HRVATSKI SABOR
29
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU OKVIRNOG SPORAZUMA IZMEĐU REPUBLIKE HRVATSKE I RAZVOJNE BANKE VIJEĆA EUROPE U VEZI S REGIONALNIM PROGRAMOM STAMBENOG ZBRINJAVANJA
Proglašavam Zakon o potvrđivanju Okvirnog sporazuma između Republike Hrvatske i Razvojne banke Vijeća Europe u vezi s regionalnim programom stambenog zbrinjavanja, koji je Hrvatski sabor donio na sjednici 4. travnja 2014. godine.
Klasa: 011-01/14-01/81
Urbroj: 71-05-03/1-14-2
Zagreb, 10. travnja 2014.
Predsjednik
Republike Hrvatske
Ivo Josipović, v. r.
ZAKON
O POTVRĐIVANJU OKVIRNOG SPORAZUMA IZMEĐU REPUBLIKE HRVATSKE I RAZVOJNE BANKE VIJEĆA EUROPE U VEZI S REGIONALNIM PROGRAMOM STAMBENOG ZBRINJAVANJA
Članak 1.
Potvrđuje se Okvirni sporazum između Republike Hrvatske i Razvojne banke Vijeća Europe u vezi s Regionalnim programom stambenog zbrinjavanja, potpisan u Parizu 3. prosinca 2013. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Okvirnog sporazuma iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
FRAMEWORK AGREEMENT BETWEEN THE REPUBLIC OF
CROATIA AND THE COUNCIL OF EUROPE DEVELOPMENT BANK IN RELATION TO THE
REGIONAL HOUSING PROGRAMME
The REPUBLIC OF CROATIA through the Ministry of Finance, Katančićeva 5, 10000 Zagreb, Croatia (the «Partner Country»),
and
The COUNCIL OF EUROPE DEVELOPMENT BANK,
International Organisation, with its headquarters at 55 avenue Kléber,
75116 Paris, France («CEB»)
jointly referred to hereinafter as the «Parties», each a «Party»;
WHEREAS
(A) The ‘Joint Regional Programme on
Durable Solutions for Refugees and Displaced Persons’ (the «Regional
Housing Programme» or the «RHP») is a joint initiative of Bosnia and
Herzegovina, Republic of Croatia, Montenegro and Republic of Serbia
(each a «Partner Country» and together the «Partner Countries»).
(B) The aim of this regional initiative,
which is an integral part of the ‘Sarajevo Process on refugees and
displaced persons’ initiated in 2005, re-launched in March 2010 at the
Belgrade conference, and to which the Partner Countries have
re-committed themselves with the November 2011 Belgrade Declaration, is
to contribute towards resolving the protracted displacement situation of
the most vulnerable refugees and displaced persons (DPs) following the
1991-1995 conflicts on the territory of former Yugoslavia, including
internally displaced persons (IDPs) in Montenegro from 1999, by, inter
alia, providing them with durable housing solutions.
(C) The RHP aims to benefit close to 74,000
people or 27,000 households and its cost is estimated to be
approximately €584 million over a five-year period. It shall comprise
four country housing projects, one in each Partner Country each of which
shall be implemented by the relevant Partner Country in several
sub-projects and in several phases (each a «Country Housing Project» or a
«CHP»).
(D) The CEB was established on 16 April
1956 by the adoption of its Articles of Agreement, as amended, (the
«Articles of Agreement») by the Committee of Ministers of the Council of
Europe, the decision-making body of the Council of Europe and has its
origins in a Partial Agreement originally entered into between eight
Council of Europe member states. The CEB is governed by the Third
Protocol to the General Agreement on Privileges and Immunities of the
Council of Europe of March 6, 1959 (the «Third Protocol»), by its
Articles of Agreement and by regulations issued pursuant to the Articles
of Agreement.
(E) The participation of CEB to the RHP and
the establishment of a fund named ‘Regional Housing Programme Fund’ to
pool donor contributions of at least € 250,000 (the «RHP Fund») were
approved on 27 January 2012 by the CEB’s administrative council by
Resolution 1543(2012).
(F) CEB accepted to administer the RHP Fund
in accordance with the General Conditions of the RHP Fund which were
accepted by the Donors by way of adherence agreement entered into
between CEB and each Donor, respectively, as amended from time to time
(the «General Conditions»). CEB’s role in respect of the RHP is that of
RHP Secretariat, Fund Manager and Finance Institution and as further
detailed in the General Conditions.
(G) In its capacity of Finance Institution,
CEB, inter alia, shall disburse investment subsidy grants from the RHP
Fund resources to the Partner Countries for financing any sub-project
under the Country Housing Projects that fulfils certain eligibility
criteria as detailed in the General Conditions upon the decision of the
Assembly of Donors («Grants») and in connection with any Grants may
disburse loans from its own resources to the Partner Countries for
financing the same sub-project under the Country Housing Projects that
meets all of CEB’s conditions for financing upon the decision of CEB’s
administrative council («Loans»).
(H) The European Union, represented by the
European Commission, and the CEB shall enter into a bilateral
contribution agreement in relation to the RHP which may stipulate, inter
alia, that the CEB shall administer certain EU funds for the benefit of
certain activities under the RHP in accordance with the contribution
agreement, as amended from time to time (the «EU Contribution
Agreement»).
(I) Pursuant to the EU Contribution
Agreement, CEB, in its capacity of Finance Institution, shall, inter
alia, establish and support the implementation of each Country Housing
Project and shall thus provide to the Partner Country from EU funds (i)
technical assistance support to the Implementing Structure of the
Partner Country and / or (ii) financial support to co-fund the operating
expenses of the Implementing Structure and / or (iii) financial support
to co-fund the operation of the Regional Coordination Office as further
described in Article 1 under paragraph 1.2 below (the «CHP Support»).
(J) The Parties have decided to conclude
the present Framework Agreement (the «Agreement») to set out the terms
and conditions applicable to (i) any Grants and (ii) any CHP Support.
NOW THEREFORE the Parties hereby agree as follows:
Definitions
In this Agreement the following defined terms and
expressions shall bear the following meaning, unless the context
requires otherwise:
«Allocation of a Tranche»
(hereinafter also «Allocation» or «Allocated») means the commitment of a
Tranche by the Partner Country to the component parts of the
sub-project under the Country Housing Project (identified by means of a
standard table appended to any Grant Agreement) even if such Tranche has
not yet been paid out by the Partner Country for the sub-project under
the Country Housing Project.
«Assembly of Donors»
means the assembly of donors of the RHP Fund comprising one
representative of each Donor and CEB in its capacity as the Fund
Manager.
«CEB’s Environmental Policy» means the CEB’s Environmental policy as amended from time to time and as publically available on its website: www.coebank.org.
«CEB’s Loan Regulations»
means the CEB’s ‘Loan regulations’ which are comprised in CEB’s Policy
for Loan and Project Financing as amended from time to time and as
publically available on its website: www.coebank.org.
«CEB’s Policy for Loan and Project Financing» means
the CEB’s Overall policy framework for loan and project financing, as
amended from time to time and as publically available on its website:
www.coebank.org.
«CEB’s Procurement Guidelines»
means the CEB’s ‘Guidelines for Procurement of supplies, works and
services’, as amended from time to time, as publically available on its
website: www.coebank.org.
«CHP Support Grant»
means any grant the CEB provides to the Partner Country from EU funds in
the form of financial support (i) to fund technical assistance to the
Implementing Structure of the Partner Country and / or (ii) to co-fund
the operating expenses of the Implementing Structure and / or (iii) to
co-fund the operation of the Regional Coordination Office, subject to
the terms and conditions of the EU Contribution Agreement and as
documented by a CHP Support Grant Agreement.
«CHP Support Grant Agreement/s»
means the grant agreement/s which document/s any CHP Support Grant to
be entered into between the Parties, subject to the terms and conditions
of the EU Contribution Agreement and substantially in the form appended
hereto in Appendix 5.
«Completion Report»
means the completion report on any of the sub-projects under the Country
Housing Project as further described in 0 under paragraph 4.10.2 below.
«Current State of Progress of Works»
means the progress in terms of physical advancement of works compared
to the original work plan and the ratio of incurred eligible expenditure
to total eligible cost of the sub-project under the Country Housing
Project.
«Donor/s» means any state and / or institution that has made a minimum contribution of € 250,000 to the RHP Fund;
«Feasibility Report»
means a country-specific feasibility report prepared by the Partner
Country and approved by CEB and the European Commission which indicates
in detail the institutional structures for the implementation of the
respective CHP; specify implementation mechanisms and procedures and
detail the general scope, quantities, costs and schedules.
«Finance Institution»
means the CEB in its capacity as the finance institution where it (i)
shall appraise Grant Requests and/or Loan Requests, (ii) shall disburse
Grants to the Partner Countries, (iii) may provide Loans, subject to all
CEB’s conditions for financing being met and (iv) shall monitor the
implementation of sub-projects under the Country Housing Projects
partially financed by either Grants and Loans or Grants;
«Final Report» means the final report on the Country Housing Project as further described in 0 under paragraph 0 below.
«Framework Loan Agreement/s»
means the framework loan agreement/s which specifies/specify the Loan
made available to the Partner Country for any sub-project under its
Country Housing Project to be entered into between the Parties upon the
approval of a Loan Request by CEB’s administrative council.
«Grant Agreement/s»
means the grant agreement/s which specifies/specify the Grant made
available to the Partner Country for any sub-project under its Country
Housing Project to be entered into between the Parties following the
approval of a Grant Request by the Assembly of Donors, substantially in
the form appended hereto in Appendix 4.
«Grant Request Assessment Criteria»
means the grant request assessment criteria prepared by the Technical
Committee in consultation with the Partner Countries and approved by the
Assembly of Donors, as amended from time to time, and shared with the
Partner Countries.
«Grant Tranche» means an amount disbursed or to be disbursed from any Grant.
«Implementing Structure»
means the structure in the Partner Country that implements a
sub-project under the Country Housing Project as further described in
Article 4 below.
«Lead Institution»
means the Partner Country’s ministry or institution who, by delegation
of the Partner Country, has the overall responsibility for the
coordination and management of the Country
Housing Project and any sub-project thereunder as further described in Article 4 under paragraph 4.1.1 below.
«Loan Disbursement Agreement/s»
means the disbursement agreement/s which specifies/specify for each
Loan Tranche, the amount, the interest rate, the currency, the
disbursement date, the repayment period and each Party’s accounts for
remittance and shall be drawn up at the time of disbursement.
«Loan Tranche» means an amount disbursed or to be disbursed from any Loan.
«Progress Report» means
any of the progress reports on (i) the sub-projects under the Country
Housing Project and / or (ii) the CHP Support as further described in 0
under paragraph 4.10.2 below.
«Project Implementing Unit (PIU)»
means the Partner Country’s team in charge of the preparation, the
day-to-day implementation, physical and financial management and
follow-up of any sub-project under the Country Housing Project.
«Projected State of Progress of Works»
means the planned progress in terms of physical advancement of works
for a determined period of time and the ratio of eligible expenditure
expected to be incurred for a determined period of time to total
eligible cost of the sub-project under the Country Housing Project.
«Regional Coordination Forum» means the regional coordination forum coordinating the RHP activities among the Partner Countries.
«Regional Coordination Office»
or «RCO» means the structure to be established in one of the Partner
Countries with the aim to enhance regional cooperation in the framework
of the RHP implementation and to ensure that the regional aspects of the
RHP are adequately addressed.
«RHP Secretariat» means the CEB in its capacity as RHP secretariat as described in paragraph 3.5 of the General Conditions.
«Technical Committee»
means the technical committee of the RHP Fund comprising one
representative of the European Commission, each Donor and group of
Donors who has/have made one or more contributions to the RHP Fund
totalling €5,000,000 or in excess thereof and CEB in its capacity as the
RHP Secretariat.
Article 1.
FINANCING OF THE COUNTRY HOUSING PROJECT
This Agreement describes and governs (i) any Grant
and (ii) any CHP Support that CEB, in its capacity of Finance
Institution, may provide to the Partner Country.
1.1. Grant
If a Grant is requested by the Partner Country
(«Grant Request») and subsequently approved by the Assembly of Donors,
such Grant is made and shall be disbursed to the Partner Country by CEB,
in its capacity as Finance Institution, under the conditions set out in
this Agreement and the relevant Grant Agreement.
If a Loan is requested by the Partner Country in
connection with any sub-project under the Country Housing Project («Loan
Request») and subsequently approved by the CEB’s administrative
council, such Loan is made and shall be disbursed to the Partner Country
by CEB under the general conditions of CEB’s Loan Regulations and under the special conditions fixed by the relevant Framework Loan Agreement and any Loan Disbursement Agreement thereto.
1.2. CHP Support
Pursuant to the EU Contribution Agreement, CEB, in
its capacity of Finance Institution, shall, inter alia, support the
implementation of the Country Housing Project, including the
Implementing Structure as further described in 0, and shall thus
provide:
(i) technical assistance support to the Implementing Structure of the Partner Country, and / or
(ii) financial support to co-fund the operating expenses of the Implementing Structure of the Partner Country[, and / or
(iii) financial support to co-fund the operation of the Regional Coordination Office],
in each case subject to the terms and conditions of
the EU Contribution Agreement and with respect to item (iii) above also
subject to the terms of reference of the Regional Coordination Office
to be developed and agreed between the Partner Countries, the European
Commission on behalf of the EU and the CEB.
The terms of any such financial support shall be defined in a CHP Support Grant Agreement.
For the avoidance of doubt, the terms of any
technical assistance shall be defined either (i) in a CHP Support Grant
Agreement or (ii) in an agreement to be concluded by the CEB and the
relevant consultant, subject to the terms and conditions of the EU
Contribution Agreement. The Partner Country undertakes to accept the
technical assistance.
Article 2.
CONDITIONS FOR USE OF THE GRANT/CHP SUPPORT GRANT
Grants: Any Grants
shall be provided by the CEB in consideration of the commitment that the
Partner Country is making to apply such Grant/s solely to financing its
Country Housing Project as further described in Appendix 1 and each
sub-project thereunder as further described in the relevant Grant
Agreement and to carry out its Country Housing Project and each
sub-project thereunder. The Partner Country undertakes that should it,
after implementation of any sub-project under the Country Housing
Project, collect any revenues from any Grant it shall reinvest them in
the Country Housing Project, unless otherwise decided between the
Partner Country and the CEB.
In accordance with the General Conditions each
Country Housing Project and each sub-project thereunder shall be
implemented in accordance with (i) the General Conditions, (ii) CEB’s
rules and procedures, including in particular:
• CEB’s Procurement Guidelines;
• CEB’s Environmental Policy; and
• CEB’s Policy for Loan and Project Financing to the extent not indicated otherwise in the General Conditions,
and (iii) the Grant Request Assessment Criteria and
(iv) any terms and conditions specified by the Assembly of Donors as
reflected in the relevant Grant Agreement.
CHP Support Grants: Any
CHP Support Grants shall be provided by the CEB subject to (i) the EU
Contribution Agreement, (ii) CEB’s rules and procedures, including in
particular CEB’s Procurement Guidelines.
Article 3.
THE GRANT/CHP SUPPORT GRANT
3.1. Financial conditions
The amount of any Grant shall be detailed in a
Grant Agreement to be entered into between the Parties pursuant to this
Agreement upon the approval by the Assembly of Donors of any Grant
Request in respect of a sub-project under the Partner Country’s Country
Housing Project.
3.2. Conditions precedent for disbursement
The conditions precedent for disbursement of any
Grant, including, inter alia, (i) a Legal opinion in the English
language satisfactory to CEB covering the issues of capacity, power and
authority of the Republic of Croatia to enter the Agreement and the
relevant Grant Agreement and confirming that both Agreements constitute
valid, binding and enforceable undertakings, (ii) an operational
Implementing Structure as defined in Article 4 below has been
established and is operational to the satisfaction of CEB in accordance
with the criteria outlined in Appendix 3 hereto and (iii) a procurement
plan with respect to the relevant sub-project satisfactory to CEB, shall
be set out in the relevant Grant Agreement.
3.3. Completion Date
The Grant Agreement shall set out the sub-project
specific completion date by which under the relevant sub-project (i) all
the activities shall be completed and (ii) all of the Partner Country’s
payment obligations towards contractors engaged by the Partner Country
during the process of sub-project implementation shall be settled (the
«Completion Date»), subject to extension upon the CEB’s approval
following the Partner Country’s written and duly justified request.
3.4. Special Account
The Ministry of Finance shall open at the Croatian
National Bank a dedicated account for Regional Housing Programme to make
all deposits for all sub-projects that receive Grants on this account
and for deposit of all eventual CHP Support Grants. A unique code shall
be defined for each sub-project Grant and each CHP Support Grant by
which it would be possible to follow deposits and reimbursements for
each sub-project and each CHP Support Grant. Payments shall be made from
a Single Account of the Croatian State Budget. To provide analytical
monitoring of the funds, the State Office for Reconstruction and Housing
shall analytically guide all transactions through its records.
Article 4.
COUNTRY HOUSING PROJECT UNDERTAKINGS
4.1. Implementing Structure of the Country Housing Project
The Implementing Structure shall fulfil the criteria outlined in Appendix 3 hereto.
4.1.1. Lead Institution
The Partner Country designates the State Office for
Reconstruction and Housing as the Lead Institution with respect to the
Country Housing Project and any sub-project thereunder.
4.1.2. Project Implementing Unit (PIU)
The Partner Country shall establish and maintain an
appropriately staffed and equipped PIU for the implementation of any
sub-project under the Country Housing Project. The Partner Country
entrusts the implementation of the Country Housing Project to the
Project Implementation Unit situated within the State Office for
Reconstruction and Housing (the «PIU») and entrusts the project
reporting to be made to CEB to the State Office for Reconstruction and
Housing.
However, the responsibility to comply with all obligations under the Agreement remains with the Partner Country.
4.2. Integrity
4.2.1. Integrity Commitment
The Partner Country warrants and undertakes that no
person shall commit a corrupt, fraudulent, coercive or collusive
practice in connection with the implementation of its Country Housing
Project and any sub-project thereunder, including the procurement and
execution of contracts thereunder.
For the purposes of this Agreement:
– A «corrupt practice»
is the offering, giving, receiving, or soliciting, directly or
indirectly, anything of value to influence improperly the actions of
another party;
– A «fraudulent practice»
is any act or omission, including a misrepresentation, that knowingly
or recklessly misleads, or attempts to mislead, a party to obtain a
financial or other benefit, or to avoid an obligation;
– A «coercive practice»
is impairing or harming, or threatening to impair or harm, directly or
indirectly, any party or the property of the party to influence
improperly the actions of a party;
– A «collusive practice»
is an arrangement between two or more parties designed to achieve an
improper purpose, including influencing improperly the actions of
another party;
– The knowledge of any member of the Lead
Institution and PIU or the persons mentioned in 0 under paragraph 4.6
shall be deemed the knowledge of the Lead Institution and the PIU.
The Partner Country shall ensure that the Lead
Institution and the PIU institute, maintain and comply with internal
procedures and controls, in compliance with applicable national laws and
international best practices, for the purposes of avoiding that the
amount of any Grant under the Country Housing Project is used (i) with
the aim of money laundering or (ii) with the aim of financing of
terrorism, particularly, the Partner Country shall ensure that no
transaction is entered with, or for the benefit of, any of the
individuals or institutions named on the lists of sanctioned persons
promulgated by the United Nations Security Council or its committees
pursuant to Security Council Resolutions 1267 (1999), 1373 (2001)
(available at http:/www.un.org/terrorism), as updated from time to time,
and/or by the Council of the European Union pursuant to its Common
Positions 2001/931/CSFP and 2002/402/CSFP and their related or successor
resolutions and/or implementing acts in connection with financing of
terrorism matters.
The Partner Country shall ensure that the PIU and the Lead Institution undertakes:
– To inform CEB should it become aware of any alleged or suspected failure to comply with the above undertakings;
– To take such action as CEB may reasonably request
to investigate and/or terminate any alleged or suspected act or failure
to comply with the above undertakings;
– To facilitate any investigation that CEB may make
in relation to any such act or failure to comply with the above
undertakings; and
– To inform CEB of the measures taken to seek
damages from the persons responsible for any loss resulting from any
such act or failure to comply with the above undertakings.
4.3. Procurement
Pursuant to paragraph 3.9 of the General
Conditions, procurement of supplies, works and services to be financed
under the Country Housing Project and any sub-project thereunder shall
(i) be prepared, awarded and managed by the Partner Country; and (ii)
comply with the CEB’s Procurement Guidelines.
As provided under the CEB’s Procurement Guidelines,
contracts shall be procured in accordance with public procurement
legislation in force in the Partner Country. Contracts equal or above
the thresholds applicable in the Partner Country shall be procured
through international (open or restricted) procedures (requiring
publication in the Official Journal of the EU («OJEU»)).
In accordance with the CEB’s Procurement
Guidelines, the Procurement Plan indicating the procurement methods for
each contract shall be submitted to the CEB for approval prior to the
disbursement of the first Grant Tranche under any Grant Agreement.
In particular, the Partner Country shall submit to CEB for approval a Procurement Plan setting forth:
– contracts for supplies, works, and/or services
required to carry out any sub-project under its Country Housing Project
during the initial period of any sub-project of at least eighteen (18)
months;
– estimated cost of each contract;
– proposed procurement methods for each contract;
estimated launching date of each tender.
Upon receipt, the CEB shall inform the Partner
Country of the scope of review that CEB shall carry out (including
no-objection) for each contract envisaged under the Procurement Plan.
CEB shall not finance expenditures for goods, works
and services which have not been procured in accordance with the above
provisions. In such cases, CEB reserves the right to declare the
corresponding contract ineligible for financing with the Fund Resources.
In addition, if at any time CEB determines that procurement under any
sub-project under the Country Housing Project is not compliant with the
above provisions, it reserves the right to review and determine whether
such non-compliance gives rise to the suspension, cancellation or
immediate repayment of any Grant.
4.4. Environment
The Country Housing Project and each sub-project thereunder shall comply with the CEB’s Environmental Policy.
4.5. Human Rights
The implementation of the Country Housing Project
and each sub-project thereunder shall not lead to a violation of the
European Convention on Human Rights and of the European Social Charter.
4.6. Contact
Unless the Partner Country shall otherwise specify
in writing to CEB, the Head of the Lead Institution shall be responsible
for contacts with CEB for the purposes of 0 under paragraphs 4.2, 4.3,
4.4 and 4.5 above.
4.7. Use of the Grant
4.7.1. Eligible costs
The Grant Tranches must be allocated by the Partner
Country to cover costs of any sub-project under its Country Housing
Project that are (i) listed in paragraph 1.3(d) of the General
Conditions and (ii) in accordance with the provisions of the relevant
Grant Agreement.
4.7.2. Rules on taxes, customs duties and other levies having equivalent effect
The Partner Country undertakes to apply to
contractors paid out of Grants, CHP Support Grants or with CHP Support
(«RHP contractors») the same rules on taxes, customs duties or other
levies having equivalent effect arising for «EC contractors» from the
relevant framework agreement between the Partner Country and the
European Union on the Instrument for Pre-Accession Assistance (IPA) (the
«IPA Framework Agreement»).
For the avoidance of doubt, the same rules shall
apply to contractors when paid out of co-financing from the Partner
Country or Loans granted by CEB.
Before the disbursement of Grants or CHP Support
Grants or before the implementation of CHP Support, the Partner Country
shall take if necessary relevant measures (i) to apply the above
provisions (including the adaptation of the legislation implementing the
IPA Framework Agreement or the introduction of specific legislation)
and (ii) to ensure that adequate procedures (including to benefit from
any applicable tax/duty exemptions) are in place.
4.7.3. Allocation of Grant Tranches
The Grant Agreement shall set out (i) within which
period after each disbursement Grant Tranches must be Allocated by the
Partner Country to the component parts of the sub-project under the
Country Housing Project and (ii) within which period any amount not so
Allocated must be repaid to the RHP Fund account managed by CEB.
4.8. Increased or revised cost of a sub-project under the Country Housing Project
The Partner Country co-finances the sub-projects
under its Country Housing Project by allocating to the sub-projects
under its Country Housing Project its own financial and/or in-kind
contribution in an overall amount at least equal to the corresponding
own contribution specified in the «Budget» set out in Annex 2 to the
«Joint Regional Programme on Durable Solutions for Refugees and
Displaced Persons». For the avoidance of doubt, Grant Requests can be
approved by the Assembly of Donors, only if the available funding covers
the cost of the relevant sub-project.
Should the costs of a sub-project under the Country
Housing Project, as described in a Grant Agreement increase for
whatever reason, the Partner Country shall ensure that the additional
financial resources for the completion of such sub-project under the
Country Housing Project are available.
4.9. Donor, RHP and CEB visibility
The Partner Country shall incorporate in all its
promotional material related to the Country Housing Project and each
sub-project thereunder a reference to the fact that it is financed by
the RHP Fund managed by the CEB. The Partner Country shall ensure that
information given to the press, the beneficiaries, and all related
publicity material, official notices, reports and publications, shall
acknowledge that the sub-project was financed by the RHP Fund and shall
display the RHP logo in an appropriate way. All visibility actions shall
comply with the RHP communication policy to be developed by the CEB and
approved by the Donors.
4.10. Information requirements
4.10.1. Information concerning any sub-project under the Country Housing Project
The Partner Country undertakes (i) to retain, in a
single location, for inspection during 6 (six) years from the conclusion
of each contract financed by means of any Grant or CHP Support Grant
the full terms of the contract itself, as well as all material documents
pertaining to the procurement process and to the execution of the
contract and (ii) to procure that CEB may inspect the contractual
documents that the contractor is obliged to retain under its supply
contract.
The Partner Country shall ensure the keeping of
accounting records concerning any sub-project under the Country Housing
Project or any project that receives CHP Support, which shall be in
conformity with international standards, showing, at any point, the
state of progress (i) of any sub-project under the Country Housing
Project or (ii) any project that receives CHP Support, and which shall
record all operations made, be backed by original supporting evidence
and identify the assets and services financed with the help of any Grant
or CHP Support Grant.
The Partner Country undertakes to respond within a
reasonable period to any request for information from the CEB and to
provide it with any documentation that the CEB should consider necessary
and may reasonably request, for the proper implementation of (i) the
Agreement and any Grant Agreement, particularly as concerns the
monitoring of any sub-project under the Country Housing Project and the
use of any Grant and (ii) the Agreement and any CHP Support Grant
Agreement, particularly as concerns the use of any CHP Support Grant.
The Partner Country shall inform the CEB
immediately of any legislative or regulatory change in the economic
sector relevant to the Country Housing Project, and, in a general sense,
of any event which may have a material adverse impact on the execution
of its obligations under this Agreement and any Grant Agreement or any
CHP Support Grant Agreement. Any event or the failure to inform the CEB
thereof may give rise to the suspension, cancellation or immediate
repayment of any Grant or any CHP Support Grant. Before such a claim is
made, consultations shall be held between the Parties.
4.10.2. Progress Reports on sub-projects / CHP Support
Progress Reports: The
Partner Country shall provide to the CEB regular information on the
progress of the sub-projects and on the use of the CHP Support in the
form of Progress Reports. The Grant Agreement shall set out in which
frequency and when the Partner Country shall send to the CEB a Progress
Report commencing from the signature of any Grant Agreement until the
Completion Date of the entire sub-project under the Country Housing
Project.
The CHP Support Grant Agreement shall set out in
which frequency and when the Partner Country shall send to the CEB a
Progress Report whereby the reporting frequency and dates under the CHP
Support Grant Agreement/s shall be the same as the reporting frequency
and dates under the Grant Agreement/s. On any reporting date the Partner
Country shall provide to the CEB one collective Progress Report on (i)
the progress of all the sub-projects under the Country Housing Project
in respect of which Grant/s have been disbursed by that reporting date
and (ii) the use of all the CHP Support that has been disbursed by that
reporting date.
The Partner Country shall also send a Progress
Report prior to any disbursement request. These Progress Reports must be
deemed satisfactory by the CEB before any disbursements may be made.
Any Grant Agreement shall provide the template
specifying the minimum information required by CEB for Progress Reports
on sub-projects and any CHP Support Grant Agreement shall provide the
template specifying the minimum information required by CEB for Progress
Reports on CHP Support.
Completion Report: Any
Grant Agreement shall contain an obligation on the Partner Country to
present a Completion Report to CEB which shall include an overall
assessment of the performance of the sub-project against objectives, as
well as an assessment of the use of the Grant.
Any CHP Support Grant Agreement shall contain an
obligation on the Partner Country to present a Completion Report to CEB
which shall include an assessment of the use of the CHP Support Grant.
Any of these Completion Reports must be deemed satisfactory by the CEB.
4.10.3. Country Housing Project Final Report
Upon physical completion of the entire Country
Housing Project, the Partner Country shall present a Final Report, for
the avoidance of doubt, reporting on the entirety of all sub-projects
under the Country Housing Project that received a Grant from the RHP
Fund, to CEB containing an appraisal of the Country Housing Project’s
economic, financial, social and environmental effects. This Final Report
must be deemed satisfactory by the CEB.
4.10.4. Monitoring missions
The Partner Country undertakes to favourably
receive any monitoring missions carried out by employees of (i) the CEB
and (ii) any of the Donors whose Contribution to the RHP Fund benefits
the Republic of Croatia’s Country Housing Project, in particular the
European Union, or (iii) outside consultants hired by the CEB, and to
provide all the necessary co-operation for their monitoring missions, by
facilitating any possible visits to the site of the sub-project under
the Country Housing Project.
4.10.5. Expenditure verification
The Partner Country undertakes to provide to the
CEB, prior to the disbursement of the last Grant Tranche under any Grant
Agreement, an expenditure verification report provided by an external
auditor whereby such auditor shall have been chosen and such report
shall have been prepared in accordance with the terms of reference set
out in Appendix F to each Grant Agreement (each such report, an
«Expenditure Verification Report») satisfactory to the CEB. Any
Expenditure Verification Report shall be produced by an external auditor
contracted by the Partner Country in compliance with CEB’s Procurement
Guidelines and subject to CEB’s ex-ante approval.
4.10.6. Audit
Grants: The Partner Country undertakes to
favourably receive any audit carried out by employees of (i) the CEB and
(ii) any of the Donors whose Contribution to the RHP Fund benefits the
Republic of Croatia’s Country Housing Project, in particular the
European Union, including its Court of Auditors, or (iii) external
auditors employed by the CEB, and to provide all the necessary
co-operation for their audit, by facilitating any possible visits to the
site of the sub-project under the Country Housing Project. In
particular, the CEB and any of the Donors whose Contribution to the RHP
Fund benefits the Republic of Croatia’s Country Housing Project, in
particular the European Union, including its Court of Auditors, the EU
Anti-Fraud Office (OLAF), the European Commission and any other
competent EU body, may have an on-site audit of the sub-project under
the Country Housing Project carried out by one or more consultants of
its choice, including in the case of default by the Partner Country in
respect of any of its obligations under this Agreement.
CHP Support Grants: The
Partner Country undertakes to favourably receive any audit carried out
by employees of the CEB and the European Union, including its Court of
Auditors, the EU Anti-Fraud Office (OLAF), the European Commission and
any other competent EU body, or external auditors employed by the CEB,
and to provide all the necessary co-operation for their audit.
4.10.7. Mid-term review and final evaluation of the Country Housing Project
The Partner Country undertakes to favourably
receive any missions carried out by outside consultants hired by the CEB
who, pursuant to paragraph 3.9 of the General Conditions, are mandated
to carry out (i) a mid-term review of the Country Housing Project should
the Assembly of Donors so decide at mid-term of the Country Housing
Project and (ii) a final evaluation of the Country Housing Project’s
results at the completion of the Country Housing Project, whereby, for
the avoidance of doubt, the entirety of all sub-projects under the
Country Housing Project that received a Grant from the RHP Fund would be
the subject of (i) a mid-term review and/or (ii) a final evaluation, as
the case may be.
Article 5.
DISCHARGE OF THE PARTNER COUNTRY’S OBLIGATIONS
With respect to any Grant upon:
– disbursement by CEB of the full Grant in accordance with the Grant Agreement; and
– full utilisation of the Grant, or eventual refund
to the RHP Fund account of any balance remaining unspent on the
Completion Date of any sub-project under the Country Housing Project;
and
– presentation of a Completion Report on the
relevant sub-project (as defined under the Grant Agreement) by the
Partner Country to CEB and CEB’s approval of such Completion Report in
accordance with the Grant Agreement; and
With respect to the last Grant upon:
– presentation of (i) a Completion Report on the
last sub-project (as defined under the last Grant Agreement) by the
Partner Country to CEB and CEB’s approval of such Completion Report in
accordance with the last Grant Agreement and (ii) a Final Report on the
entire Country Housing Project, for the avoidance of doubt, reporting on
the entirety of all sub-projects under the Country Housing Project that
received a Grant from the RHP Fund (as defined under the last Grant
Agreement) by the Partner Country to CEB and CEB’s approval of such
Final Report in accordance with the last Grant Agreement,
the Partner Country shall be fully released from
its obligations towards the CEB, with the exception of those set out in
Article 4 under paragraphs 4.10.1, 4.10.4 and 4.10.6 above for the
purposes of an evaluation of the Country Housing Project’s results as
set out in Article 4 under paragraph 4.10.7.
Article 6.
REPRESENTATIONS AND WARRANTIES
The Partner Country represents and warrants:
– that it is authorised to enter into the Agreement
and it has given the signatory(ies) the authorisation therefor, in
accordance with the laws, decrees, regulations and other texts
applicable to it;
– that the drawing up and execution of the
Agreement does not contravene the laws, decrees, regulations and other
texts applicable to it.
Article 7.
CONSEQUENCES OF FAILURE TO COMPLY
Grants: In the event of
(i) failure to comply with the conditions for the use of the Grant set
out in 0 above and/or (ii) any violation of the covenants set out in 0
under paragraphs 4.2, 4.3, 4.4 and 4.5 above, CEB reserves the right to
suspend, cancel or request immediate repayment of the Grant. Before such
a claim is made, consultations shall be held between the Parties.
Article 8.
RELATIONS WITH THIRD PARTIES
The Partner Country may not raise any fact
relating, within the scope of the use of any Grant or CHP Support Grant
to its relations with third parties in order to avoid fulfilling, either
totally or partially, the obligations resulting from the Agreement and
the Grant or the CHP Support Grant.
The CEB may not be involved in disputes which might
arise between the Partner Country and third parties and the costs,
whatever their nature, incurred by the CEB due to any claims, and in
particular all legal or court costs, shall be at the expense of the
Partner Country.
Article 9.
INTERPRETATION OF THE AGREEMENT
The headings of the paragraphs, sections, and
chapters of the Agreement shall not serve for its interpretation. In no
case shall it be presumed that the CEB has tacitly waived any right
granted to it by the Agreement.
With respect to any Grant or any CHP Support Grant,
as the case may be, where there is a contradiction between any
provision whatsoever of this Agreement, and any provision whatsoever of
the Grant Agreement or the CHP Support Grant Agreement, as the case may
be, the provision of the Grant Agreement or the CHP Support Grant
Agreement, as the case may be, shall prevail.
Article 10.
AMENDMENTS
This Agreement may be modified by written amendment entered into by CEB and the Partner Country.
Article 11.
DISPUTE RESOLUTION
Any dispute arising out of or in connection with
the Agreement, including its existence, validity, interpretation or
termination shall be settled amicably between the Parties.
In default of amicable settlement, disputes between
the Parties with respect to the Agreement in relation to any Grant or
any CHP Support Grant, as the case may be, shall be subject to
arbitration under the conditions laid down in Appendix 6 hereto.
For the purposes of Appendix 6, in the context of a
Grant or a CHP Support Grant, as the case may be, the following terms
shall be read as follows:
– «loans» shall be deleted and replaced by «Grants» or «CHP Support Grants», as the case may be;
– «loan agreement and, where applicable, the
guarantee agreement» and «loan contract or the guarantee contract» shall
be deleted and replaced by «Grant Agreement» or «CHP Support Grant
Agreement», as the case may be; and
– «the borrower» and «the borrower or the guarantor (if any)» shall be deleted and replaced by «the Partner Country».
Article 12.
EXECUTION OF AN ARBITRATION AWARD
The contracting Parties agree not to take advantage
of any privilege, immunity or legislation before any jurisdictional or
other authority, whether domestic or international, in order to object
to the enforcement of an award handed down under the conditions laid
down in Appendix 6 hereto.
Article 13.
NOTICES
Any notice or other communication to be given or
made under this Agreement to CEB or the Partner Country shall be in
writing and shall be deemed to have been duly given or made when it is
delivered by hand, airmail or facsimile by one Party to the other at
such Party’s address as specified below.
For the Partner Country:
State Office for Reconstruction and Housing
Radnička 22, 10 000 Zagreb
Croatia
Attention: Head of State Office
Fax: 00 385 1 6184-707
For the CEB:
Council of Europe Development Bank
55 avenue Kléber
75116 Paris, France
Attention: Directorate General for Loans and Social Development, Director RHP
Fax: +33.1.4755.3752
Email: ceb-RHP@coebank.org
All communications to be given or made, for the
avoidance of doubt including all Progress Reports, all Completion
Reports and the Final Report, shall be in English or French or, if in
another language, shall be accompanied by an English or French certified
translation thereof, when so required by the CEB.
Article 14.
ENTRY INTO FORCE
Following its signature by the CEB and the Partner
Country the Agreement shall enter into force on the first day of the
month following the date on which the Republic of Croatia has notified
CEB on the completion of internal procedures necessary for that purpose.
This Agreement shall be provisionally applied from the date of signature.
Article 15.
ORIGINALS OF THE AGREEMENT
The Agreement is drawn up in two originals in English, each of which is equally valid.
One original is kept by each of the contracting Parties.
IN WITNESS WHEREOF, the undersigned duly authorised thereto, have signed this Agreement,
Appendix 1: Description of the Country Housing Projects
under the Regional Housing Programme
JOINT REGIONAL PROGRAMME ON DURABLE SOLUTIONS
FOR REFUGEES AND DISPLACED PERSONS COUNTRY HOUSING PROJECT OF BOSNIA
AND HERZEGOVINA, MONTENEGRO, REPUBLIC OF CROATIA AND REPUBLIC OF SERBIA
As per the «Joint Regional Programme on Durable
Solutions for Refugees and Displaced Persons – Framework Programme’,
which is an integral part of the Joint Ministerial Declaration signed on
7 November 2011, the RHP aims to benefit close to 74,000 people or
27,000 households and its cost is estimated to be approximately €584
million over a five-year period. The RHP shall comprise four Country
Housing Projects, each of which shall be implemented by the relevant
Partner Country in several sub-projects and in several phases. Further
information on the CHPs, such as described in the «Joint Regional
Programme on Durable Solutions for Refugees and Displaced Persons –
Framework Programme», is provided in the tables below.
Table 1. Beneficiary population by category and country
*The RHP includes six categories of beneficiaries, namely:
• CATEGORY I includes all 1991-1995 refugees,
regardless of their status, who are residents of collective centers or
other forms of collective accommodations, either formal or informal
ones.
• CATEGORY II includes all 1991-1995 vulnerable
refugees, accommodated privately and all former occupancy right holders
without a durable solution in their country of origin or reception
country. For the purpose of the joint Programme, the vulnerability
criteria applied by UNHCR in regional countries are also to be used
here.
• CATEGORY III includes all vulnerable returnees to
Bosnia and Herzegovina and Croatia and all vulnerable returnees who
have already returned to Croatia but do not have a durable solution
whether in the country of origin or in the reception country.
• CATEGORY IV applies to displaced persons accommodated in collective centers and private accommodations in Croatia.
• CATEGORY V includes vulnerable displaced persons outside collective centers in Bosnia and Herzegovina.
• CATEGORY VI includes 1999 vulnerable displaced
persons in Montenegro. This was especially agreed by the participating
countries given that the joint Programme in other countries deals only
with 1991-1995 refugees.
Table 2. Indicative implementation timeframe and indicative funding sources

Appendix 2: General Conditions
GENERAL CONDITIONS OF THE REGIONAL HOUSING PROGRAMME FUND
WHEREAS
(A) The ‘Joint Regional Programme on
Durable Solutions for Refugees and Displaced Persons’ (the «Regional
Housing Programme» or the «RHP») is a joint initiative of Bosnia and
Herzegovina, Republic of Croatia, Montenegro and Republic of Serbia
(each a «Partner Country» and together the «Partner Countries»).
(B) The aim of this regional initiative,
which is an integral part of the ‘Sarajevo Process on refugees and
displaced persons’ initiated in 2005, re-launched in March 2010 at the
Belgrade conference, and to which the Partner Countries have
re-committed themselves with the November 2011 Belgrade Declaration, is
to contribute towards resolving the protracted displacement situation of
the most vulnerable refugees and displaced persons (DPs) following the
1991-1995 conflicts on the territory of former Yugoslavia, including
internally displaced persons (IDPs) in Montenegro from 1999, by, inter
alia, providing them with durable housing solutions.
(C) The RHP aims to benefit close to 74,000
people or 27,000 households and its cost is estimated to be
approximately €584 million over a five-year period. It will comprise
four country housing projects, one in each Partner Country each of which
will be implemented by the relevant Partner Country in several
sub-projects and in several phases (each a «Country Housing Project» or a
«CHP»).
(D) The regional initiative, as part of the
overall ‘Sarajevo process’, is endorsed by the international community,
including the European Union represented by the European Commission
(the «Commission»), the United States of America («USA»), the Council of
Europe Development Bank («CEB»), the United Nations High Commissioner
for Refugees («UNHCR») and the Organization for Security and
Co-operation in Europe («OSCE»).
(E) A donors’ conference took place in
Sarajevo on 24 April 2012 (the «Donors’ Conference») where the
Commission, the Governments of the USA, Germany, Italy, the Kingdom of
Norway, the Swiss Federation, the Kingdom of Denmark, Turkey,
Luxembourg, Cyprus, Czech Republic, Romania, Hungary, Slovak Republic
and the former United Nations High Commissioner for Refugees, Ms. Sadako
Ogata pledged contributions for the Regional Housing Programme in a
total of EUR 261 million.
(F) The CEB was established on 16 April
1956 by the adoption of its Articles of Agreement, as amended, (the
«Articles») by the Committee of Ministers of the Council of Europe, the
decision-making body of the Council of Europe and has its origins in a
Partial Agreement originally entered into between eight Council of
Europe member states. The CEB is governed by the Third Protocol to the
General Agreement on Privileges and Immunities of the Council of Europe
of March 6, 1959 (the «Protocol»), by its Articles and by regulations
issued pursuant to the Articles.
(G) The CEB is empowered under Article VII
Section 3 of the Articles to open and manage trust accounts and such
accounts may receive contributions from CEB, members of the CEB and of
the Council of Europe.
(H) The participation of CEB to the RHP and
the establishment of a fund named ‘Regional Housing Programme Fund’
(the «RHP Fund») were approved on 27 January 2012 by the CEB’s
Administrative Council by Resolution 1543(2012).
(I) By Resolution 399 (2012) of its
Governing Board of 30 March 2012 the CEB is authorised to receive
voluntary contributions from non-member states of the CEB and
international institutions in the framework of the Regional Housing
Programme.
(J) CEB’s role in respect of the RHP will
be that of RHP Secretariat, Fund Manager and Finance Institution as
further detailed herein.
(K) CEB’s management fee (as defined in
Paragraph 3.6 below) has been determined so as to cover, together with
the bilateral contributions the CEB receives from the Commission
directly, the total of CEB’s management costs in respect of the RHP
until the termination date (as defined in Paragraph 4.2(a) below).
ACCORDINGLY, the CEB accepted to administer the RHP Fund, in accordance with these General Conditions.
1. GENERAL PROVISIONS
1.1 Definitions
In these General Conditions the following defined
terms and expressions will bear the following meaning, unless the
context requires otherwise:
«Adherence Agreement»
means the agreement to be entered into between each Donor and the Fund
Manager, pursuant to which the parties to any such Adherence Agreement
agree that the General Conditions will govern the management of the RHP
Fund;
«Assembly of Donors» means the Assembly of Donors described in Paragraph 3.2 of these General Conditions;
«CEB Procurement Guidelines»
means the CEB’s ‘Guidelines for Procurement of supplies, works and
services’ as publically available on its website: www.coebank.org;
«CEB Public Information Policy» means CEB’s Public Information Policy as publically available on its website: www.coebank.org;
«Contribution/s» means
resources contributed to the RHP Fund, subject to the conclusion of a
Contribution Agreement and governed by the terms set out therein and as
described in Paragraph 2.2 of these General Conditions;
«Contribution Agreement»
means the written understanding or agreement to be entered into between
a Donor and the CEB, which will specify the amount committed by the
Donor, the currency of such Contribution, the date(s) on which and the
manner in which payments thereof will be made to the Fund Account and
may contain such other administrative matters as may be required and are
permitted by the General Conditions, and will be in the form attached
to the Adherence Agreement;
«Donor/s» means any state and / or institution that has made a Contribution to the RHP Fund;
«Donor Group» means group of Donors whose Contributions taken together amount to €5,000,000 or in excess thereof;
«Effective Date» means
the date on which the first Contribution has been received by the RHP
Fund as confirmed by the CEB to the Donors who as at such date have
entered into a Contribution Agreement.
«Euro», «€», «euro» and «EUR»
each means the lawful currency of the member states of the European
Union that adopt the single currency in accordance with the Treaty on
the Functioning of the European Union (TFEU);
«Finance Institution»
means the CEB in its capacity as the finance institution where it (i)
will appraise Grant Requests and/or Loan Requests, (ii) will disburse
Grants to the Partner Countries, (iii) may provide Loans, subject to all
CEB’s conditions for financing being met and (iv) will monitor the
implementation of sub-projects under the Country Housing Projects
financed by either Grants and Loans or Grants;
«Fund Account» means
the account/s and, to the extent applicable, the sub-account/s, opened
and maintained by the Fund Manager in CEB’s books, to which
Contributions will be transferred and out of which the Fund Manager will
disburse the Fund Resources, as required;
«Fund Manager» means the CEB in its capacity as fund manager as further described in Paragraph 0;
«Fund Resources» means the Contributions made to the RHP Fund and other amounts as described in Paragraph 2.1 of these General Conditions;
«General Conditions» means the general conditions of the RHP Fund set out herein;
«Grant/s» means
any investment subsidy grant to be disbursed by the Finance Institution
from the Fund Resources to the Partner Countries for any sub-project
under the Country Housing Projects that fulfils the Eligibility Criteria
set out in Paragraph 1.3 of these General Conditions upon the decision
of the Assembly of Donors;
«Grant Request» means any Partner Country’s request for a Grant;
«Grant Request Assessment Criteria» means the grant request assessment criteria, as described in Paragraph 1.3(f) of these General Conditions;
«Initial Contribution Minimum Amount» means the minimum amount of €250,000 in respect of the initial Contribution by each Donor;
«Loan» means a loan to
be disbursed upon the decision of the CEB by the CEB from its resources
to such Partner Country for financing any sub-project under the Country
Housing Projects;
«Loan Request» means
any Partner Country’s request for a loan to be disbursed upon the
decision of the CEB by the CEB from its resources to such Partner
Country for financing any sub-project under the Country Housing
Projects;
«Project Implementation Unit» or «PIU» means any unit which will implement sub-projects under any Country Housing Project;
«Regional Coordination Forum» means the regional coordination forum coordinating the RHP activities within the Partner Countries;
«RHP Secretariat» means the CEB in its capacity as RHP secretariat as described in Paragraph 3.5 of these General Conditions;
«RHP Steering Committee» means the RHP steering committee comprising the Partner Countries, UNHCR, OSCE, the Donors and the RHP Secretariat;
«Subsequent Contribution Minimum Amount» means the minimum amount of €250,000 in respect of each subsequent Contribution by each Donor;
«Technical Committee» means the technical committee, as described in Paragraph 0 of these General Conditions;
«U.S. dollars», «$» or «USD» are references to United States dollars.
1.2 Purpose of the RHP Fund
(a) The purpose of the RHP Fund is to allocate Fund Resources within the framework of the Regional Housing Programme as follows:
(i) for providing support in the form of Grants;
(ii) for such other activities as the Assembly of
Donors may approve, from time to time, on recommendation of the
Technical Committee,
(b) Grant Requests will be made by each Partner
Country via the RHP Secretariat and subject to assessment by the
Technical Committee after pre-assessment by the Finance Institution. The
allocation of Fund Resources for financing such sub-projects under the
Country Housing Projects will be subject to a decision to that effect,
taken by the Assembly of Donors in accordance with the decision-making
procedure set out in Paragraph 3.2(g).
(c) The Fund Resources will also be used to pay (i)
the Management Fee in accordance with Paragraph 3.5, (ii) the costs of
the audit of the financial statements of the RHP Fund in accordance with
Paragraph 3.8(b) and costs of recovery in accordance with Paragraph
3.4(c) of these General Conditions.
1.3 Eligibility Criteria of Grant Requests
To be eligible for the support by the RHP Fund,
Grant Requests will comply with the following eligibility criteria (the
«Eligibility Criteria»):
(a) Geographical coverage: The sub-projects under any of the Country Housing Projects must be implemented on the territory of the Partner Countries.
(b) Eligible beneficiaries:
The sub-projects under any of the Country Housing Projects must benefit
vulnerable refugees and/or displaced persons, including internally
displaced persons (IDPs) in Montenegro from 1999, within Partner
Countries who fit one of the following six categories (the «Eligible
Beneficiaries»):
(i) Category I: All 1991-1995 refugees, regardless
of their status, who are residents of collective centres or other forms
of collective accommodations, either formal or informal.
(ii) Category II: All 1991-1995 vulnerable refugees
accommodated privately and all former occupancy right holders without a
durable solution in their country of origin or reception country. For
the purpose of the Regional Housing Programme, the vulnerability
criteria applied by UNHCR in countries in the region are also to be
applied here.
(iii) Category III: All vulnerable returnees to
Bosnia and Herzegovina and Croatia and all vulnerable returnees who have
already returned to Croatia but who do not have a durable solution
either in the country of origin or in the reception country.
(iv) Category IV: Displaced persons accommodated in collective centres and private accommodations in Croatia.
(v) Category V: Vulnerable displaced persons outside collective centres in Bosnia and Herzegovina.
(vi) Category VI: Vulnerable persons displaced in
Montenegro in 1999. This was especially agreed by the participating
countries given that the Regional Housing Programme in other countries
deals only with 1991-1995 refugees.
(c) Eligible housing solutions:
The sub-projects under any of the Country Housing Projects must provide
the Eligible Beneficiaries with a durable housing solution. The housing
solutions to be provided include:
(i) Provision of flats and houses through building, reconstruction, renovation or purchase;
(ii) Provision of construction materials;
(iii) Accommodation in social welfare institutions.
Refugees and displaced persons will be provided
with the choice of either: voluntary return and reintegration in their
place of origin, or integration in their place of current residence.
(d) Eligible costs: The following represents a non-exhaustive list of cost elements of the sub-projects which are eligible:
(i) the cost of surveys or studies (technical,
economic or commercial, engineering) as well as the cost of technical
supervision of the sub-projects;
(ii) the preparation of the land;
(iii) the construction/renovation/modernization or
purchase of buildings or provision of building material directly linked
to a sub-project;
(iv) the installation of basic infrastructure such
as sewerage, water supply, electricity and telecommunications networks,
waste disposal and waste water treatment, roads, etc.;
(v) the purchase of materials and equipment;
(vi) contingencies for unanticipated costs
(technical and/or price increases) in respect of possible changes in the
quantity of work required, in the type and quantity of equipment to be
purchased or in the method of carrying out the sub-project which may
represent up to 10 per cent of the total cost of the sub-project.
(e) Non-eligible costs: The following represents a non-exhaustive list of cost elements of the sub-projects which are not eligible:
(i) the acquisition of land;
(ii) financial costs of investments (payment of debts, refinancing, interest charges etc.);
(iii) value added tax paid in the EU Member States or in the Partner Countries; and
(iv) any other costs which are not eligible under CEB’s policy for loans and project financing.
(f) Grant request assessment criteria: Specific
technical information on each sub-project will be further detailed in
the relevant Grant Request based on and in compliance with the grant
request assessment criteria to be prepared by the Technical Committee in
consultation with the Partner Countries and approved by the Assembly of
Donors (the «Grant Request Assessment Criteria»).
(g) Blending Grants and own resources:
The Fund Resources are intended to be used within the framework of the
Regional Housing Programme to support sub-projects co-financed by the
Partner Countries. The relevant Partner Country will allocate to its
sub-project its own financial and/or in-kind contribution in an amount
at least equal to the corresponding own contribution specified in the
«Budget» set out in Annex 2 to the «Joint Regional Programme on Durable
Solutions for Refugees and Displaced Persons». For the avoidance of
doubt, Grant Requests will be approved, only if the available funding
covers the cost of the relevant sub-project.
1.4 Application of General Conditions
(a) As and from the Effective Date, the operation
of the RHP Fund and the Fund Resources will be governed by, and such
Fund Resources will be received, administered, used and disposed of in
accordance with these General Conditions. The General Conditions may be
supplemented by Procedures and Implementing Guidelines to be adopted by
the Assembly of Donors in agreement with the Fund Manager. Without
prejudice to the foregoing, where discrepancies or conflicts are
identified between or among the provisions of the General Conditions and
the provisions of any supplementary Procedures and/or Implementing
Guidelines, adopted by the Assembly of Donors, the General Conditions
will prevail.
(b) Each Donor will conclude with the Fund Manager
an Adherence Agreement at the time when it makes its first Contribution
to the RHP Fund. The conclusion of the Adherence Agreement will be a
prerequisite for making a Contribution to the RHP Fund and participation
in the RHP Fund. By adhering to the General Conditions each Donor
agrees to participate in the Assembly of Donors according to the
provisions set out herein.
2. FUND RESOURCES
2.1 Fund Resources
The Fund Resources will consist of:
(a) Contributions made by Donors pursuant to Paragraphs 2.2 and 2.3 below;
(b) interest accrued on the Fund Resources in accordance with Paragraph 3.7; and
(c) amounts recovered under proceedings taken pursuant to Paragraph 3.4(c) below.
2.2 Contributions
(a) Subject to the provisions of Paragraphs 1.4(b)
above and 2.2(b) below, any Donor may make a Contribution to the RHP
Fund by entering into a Contribution Agreement. By entering into a
Contribution Agreement the relevant Donor irrevocably undertakes to make
the Contribution described therein available on the relevant date/s
specified therein in accordance with Paragraph 2.3 below.
(b) The minimum amount of the initial Contributions
by each Donor will be €250,000 (the «Initial Contribution Minimum
Amount») and each subsequent Contribution will be made in an amount of
at least €250,000 (the «Subsequent Contribution Minimum Amount»).
(c) A Donor may, at any time, increase the amount
of its Contribution. The provisions of the General Conditions relating
to the Contribution will apply equally to any additional amounts so
contributed.
2.3 Payment of Contributions
(a) Each Contribution will be in Euro or U.S.
dollars and will be transferred to the Fund Account within three months
following the signing of the relevant Contribution Agreement at the
latest. Payments may be made (i) as a single instalment, or (ii) where
the Contributions are of €5,000,000 or in excess thereof in several
instalments with a maximum of two per calendar year, whereby the first
instalment is payable within three months following the signing of the
relevant Contribution Agreement as set out in the relevant Contribution
Agreement.
(b) All payments made in U.S. dollars will be
converted upon receipt into Euro by the Fund Manager and the amount of
Euro so received will be deemed to be the amount of the relevant
Contribution.
2.4 Earmarking of Contributions
Un-earmarked Contributions to the RHP Fund
(covering all four Country Housing Projects) are preferred. However, a
Donor may earmark its Contribution for a specific Country Housing
Project or specific Country Housing Projects, by specifying the
earmarking in the Contribution Agreement.
2.5 The Fund Manager’s acknowledgment of Contributions
First Contribution: Following receipt of the first
Contribution in the Fund Account, the Fund Manager will issue to each
Donor who at such date has entered into a Contribution Agreement a
statement including (a) details of such first Contribution and (b) a
confirmation of the commencement of the RHP Fund’s activities specifying
the Effective Date.
Further Contributions: Following receipt of any
further signed Contribution Agreement, the Fund Manager will issue to
each Donor a statement including details of such Contribution.
On the occasion of each Assembly of Donors, the
Fund Manager will issue a table showing the aggregate Contributions
effectively received from each Donor and the voting rights thus acquired
in the Assembly of Donors (see Paragraph (g)).
2.6 Separation of Resources
(a) The Fund Resources will at all times and in all respects be kept in a separate Fund Account.
(b) Under no circumstances will the resources of
the CEB be charged with, or used to discharge, losses or liabilities
arising out of the operations or other activities of the RHP Fund.
(c) In the operation and other activities of the
RHP Fund, the liability of the CEB will be limited to the Fund Resources
which are at the disposal of the CEB.
3. GOVERNANCE AND ADMINISTRATION OF THE RHP FUND
3.1 General Principles of Governance
The RHP Fund has no separate legal personality and
thus will be managed by the Fund Manager on behalf of the Donors in
accordance with these General Conditions and under the supervision of
the Assembly of Donors and the RHP Steering Committee.
The Assembly of Donors is the governing body of the
RHP Fund and, in particular, decides on the use and allocation of the
Fund Resources.
The RHP Steering Committee is the high coordinating body of the RHP.
The role and the functioning of the RHP Steering
Committee is described in the Rules of Procedure of the RHP Steering
Committee which will be endorsed by the participants to the RHP Steering
Committee prior to the RHP Steering Committee’s first meeting.
3.2 The Assembly of Donors
(a) The Assembly of Donors of the RHP Fund will be composed of the following:
(i) one (1) representative of each Donor;
(ii) the Fund Manager having a non-voting status,
and it will be co-chaired by the Commission on a
permanent basis (the «Chair of the Assembly of Donors») and another
Donor on an annual rotation basis being, at any given time, the same
Donor who will act as co-chair of the RHP Steering Committee (the
«Co-Chair of the Assembly of Donors»).
(b) The Assembly of Donors of the RHP Fund will:
(i) approve Grants in accordance with the decision making procedure described in Paragraph 3.2(g) below.
(ii) monitor the payment of the committed
Contributions to the RHP Fund, having regard to implementation of
Country Housing Projects to be supported with Fund Resources;
(iii) decide on measures to be taken, pursuant to Paragraph 3.2(i) below;
(iv) approve the annual financial statements of the RHP Fund;
(v) monitor financial flows of the RHP Fund,
including upon the cancellation of any Contribution Agreement and/or the
winding up of the RHP Fund;
(vi) take decisions pursuant to Paragraph 3.2(j) below; and
(vii) on an exceptional basis, approve the use of
Fund Resources by the Finance Institution for such other activities as
the Assembly of Donors may decide within the framework of the Regional
Housing Programme in accordance with the decision making procedure
described in Paragraph 3.2(g) below.
(c) Subject to Paragraph 2.2(b), each Donor will
have the right to be represented in the Assembly of Donors of the RHP
Fund, to participate in their meetings provided that such Donor has, on
the date of the meeting of the Assembly of Donors of the RHP Fund, met
its obligations under its Contribution Agreement(s).
(d) Each Donor’s representative to the Assembly of
Donors of the RHP Fund will be at the service of such Donor without
remuneration from the RHP Fund. Each representative may be accompanied
by up to one (1) advisory staff while the Chair of the Assembly of
Donors and the Co-Chair of the Assembly of Donors may be accompanied by
up to two (2) advisory staff each also without remuneration from the RHP
Fund. The same representative of each Donor to the Assembly of Donors
of the RHP Fund will act as its representative to the RHP Steering
Committee. Participants to the Assembly of Donors of the RHP Fund will
cover their own costs of participation. An individual may at the same
time serve as representative of more than one Donor in the Assembly of
Donors of the RHP Fund if such Donors will have so agreed and notified
the Fund Manager, in writing and in advance of the meeting.
(e) The Assembly of Donors of the RHP Fund will
meet a minimum of two (2) times per year, except for in the first and
last year of the operation of the RHP Fund where the Assembly of Donors
will meet a minimum of one (1) time per year, to perform the activities
set out in Paragraph 3.2(b).
(f) In addition, the Assembly of Donors of the RHP
Fund may hold special meetings to review the implementation of the RHP
Fund. Such meetings of the Assembly of Donors may be called by the Chair
of the Assembly of Donors, at the request of CEB or of the Donors,
which account for not less than one-third of the aggregate amount of all
paid in Contributions to the RHP Fund at the date on which such request
will have been made to the CEB.
(g) As and when required, the Assembly of Donors
will endeavour to take decisions by consensus of all Donors present at
the meeting when the relevant decision is taken.
Where consensus cannot be reached, such decision
will be taken by the Assembly of Donors by vote. Quorum: The quorum is
established at the start of each Assembly of Donors meeting. The
Assembly of Donors will be quorate if the Donors in attendance (A)
account for at least one fourth of the Donors who have delivered a
Contribution Agreement to the Fund Manager and (B) represent at least
2/3 of the total amount of the paid-in Contributions at the time of the
meeting. Voting Rules: A decision will be adopted if a majority of not
less than 2/3 of the Donors voting, vote in favour of such a decision,
provided that the total amount of all paid-in Contributions to the RHP
Fund by the Donors voting in favour of a decision represents not less
than 2/3 of the total amount of the paid-in Contributions.
(h) Written Procedure:
On an exceptional basis, for any urgent business concerning the RHP
Fund, the Assembly of Donors may take decisions, in accordance with the
decision-making procedure described in Paragraph 3.2(g) above, on the
basis of written resolutions, in the absence of a meeting.
Such a resolution will be approved if all Donors
entitled to participate in the decision-making process, confirm their
agreement with the written resolution. If a Donor does not submit its
response with respect to the written resolution within the timeframe
provided for this purpose, its vote will be counted in favour of the
written resolution. A minimum of fifteen (15) calendar days will be
given for each request for response.
If one or more Donors reject the proposal within
fifteen (15) calendar days following receipt of the written request for a
decision accompanied by relevant supporting documents, such rejection
to be made in writing addressed to the Chair of the Assembly of Donors
and the Fund Manager, the Chair of the Assembly of Donors will upon
receipt of such a rejection call for a meeting of the Assembly of Donors
to discuss the relevant resolution.
(i) If failure by a Donor to meet its obligations
under its Contribution Agreement will, in the judgement of the Fund
Manager, materially interfere with or prejudice the operations of the
RHP Fund, in whole or in part, the Fund Manager may request that the
Chair of the preceding Assembly of Donors call a special meeting of the
Assembly of Donors to consider the taking of appropriate measures.