva drugačije.
»Krajnji korisnici« znači krajnje korisnike potprojekta, kako je određeno u Prilogu A.
Članak 1.
BESPOVRATNA SREDSTVA
1.1. CEB, na način naveden u stavku 1.2. ovog članka, stavlja na raspolaganje zemlji partneru bespovratna sredstva u ukupnom iznosu do najviše 2.000.000 EUR, podložno stavku 1.8. ovog članka.
1.2. Podložno odredbama ovog Sporazuma te ispunjenjem svih uvjeta koji prethode isplati, utvrđenih u članku 2. niže, te po primitku propisno ispunjenog i potpisanog Zahtjeva za isplatu rata bespovratnih sredstava od strane zemlje partnera, u obrascu utvrđenom Prilogu B ovog Sporazumu (Zahtjev za isplatu rate bespovratnih sredstava (Predložak)). CEB polaže bespovratna sredstva u najmanje dvije (2) rate bespovratnih sredstava na Poseban račun (kao što je određeno u članku 3.4. (Poseban račun) Okvirnog sporazuma:
Nositelj računa: Ministarstvo financija
IBAN: HR52 1001 0051 5100 0014 4
Svrha: Regionalni program stambenog zbrinjavanja
Naziv banke: Hrvatska narodna banka
Adresa banke: Trg hrvatskih velikana 3,
HR – 10002 Zagreb, Hrvatska
SWIFT BIC: NBHRHR2X
1.3. Svaka pozitivna kamata ostvarena iz stanja sredstva s Posebnog računu će se koristiti isključivo za financiranje potprojekta u okviru gore navedenog Sporazuma, a svaku negativnu kamatu na stanju Posebnog računu snosit će zemlja partner.
1.4. Bespovratna sredstva isplatit će se u eurima (EUR). Svi financijski računi i izvješća bit će izraženi u eurima.
1.5. Prva rata bespovratnih sredstava, koja predstavlja predujam, iznosit će najviše 30% odobrenog iznosa bespovratnih sredstava, isključujući sredstva iz dodatne uz pričuve i troškove verifikacije (prikazano u Prilogu A ovog Sporazuma). Ona će biti isplaćena zemlji partneru nakon potpisivanja Sporazuma, podložno ispunjenju svih uvjeta koji prethode isplati utvrđeno u članku 2. ovog Sporazuma.
1.6. Iznos svake sljedeće rate bespovratnih sredstava određuje se sukladno trenutnom stanju radova i predviđenom razvoju radova, u skladu s navodima zemlje partner u Izvješćima o napretku sukladno članku 5.
1.7. Svaka od sljedećih rata bespovratnih sredstava može biti isplaćena tek nakon što zemlja partner dostavi Izvještaj o napretku CEB-u, podložno usklađenosti s člankom 5., potvrđujući da je 70% već isplaćenih sredstava od strane CEB-a prema zemlji partneru potrošeno u skladu s odredbama Okvirnog sporazuma i Sporazuma.
1.8. Izričito je obznanjeno i dogovoreno da CEB nije obvezan vršiti bilo kakva plaćanja u okviru i/ili u skladu s ovim Sporazumom, osim u slučaju ako se sredstva dostupna na računu RHP Fonda.
1.9. Sukladno članku 3.3. (Datum završetka) Okvirnog sporazuma, procjenjuje se da će datum završetka u odnosu na potprojekt biti unutar 17 mjeseci nakon stupanja na snagu ovog Sporazuma o dodjeli bespovratnih sredstava.
Članak 2.
PREDUVJETI ZA ISPLATU
2.1. Sukladno članku 3.2. (Uvjeti koji prethode isplati) Okvirnog sporazuma, uvjeti koji prethode isplati bespovratnih sredstava su sljedeći:
2.1.1. Prije isplate prve rate bespovratnih sredstava:
– Zemlja partner dostavlja pravno mišljenje na engleskom jeziku, zadovoljavajuće za CEB, koje obuhvaća sposobnosti, moći i ovlasti Republike Hrvatske za sklapanje Okvirnog sporazuma i ovog Sporazuma te kojim se potvrđuje da oba Sporazuma predstavljaju valjan, obvezujući te izvršiv pravni posao.
– Provedbena struktura zemlje partnera, kako je određeno u članku 4. Okvirnog sporazuma te kako je određeno u članku 4. niže, uspostavljena je zadovoljavajuće za CEB, u skladu s kriterijima navedenima u Dodatku 3. Okvirnog sporazuma.
– Temeljem Smjernica za nabavu CEB-a, zemlja partner mora dostaviti CEB-u plan nabave u odnosu na potprojekt koji je odobrio CEB.
– Temeljem Odluke Skupštine donatora, od 11. listopada 2013., određen je maksimalni rok od 18 mjeseci od kada Skupština donatora potvrdi bespovratna sredstva do realizacije prve isplate CEB-a zemlji partneru. Ukoliko se isplata za ovaj Sporazum o dodjeli bespovratnih sredstava ne izvrši do 14. listopada 2017. (18 mjeseci od 14. travnja 2016.), Skupština donatora, ukoliko će smatrati potrebnim, može (i) otkazati odobrena bespovratna sredstava za ovaj potprojekt i (ii) usmjeriti sredstva u korist nekog drugog potprojekata.
2.1.2. Prije isplate bilo koje sljedeće rate bespovratnih sredstava:
– Prije isplate bilo koje sljedeće rate bespovratnih sredstava, zemlja partner mora dostaviti CEB-u informacije o napretku provedbe bespovratnih sredstava u obliku Izvješća o napretku sukladno članku 5., zadovoljavajućim za CEB.
2.1.3. Prije isplate posljednje rate bespovratnih sredstava:
– Prije isplate posljednje rate bespovratnih sredstava, zemlja partner će CEB-u, pored Izvješća o napretku, dostaviti Izvješće o verifikaciji troškova sukladno članku 4.10.5. Okvirnog sporazuma (Verifikacija troškova), pripremljen od strane vanjskog revizora koji će biti odabran te će Izvješće o verifikaciji troškova biti izrađeno u skladu sa Opisom poslova utvrđenih iz Priloga E (Opis poslova za verifikaciju troškova bespovratnih sredstava iz Fonda RPSZ-a), oba zadovoljavajuća za CEB.
Članak 3.
UVJETI ZA KORIŠTENJE BESPOVRATNIH SREDSTAVA
3.1. Zemlja partner potvrđuje da Sporazum u potpunosti podliježe odredbama i uvjetima Okvirnog sporazuma te uključuje odredbe i uvjete Okvirnog sporazuma i njegovih dodataka, u cijelosti. Posebice:
– sukladno članku 2. (Uvjeti korištenja bespovratnih sredstava/Potpore NPSZ), bespovratna sredstva koja dodjeli CEB će se koristiti isključivo za potprojekt.
– Bespovratna sredstva se ne smiju koristiti za financiranje neprihvatljivih troškova kao što je navedeno u Dodatku F ovog Sporazuma.
– Potprojekt će se provoditi u skladu s člankom 2. (Uvjeti korištenja bespovratnih sredstava/ Potpore NPSZ) i člankom 4. (Obveze u okviru Nacionalnog programa stambenog zbrinjavanja) Okvirnog sporazuma.
– Sukladno članku 7. (Posljedice neispunjavanja uvjeta) Okvirnog sporazuma, u slučaju nepoštivanja odredaba članka 2. Okvirnog sporazuma (Uvjeti korištenja bespovratnih sredstava/ Potpore NPSZ) i članka 4. Okvirnog sporazuma (Obveze Nacionalnog projekta stambenog zbrinjavanja), CEB zadržava pravo obustave, otkaza ili zahtijevanja hitnog povratka bespovratnih sredstva. Prije postavljanja takvog zahtjeva, stranke će se međusobno konzultirati.
3.2. Dodjela rate bespovratnih sredstava: Sukladno članku 4.7.3. Okvirnog sporazuma (Dodjela rate bespovratnih sredstava) (i) svaku ratu bespovratnih sredstava zemlja partner mora dodijeliti sastavnim dijelovima potprojekta (utvrđenih pomoću Izvješća o napretku kao u Obrascu C) u roku od 12 mjeseci od datuma isplate (»Završetak dodjele«) i (ii) svaki iznos koji nije dodijeljen na taj način mora se vratiti na račun Fonda RPSZ-a kojim upravlja CEB, u roku od 3 mjeseca od krajnjeg roka za dodjelu.
3.3. Posljednji rok za provedbu radova/isporuku roba/pružanje usluga: Troškovi koji se financiraju temeljem ovog Sporazumom o dodjeli bespovratnih sredstava moraju nastati u razdoblju od stupanja na snagu ovog Sporazuma do 30. studenog 2017. (»Posljednji rok za provedbu radova/isporuku roba/pružanje usluga«), podložno daljnjem produljenju. Izraz ‘nastati’ znači pružene usluge, izvršene dostave ili izvedene radove. Kako bi se izbjegla bilo kakva dvojba, svi troškovi nastali nakon 30. studenog 2017. ako ih ima mogu se financirati u okviru ovog Sporazuma o dodjeli bespovratnih sredstava isključivo pod uvjetom da je zadnji datum za provedbu radova/isporuku roba/pružanje usluga produžen iza 30. studenog 2017.
3.4. Svaki iznos koji ne bude potrošen do Datuma završetka potprojekta ili svaki povrat bespovratnih sredstava u skladu s Okvirnim sporazumom i ovim Sporazumom bit će položen u eurima na račun Fonda RPSZ-a, u roku od 6 mjeseci od Datuma završetka, osim ako je drugačije ugovoreno. Takav polog na račun Fonda RPSZ-a, bit će izvršen putem računa u eurima otvorenog u ime Razvojne banke Vijeća Europe:
Nositelj računa: Razvojna banka Vijeća Europe, Pariz (SWIFT: CEFP FR PP)
IBAN: DE44 5007 0010 0928 7384 00
Naziv banke: DEUTSCHE BANK AG, Frankfurt
Adresa banke: Taunusanlage 12
D – 60325 Frankfurt am Main
SWIFT/BIC: DEUT DE FF
s naznakom za daljnji kredit u eurima na »Račun Fonda RPSZ-a,«.
Članak 4.
PROVEDBENA STRUKTURA POTPROJEKTA
4.1. Sukladno članku 4.1.1. (Vodeća institucija) Okvirnog sporazuma, zemlja partner je imenovala Državni ured za obnovu i stambeno zbrinjavanje kao vodeću instituciju u svezi s provedbom Nacionalnog projekta stambenog zbrinjavanja i potprojekta koji proizlazi iz tog Programa.
4.2. Sukladno članku 4.1.2. (Jedinica za provedbu projekta) Okvirnog sporazuma, zemlja partner zadaću projektnog izvješćivanja povjerava Državnom uredu za obnovu i stambeno zbrinjavanje, a provedbu potprojekta Jedinici za provedbu projekta (»JPP«) unutar Državnog ureda za obnovu i stambeno zbrinjavanje
U svakom slučaju, odgovornost za usklađenost sa svim obvezama prema Sporazumu ostaje na zemlji partneru.
4.3. Ako se očekuju ili ako se pojavi nepredviđen porast troškova (uslijed inflacijskih čimbenika, fluktuacije deviznih tečajeva, katastrofama izazvanim prirodnim i ljudskim faktorima), zemlja partner mora o tome propisno i pravovremeno obavijestiti CEB i postupiti u skladu s člankom 4.8. (Povećani ili izmijenjeni troškovi potprojekta u okviru Nacionalnog projekta stambenog zbrinjavanja) Okvirnog sporazuma. U svakom slučaju, sukladno članku 4.8. (Povećani ili izmijenjeni troškovi potprojekta u okviru Nacionalnog projekta stambenog zbrinjavanja) Okvirnog sporazuma, CEB se ne obavezuje pokriti troškove u iznosu koji premašuje ukupan iznos bespovratnih sredstava utvrđen u članku 1. ovog Sporazuma.
Članak 5.
IZVJEŠTAJI O NAPRETKU
POTPROJEKTA
5.1. Izvještaji o napretku: Sukladno članku 4.10.2. (Izvješća o napretku potprojekata/Potpore NPSZ-u) Okvirnog sporazuma, zemlja partner će putem vodeće institucije osigurati četveromjesečno izvještavanje, koje će uključivati razdoblja zaključno sa 30. travnja, 31. kolovoza i 31. prosinca svake godine, do posljednjeg zahtjeva za isplatu temeljem ovog Sporazuma o dodjeli bespovratnih sredstava (svaki takav datum »Zaključni datum«), te će se Izvješća podnositi najkasnije 14 kalendarskih dana od Zaključnog datuma, a ako taj datum pada u dane vikenda ili državnog blagdana važećima u zemlji partneru, tada prvog sljedećeg radnog dana (svaki takav datum: »Datum izvještavanja«). Prvi Zaključni datum u okviru Sporazuma o dodjeli bespovratnih sredstava bit će 31. kolovoza 2016., te će sukladno tome prvi datum izvještavanja prema ovom Sporazumu o dodjeli bespovratnih sredstava biti 15. rujna 2016.
Uz redovna četveromjesečna Izvješća o napretku, zemlja partner će također dostavljati informacije CEB-u o tijeku provedbe bespovratnih sredstava, u okviru Izvješća o napretku, prije svakog zahtjeva za isplatu rate bespovratnih sredstava. Ako se vrijeme podnošenja zahtjeva za isplatu podudara s rokom za predaju redovnog četveromjesečnog Izvješća o napretku, tada će potonje biti dostatno. Prije bilo koje isplate, CEB mora Izvješća o napretku smatrati zadovoljavajućim.
Dodatak C ovom Sporazumu je predložak, koji određuje minimalne podatke koje zahtjeva CEB u odnosu na Izvješće o napretku.
U svakom slučaju, u Izvješće o napretku će sadržavati:
– detaljan opis aktivnosti, uključujući odabir korisnika i elemente zaštite, provedene tijekom izvještajnog razdoblja;
– napredak u ostvarivanju dobrih rezultata unatoč nizu nepovoljnih pokazatelja;
– vrijednosti (ekonomskih, društvenih i ekoloških) utjecaja;
– održivost;
– stanje dodjele rate bespovratnih sredstava, koje CEB isplaćuje zemlji partneru (nastali trošak);
– napredak aktivnosti vezanih uz javnu nabavu;
– nastale troškove i prognozu buduće izdatke koji se očekuju da će nastati tijekom određenog vremenskog razdoblja; te
– aktivnosti vezane uz vidljivost.
Izvještavanje o troškovima mora biti izraženo u EUR ili, u slučaju da su uplate izvršene u nekoj drugoj valuti, o troškovima će se izvještavati u nacionalnoj valuti pretvaranjem odgovarajućih iznosa u euro prema tečaju na dan pretvaranja odgovarajuće rate bespovratnih sredstava u nacionalnu valutu.
5.2. Završno izvješće: Sukladno članku 4.10.2. (Izvješća o napretku potprojekata/ Potpore NPSZ-a) Okvirnog sporazuma, Završno izvješće, koje će biti dostavljeno CEB-u u roku od tri (3) mjeseca od datuma završetka prema Potprojektu, obuhvaćat će ukupnu ocjenu izvođenja potprojekta u odnosu na ostvarene ciljeve, kao i ocjenu uporabe bespovratnih sredstava. Završni izvještaj mora biti zadovoljavajući za CEB.
Članak 6.
IZJAVE I JAMSTVA
Zemlja partner izjavljuje i jamči:
– da je ovlaštena sklopiti ovaj Sporazum te da je potpisniku (potpisnicima) dala ovlaštenje za isto, u skladu sa zakonima, uredbama, propisima i drugim aktima koji se na njega primjenjivi;
– da izrada i izvršenje Sporazuma nisu u suprotnosti sa zakonima, uredbama, propisima ni drugim aktima koji su na njega primjenjivi.
Članak 7.OBAVIJESTI
7.1. Svaka obavijest koja se treba uputiti bilo kojoj stranci vezano za Sporazum biti će učinkovito pružena ili upućena pismom ili telefaksom na niže navedene adrese stranaka. Adresa svake stranke može biti izmijenjena putem obavijesti na način utvrđen ovom odredbom.
7.2. Svaka obavijest CEB-u upućuju se na sljedeću adresu:
Razvojna banka Vijeća Europe
55, avenue Kléber
75116 Pariz – Francuska
Na pažnju: Upravitelja, Uprave za zajmove i društveni razvoj (RPSZ)
Telefaks: +33 1 47 55 37 52
e-adresa: ceb-RHP@coebank.org
Preslika: Upravitelju, Uprava za europsku suradnju i strategiju
Telefaks: +33 1 47 55 71 55
E-adresa: ceb-donor-relations@coebank.org
7.3. Svaka obavijest Zemlji partner upućuje se na sljedeću adresu:
Držani ured za obnovu i stambeno zbrinjavanje
Radnička 22, 10000 Zagreb, Hrvatska
Na pažnju: Predstojnik Državnog ureda
Telefaks: + 385 1 61 84 707
Članak 8.
IZMJENE I DOPUNE
8.1. Ovaj Sporazum može biti izmijenjen pisanom izmjenom i dopunom sklopljenom između CEB-a i zemlje partner.
Članak 9.
RJEŠAVANJE SPOROVA
9.1. Svaki spor koji proizlazi iz ili je u vezi sa Sporazumom, uključujući njegovo postojanje, valjanost, tumačenje ili prestanak, rješava se mirnim putem između stranaka.
9.2. U slučaju neuspjelog mirnog rješenja spora, sporovi podliježu arbitraži u skladu s odredbama članka 11. (Rješavanje sporova) Okvirnog sporazuma.
Članak 10.
STUPANJE NA SNAGU
10.1. Sporazum stupa na snagu kada ga stranke potpišu.
Članak 11.
TUMAČENJE
11.1. Zemlja partner potvrđuje da ovaj Sporazum u cijelosti podliježe i uključuje, pozivajući se na njih, odredbe Okvirnog sporazuma.
11.2. U slučaju odstupanja, nedosljednosti i/ili sukoba između odredaba Okvirnog sporazuma i ovog Sporazuma, navedeni akti imaju prvenstvo sljedećim redoslijedom: (i) ovaj Sporazum; (ii) Okvirni sporazum.
U POTVRDU TOGA, niže potpisani, a za to propisano ovlašteni, potpisali su Sporazum na engleskom jeziku u dva (2) izvornika.
Potpisano u Zagrebu 27. srpnja 2016.
ZA REPUBLIKU HRVATSKU
Nikola Mažar, v. r.
predstojnik Državnog ureda za obnovu i stambeno zbrinjavanje
Potpisano u Parizu 18. srpnja 2016.
ZA RAZVOJNU BANKU VIJEĆA EUROPE
Apolonio Ruiz Ligero, v. r.
zamjenik guvernera
APPENDIX A
SUB-PROJECT DESCRIPTION