VLADA REPUBLIKE HRVATSKE
48
Na temelju članka 30. stavka 1. Zakona o sklapanju i izvršavanju međunarodnih ugovora (Narodne novine, broj 28/96), Vlada Republike Hrvatske je na sjednici održanoj 13. srpnja 2017. godine donijela
UREDBU
O OBJAVI DODATKA BR. 1 SPORAZUMU O FINANCIRANJU IZMEĐU VLADE REPUBLIKE HRVATSKE I EUROPSKE KOMISIJE U VEZI S NACIONALNIM PROGRAMOM ZA HRVATSKU U OKVIRU PROGRAMA IPA – KOMPONENTA POMOĆ U TRANZICIJI I JAČANJE INSTITUCIJA ZA 2013. GODINU
Članak 1.
Objavljuje se Dodatak br. 1 Sporazumu o financiranju između Vlade Republike Hrvatske i Europske komisije u vezi s Nacionalnim programom za Hrvatsku u okviru programa IPA – komponenta Pomoć u tranziciji i jačanje institucija za 2013. godinu, potpisan u Bruxellesu 26. listopada 2016. godine i u Zagrebu 10. studenoga 2016. godine, u izvorniku na engleskom jeziku.
Članak 2.
Tekst Dodatka br. 1 Sporazumu iz članka 1. ove Uredbe, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
ADDENDUM N° 1 TO THE FINANCING AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF CROATIA AND THE EUROPEAN COMMISSION CONCERNING THE NATIONAL PROGRAMME FOR CROATIA UNDER THE IPA – TRANSITION ASSISTANCE AND INSTITUTION BUILDING COMPONENT FOR 2013
(Decentralised Management)
As originally concluded on between the Government of the Republic of Croatia («the Beneficiary Country») and the European Commission (»the Commission»)
Whereas:
(a) The Commission adopted the National Programme for Croatia under the IPA Transition Assistance and Institution Building Component for 2013 by DecisionC(2012) 9388 of 11 December 2012. This Programme is implemented by means of a Financing Agreement concluded between the Commission and the Beneficiary Country on 14 January 2014.
(b) The Programme was amended on 20 October 2016 by the Commission Implementing Decision C(2016) 6718 in order to make savings accumulated during contracting available for the financing of a new project on de-mining added to the programme and to modify an existing project on minorities.
(c) It is necessary to bring the Financing Agreement in line with the amendment to the Programme brought by Commission Implementing Decision C(2016) 6718.
HAVE AGREED AS FOLLOWS:
Article 1
Annex A to the Financing Agreement concluded between the European Commission and the Government of Croatia on 14 January 2014 is replaced by the Annex 1 to the present Addendum.
Article 2
All other terms and conditions of the Financing Agreement remain unchanged.
Article 3
This Addendum shall enter into force on the date of its signature by the second of the two Parties.
Done in 2 originals in the English language, one original for the Commission and one for the Beneficiary Country.
Annex 1
NATIONAL PROGRAMME FOR CROATIA UNDER THE IPA TRANSITION ASSISTANCE AND INSTITUTION BUILDING COMPONENT FOR THE YEARS 2012
AND 2013
1 IDENTIFICATION
1 Projects to be financed under the 2013 allocations are subject to budgetary approval of the 2013 budget by the budgetary authority.
2 This financing proposal is complemented by two separate Global Authorisations for Croatia's participation as active observer in the committees and expert groups of the Commission (2012: EUR 800,000; 2013: EUR 500,000). In addition, Croatia envisaged a transfer of a total of EUR 9,302,571 to the Regional Housing Programme under the Sarajevo Process (2012: EUR 3,949,302; 2013: EUR 5,353,269). This project will be implemented as a multi-beneficiary programme under centralized management. Finally, EUR 1,250,000 from the 2013 allocation has been transferred from Component I to Component II, in order for Croatia to match the full year allocations of Bosnia and Herzegovina, Montenegro and Serbia under the respective Cross border cooperation programmes for 2013.
2. THE PROGRAMME
2.1. PRIORITIES SELECTED UNDER THIS PROGRAMME
The programme’s strategic reference is the Multi-Annual Indicative Planning Document (MIPD) 2011-2013. Priorities selected for the MIPD 2011-2013 aim at supporting the strengthening of the rule of law, public administration reform, and preparation for the implementation of the EU cohesion and agriculture and rural development policies. To achieve these priorities, the Commission is focusing its assistance primarily on the following sectors: justice and home affairs and fundamental rights, public administration reform, environment and climate change, transports, private sector development, social development, agriculture and rural development.
The first two sectors, namely ‘justice and home affairs and fundamental rights’ and ‘public administration reform’, were identified in the Enlargement Strategy 2011-2012 and the 2011 Progress Report as areas requiring a consolidation of reform efforts, also in light of lessons learned from previous enlargements and in line with the renewed consensus on enlargement, as agreed by the December 2006 European Council. They are key sectors eligible to receive support under the Transition Assistance and Institution-Building Component. Other sectors may be supported by acquis-related projects.
The accession negotiations with Croatia were closed in June 2011; the Treaty of Accession was signed on 9 December 2011. This was the result of Croatia meeting the closing benchmarks in the remaining areas over the past year, including in difficult chapters such as judiciary and fundamental rights and competition policy. Given Croatia’s advanced stage of membership preparations, the financing proposal focuses on the remaining assistance needs relevant for assuming membership obligations as well as strategic capacity-building efforts for the post-accession period. Therefore, EU assistance under this programme is increasingly moving from sheer adoption and concrete implementation of the acquis to more general administrative strengthening of post–accession priorities, with a particular focus on justice and home affairs and fundamental rights and public administration reform.
In the area of public administration reform, further efforts are needed in improving professionalism and ensuring the efficient implementation of the relevant legal framework in order to build a modern, reliable, transparent and citizen-oriented public service. As regards justice, home affairs and fundamental rights, Croatia achieved substantial results but needs to consolidate reforms. Judicial reform requires constant attention, especially concerning judicial efficiency and the practical implementation of new measures relating to independence, impartiality and accountability of the judiciary. The establishment of adequate administrative and judicial structures as well as the strengthening of administrative and judicial capacity to implement the acquis are important elements of the accession process.
In light of Croatia’s envisaged EU accession date of 1 July 2013, the programming for the National Programme 2012 and 2013 has been combined and is jointly presented in this Financing Proposal. The measures included in the programme have been prepared in parallel and are complementary in nature. This will also allow for an early implementation of the 2013 budgetary allocation. Careful attention has been paid to sequencing, with a number of projects representing continuations of previous initiatives.
2.2 SECTORS SELECTED UNDER THIS PROGRAMME AND DONOR COORDINATION
The needs assessment for EU financial assistance under this financing proposal takes into account the »Programme of the Government of the Republic of Croatia for assumption and implementation of the acquis communautaire» and relevant national sectoral strategies. The strategy for EU financial assistance is to directly support Croatia’s pre-accession preparations for joining the EU, thus contributing, on a wider scale, to the »Europe 2020 – the European strategy for smart, sustainable and inclusive growth».
To achieve the priorities selected for support in the period 2011-2013, the Commission will focus its assistance on the following two sectors: (i) Public Administration Reform, and (ii) justice and home affairs and fundamental rights. Other sectors identified in the MIPD are, with well-defined exceptions, not the focus of this programme, but receive support from the other IPA Components as well as other donors.
Public administration reform
With regard to Public Administration Reform, the National Programme addresses the MIPD objectives of supporting the implementation of the human resources development strategy and increasing the capacity of public administration at central, regional, and local levels. It also addresses alignment and capacity issues in the field of customs and taxation.
Concretely, this financing proposal, will contribute to the development of an open, transparent and client-oriented public administration as part of the European Administrative Space by addressing the issue of citizen participation in public affairs. Special attention is given to the preparation for the structural and cohesion funds, through capacity building at the local and regional level. Public Administration will also be strengthened through flexible facilities aiming to further strengthening Croatia’s institutional capacity to ensure implementation of the acquis communautaire.
In order to ensure effective exchange of information between the EU Member States and with the Commission and to strengthen the administrative capacity, the programme also provides information and communication equipment to the Croatian Customs Administration. This will minimise remaining differences between the customs processes of Croatia and the EU Member States.
Justice and home affairs and fundamental rights
As regards justice and home affairs and fundamental rights, the National Programme focuses on the following MIPD objectives: strengthen judicial independence and efficiency; support the protection of fundamental rights, especially for minority groups and refugees; contribute to refugee return, and advance the implementation of the Integrated Border Management Action Plan and Schengen Action Plan. Complementary to this, the National Programme also includes measures to support Croatia’s efforts to fight organised crime; strengthen the capacity of law enforcement institutions, as well as the provision of support for de-mining measures.
The supported activities respond to capacity needs confirmed in the 2011 Progress Report and are embedded in national strategies and policies in this sector, namely the Croatian Strategy of the Reform of the Judiciary 2011-2015, the Investment Plan for Judicial Infrastructure for the period 2011-2019, the Anti-Corruption Strategy, as well as the Action Plan for the Improvement of the Prison System 2011-2014, and the Integrated Border Management Action Plan.
Concretely, the programme will further improve the efficiency of the court system through an optimised case tracking system of the State Attorney Office and USKOK, as well as increase administrative capacity of courts through upgrading the case management system. The use and functionality of the war crimes database will also be strengthened. Furthermore, the programme will improve the crime intelligence capacities and establish the pre-conditions for the automated exchange of dactyloscopic data under the Prüm decision. This aside, it includes a project to enhance the management of the prison system and invest in adequate rehabilitative facilities at the Turopolje Correctional Institute, where the need for physical investments were inter alia confirmed by an European Commission peer-review mission that took place at the end of 2011.
As mentioned in the 2011 Progress Report and the Enlargement Strategy 2011-2012, progress has been made in the field of external borders. However, attention needs to be directed at the timely implementation of the action plan. Support is therefore foreseen for the upgrading of border infrastructure in Tovarnik and Maljevac, which were identified as priority investments in Croatia’s Schengen Action Plan.
Concerning the protection of fundamental rights, especially minority groups and refugees, the programme includes support schemes for civil society organisations, promoting open governance and transparency in managing public and natural resources as well as ensuring enforcement and respect of human rights standards in Croatia. In parallel, the programme strengthens the capacity and advisory function of the Councils of National Minorities, and thus supports the implementation of the Constitutional Act on the Rights of National Minorities.
While not part of this financing proposal, Croatia envisages a transfer of a total of EUR 9.3 million from its 2012 and 2013 IPA Component I allocation to the Regional Housing Programme under the Sarajevo process, set up by the four participating countries and implemented as a multi-beneficiary programme. The funds will be transferred to Croatia’s part of the Regional Housing Programme.
Social development and supporting programmes
With an informal economy estimated significantly above EU average, the programme also includes a project to strengthen policy and capacity to reduce undeclared work. The rehabilitation of the Moise Palace on the island of Cres combines the restoration of an important cultural heritage site with providing education and employment opportunities for the local community. This is complemented by the regular allocation for Croatia’s participation in Union Programmes and Agencies.
Donor coordination
The Commission, together with the support of the EU Delegation in Zagreb, has organised consultations both on the MIPD 2011-2013 as well as on the National Programme for 2012 and 2013 with EU Member States’ embassies and local branches of International Financial Institutions (IFIs). Other donors, international finance institutions and relevant civil society organisations gave a generally positive response. Relevant comments have been taken into account. The assistance provided by IFIs and bilateral donors further reinforce the prospects for sustainability, for instance as regards the World Bank financed Justice Sector Support Programme.
2.3 DESCRIPTION
2.3.1 National Programme 2012 allocation
Sector 1: Public administration reform
The main objectives in this sector are to support the implementation of the human resources development strategy (2010-2013); to support the capacity of public administration at central, regional and local levels to manage decentralisation reforms; to support the improvement of the administrative capacity of the Ministry of Administration; and to support further alignment in the fields of public procurement, taxation, statistics, customs, budgetary reforms, and public internal financial control.
Indicators to assess the impact of EU support include, inter alia:
– Enhanced co-ordination and administrative capacities of main stakeholders in the sector;
– Trainings carried out and training materials produced and a sufficient number of civil servants trained;
– Information/awareness-raising campaigns carried out.
The overall objective of the project is to contribute to the promotion and protection of human rights (minority rights), open, transparent and client-oriented public administration through citizens’ participation in public affairs as well as active participation of the public administration at the regional and local level in the EU Cohesion Policy. The beneficiary institution for Component I and II is the Ministry of Administration while for Component III is Ministry of Regional Development and EU Funds. Component I will be implemented by one service contract to support the efficient implementation of the Constitutional Act on the Rights of National Minorities and one supply contract to purchase and install required IT equipment. The tenders are foreseen to be launched in the 4th quarter 2015. Component II will be implemented through one framework contract to strengthen the role of citizens in improving the quality of public administration services, to be launched in the 3rd quarter of 2015. Component III will be implemented through a technical assistance contract, to establish a training system on structural and cohesion funds, to be launched in the 2nd quarter 2016.
The project aims to help fulfil Croatia obligations concerning Chapter 29 (Customs Union) and part of Chapter 16 (Taxation) related to the set-up of efficient and effective implementation of customs systems required to connect with the EU IT systems. It will in particular focus on implementing and managing all the elements of safety and security of ICT. The beneficiary is the Ministry of Finance. The project will be implemented through a supply contract, foreseen to be launched in the 2nd quarter 2013.
This facility aims to strengthen the capacities of the Croatian state and regional administration bodies in fulfilling their respective post-accession roles and functions, as well as reinforce the institutional capacity for the management of post accession EU funds. It will support needs in the following areas: justice and home affairs, public administration reform, capacity-building measures at state, regional and local level to manage post-accession funds, as well as fight against corruption and public procurement. It will be implemented through, indicatively, 10 twinning and twinning light contracts, as well as approximately 10 technical assistance contracts. This facility is used for projects which are too small to be justified as specific and separate interventions, amounting from EUR 50.000 to EUR 250.000 per contract, or above, if duly justified in case of more complex interventions. It is expected that all service tenders/calls for proposals for twinning grant agreements will be launched in the first semester of 2015. The beneficiary is the Ministry of Regional Development and EU Funds.
Sector 2: Justice and home affairs and fundamental rights
The main objectives in this sector are to strengthen judicial independence and efficiency; to support the protection of fundamental rights, especially for minority groups and refugees; to support the further alignment of migration, visa and asylum policies; to ensure safe border control through de-mining activities, to continue the implementation of Integrated Border Management (IBM) Action Plan and Schengen Action Plan; to support Croatia’s efforts to fight organised crime, corruption – including the prevention of corruption, money laundering and trafficking of human beings and drugs; to support de-mining measures with a view to enhance the economic development and the overall security environment, as well as to contribute to refugee return; and to support civil society in the framework of the Commission’s Civil Society Facility covering a wide range of sectors not limited to «justice and home affairs» and including support to CSOs at the regional and local levels.
Indicators to assess the impact of EU support include, inter alia:
– Reduction in the length of court proceedings and reduction in the backlog of cases;
– Improved court management systems;
– Number of successful prosecutions and final convictions for cases of organised crime, corruption, money laundering and trafficking of human beings and narcotics;
– Increased amounts of proceeds of crime recovered;
– Strengthened capacity of law enforcement institutions, including improved inter-agency and international cooperation;
– Strengthened IBM and prevention of illegal migration by creating effective systems for management of asylum, illegal migration and borders;
– Improved environment for civil society and strengthened capacities of CSOs, more effective civic participation in policy processes at all levels;
No of m2 of demined area alongside the border with Bosnia and Herzegovina in Sisak-Moslavina County.
The project aims at increasing the efficiency of the judiciary through capacity building of the State Attorney Office/USKOK as well as strengthening the functionality of the war crime database. The beneficiary is the Ministry of Justice. The project will be implemented through two technical assistance contracts, namely on upgrading the State Attorney Office’s case tracking system, business processes and interconnectivity, as well as the war crimes database. These are foreseen to be launched in the 4th quarter 2013. In addition, a supply contract is foreseen for purchasing and installing required IT equipment, anticipated for the 3rd quarter 2013.
The purpose of the project is to establish a reliable and efficient case management system at Croatian Courts, through optimising business processes as well as upgrading the integrated case management system. The beneficiary is the Ministry of Justice. To this end, a technical assistance contract aimed at this and a supply contract to purchase and install required IT equipment are expected to be launched in the 1st quarter 2014 and the 4th quarter 2013 respectively.
The project’s purpose is to set up a system of life-long learning for the prison administration in Croatia and to improve the infrastructure quality of the Prison Training Centre as well as the Turopolje Correctional Institute. The beneficiary is the Ministry of Justice. The project is implemented through a twinning contract to develop a lifelong learning system, adjust the organisational structure of the training centre, and enhance the system for treatment of juveniles (EUR 700,000), a works contract to improve the infrastructure and two technical assistance contracts to supervise the works as well as to develop a unified IT system. All tender procedures are foreseen to be launched in the 4th quarter 2013. In addition, a supply contract to improve the working environment is scheduled to be launched in the 1st quarter 2015.
The project aims to strengthen Croatia’s border police capacities and readiness to control the future EU external border by constructing and equipping the Police Station in Tovarnik and the Border Police Station in Maljevac. The beneficiary is the Ministry of Interior. The project will be implemented through two works contracts for their construction, two service contracts for the supervision of works, as well as a supply contract aimed at equipping both, the Police Station in Tovarnik and the Border Police Station in Maljevac. The works and service contracts are foreseen to be launched in the 1st quarter 2014. The supply contract’s launch is planned for the 3rd quarter 2014.
The project aims to increase citizen participation in public affairs and human rights protection with a special emphasis to be given to the protection of national minority rights, and the rights of the Roma minority in exercising human rights. The beneficiary is the Government Office for Cooperation with NGOs. The project will be implemented through three individual calls for proposals foreseen to be launched in the 1st quarter 2014. The grant schemes will aim at the contribution of civil society organisations that is crucial for the consistent implementation of the overall legal framework aligned with the acquis, and for the long-term sustainability of the civil sector.
This project addresses the issues of national minority participation in public affairs and human rights protection through elected minority councils on the local and regional level. It also addresses the protection of Roma national minority rights on the local level and contributes to the collection and monitoring of base line data on Roma community and obstacles for its integration in the society as a precondition for the fulfilment of the National Roma Inclusion Strategy through cooperation between local stakeholders and the active participation of Roma themselves. The beneficiary is the Government Office for Human Rights and the Rights of National Minorities. The project will be implemented through a service contract to strengthen the capacity and work of national minority councils, and a second service contract to support efficiency in the implementation of the Roma Inclusion Policy in Croatia. In addition, one supply contract is foreseen to purchase and install required IT equipment. All tender procedures are foreseen to be launched in between 1st quarter 2015 and the 3rd quarter 2016.
The project aims at creating a safe environment and setting security pre-conditions for efficient border control in war affected areas, by performing demining operations in Sisak-Moslavina County. The project will be implemented through a direct grant agreement with the Croatian Mine Action Centre (CROMAC), on the basis of article 190 (1) (c) of the Rules of Application of the Financial Regulation, since according to the Croatian Mine Action Act, only CROMAC is authorised to award humanitarian demining operations to demining companies as a result of public procurement procedures. The direct grant is foreseen to be signed in the 4th quarter 2016.
Sector 7: Social development
The project aims to develop a comprehensive targeted strategy to reduce undeclared work, by improving policies, measures, monitoring and enforcement, as well as strengthening administrative capacities and cooperation of relevant institutions. The beneficiary is the Ministry of Labour and Pension System. It will be implemented through a twinning contract (EUR 1,000,000) as well as a supply contract, indicatively foreseen for 2nd quarter 2015.
Sector 9: Support and other activities
A Protocol to the Stabilisation and Association Agreement on a Framework Agreement on the general principles for Croatia’s participation in Union Programmes was signed in November 2004. The IPA programme can be used to meet a part of the costs for the participation in the programmes in accordance with Article 5 Paragraph 2 of the Framework Agreement. EUR 5,092,494 are allocated from IPA 2012 Component I to co-finance the participation of Croatia in the following indicative list of Union Programmes and Agencies: Fiscalis 2013, CUSTOMS 2013, Culture 2007-2013, Media 2007, Seventh Framework Programme for Research, Technological Development and Demonstration Activities, Europe for Citizens, PROGRESS, Competitiveness and Innovation Framework (CIP), Civil protection financial instrument, Second Programme of Community Action in the Field of Health 2008-2013, Marco Polo II, ISA (Interoperability Solutions for European Public Administrations), LifeLong Learning, Youth in Action and European Union Agency for Fundamental Rights (FRA). The participation of Croatia in Union programmes shall follow the specific terms and conditions set out for each such programme in the memorandum of understanding to be concluded by the European Commission and Croatia, in accordance with the agreements establishing the general principles for participation of Croatia in Union programmes. It shall include provisions on both the total amount of Croatia’s contribution and the amount funded by assistance under the IPA Regulation. The indicative list of Union Programmes and Agencies may be adapted to meet time constraints and availability of funds once the information concerning financial contribution to be paid by the Republic of Croatia in all Union Programmes and Agencies has been communicated.