HRVATSKI SABOR
1
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O JAMSTVU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA »DODATNO FINANCIRANJE KREDITNOG PROGRAMA FINANCIRANJA IZVOZA«
Proglašavam Zakon o potvrđivanju Ugovora o jamstvu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za »Dodatno financiranje kreditnog programa financiranja izvoza«, koji je Hrvatski sabor donio na sjednici 14. prosinca 2012. godine.
Klasa: 011-01/12-01/193
Urbroj: 71-05-03/1-12-2
Zagreb, 19. prosinca 2012.
Predsjednik
Republike Hrvatske
Ivo Josipović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O JAMSTVU IZMEĐU REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA »DODATNO FINANCIRANJE KREDITNOG PROGRAMA FINANCIRANJA IZVOZA«
Članak 1.
Potvrđuje se Ugovor o jamstvu između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za »Dodatno financiranje kreditnog programa financiranja izvoza«, potpisan u Zagrebu 29. listopada 2012., u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
LOAN NUMBER 8193-HR
GUARANTEE AGREEMENT
(Additional Financing for the Export Finance Intermediation Loan Project) between
REPUBLIC OF CROATIA
and
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
GUARANTEE AGREEMENT
AGREEMENT, dated October 29, 2012, entered
into between the REPUBLIC OF CROATIA («Guarantor») and INTERNATIONAL
BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank») («Guarantee Agreement»)
in connection with the Loan Agreement of same date for the purpose of
providing additional financing for Loan 7774-HR (Export Finance
Intermediation Loan Project) between the Bank and the Croatian Bank For
Reconstruction And Development («Borrower») («Loan Agreement»). The
Guarantor and the Bank hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
Section 1.01. The General Conditions (as
defined in the Appendix to the Loan Agreement) constitute an integral
part of this Agreement.
Section 1.02. Unless the context requires
otherwise, the capitalized terms used in this Agreement have the
meanings ascribed to them in the General Conditions or in the Loan
Agreement.
Article II
GUARANTEE; PROVISION OF FUNDS
Section 2.01. The Guarantor declares its
commitment to the objectives of the Project. To this end, without
limitation or restriction upon any of its other obligations under the
Guarantee Agreement, the Guarantor hereby unconditionally guarantees, as
primary obligor and not as surety merely, the due and punctual payment
of all Loan Payments payable by the Borrower pursuant to the Loan
Agreement, and the punctual performance of all the other obligations of
the Borrower set forth or referred to in the Loan Agreement.
Section 2.02. Without limitation or
restriction upon the provisions of Section 2.01 of this Agreement, the
Guarantor specifically undertakes, whenever there is reasonable cause to
believe that the funds available to the Borrower will be inadequate to
meet the estimated expenditures required for the carrying out of the
Project, promptly to provide the Borrower with the funds needed to meet
such expenditures.
Article III
REPRESENTATIVE; ADDRESSES
Section 3.01. The Guarantor’s Representative is the Minister of Finance.
Section 3.02. The Guarantor’s Address is:
Ministry of Finance
Katanciceva 5
10000 Zagreb
Republic of Croatia
Facsimile:
(385-1) 4922-598
Section 3.03. The Bank’s Address is:
International Bank for
Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America
Cable: Telex: Facsimile:
INTBAFRAD 248423 (MCI) or (1-202) 477-6391
Washington, D.C. 64145 (MCI)
AGREED at Zagreb, Republic of Croatia, as of the day and year first above written.
REPUBLIC OF CROATIA
By Authorized Representative
Name: Slavko Linić
Title: Minister of Finance
INTERNATIONAL BANK FOR
RECONSTRUCTION AND DEVELOPMENT
By Authorized Representative
Name: Hogjoo J. Hahm
Title: Country Manager,
World Bank Office, Croatia
ZAJAM BROJ 8193-HR
UGOVOR O JAMSTVU
(Dodatno financiranje kreditnog programa financiranja izvoza) između
REPUBLIKE HRVATSKE
i
MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ
UGOVOR O JAMSTVU
UGOVOR, od 29. listopada 2012., sklopljen između REPUBLIKE HRVATSKE (»Jamac«) i MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ (»Banka«) (»Ugovor o jamstvu«) u vezi s Ugovorom o zajmu s istim datumom u svrhu dodatnog financiranja zajma 7774-HR (kreditni program financiranja izvoza) između Banke i Hrvatske banke za obnovu i razvitak (»Zajmoprimac«) (»Ugovor o zajmu«). Jamac i Banka su se ovime sporazumjele kako slijedi:
Članak I.
OPĆI UVJETI; DEFINICIJE
Odjeljak 1.01. Opći uvjeti (kako su određeni u Dodatku Ugovora o zajmu) čine sastavni dio ovoga Ugovora.
Odjeljak 1.02. Ako kontekst ne nalaže drukčije, izrazi napisani velikim početnim slovima koji se upotrebljavaju u ovom Ugovoru imaju značenja koja su im pripisana u Općim uvjetima ili u Ugovoru o zajmu.
Članak II.
JAMSTVO; OSIGURAVANJE SREDSTAVA
Odjeljak 2.01. Jamac izražava svoju opredijeljenost za ciljeve Projekta. U tu svrhu, ne ograničavajući ni na koji način bilo koju svoju drugu obvezu iz Ugovora o jamstvu, Jamac bezuvjetno jamči, kao dužnik, a ne samo kao jamac, pravodobno i točno plaćanje svih otplata Zajma koje je Zajmoprimac dužan plaćati u skladu s Ugovorom o zajmu, kao i točno izvršavanje svih drugih obveza Zajmoprimca navedenih u Ugovoru o zajmu.
Odjeljak 2.02. Ne ograničavajući ni na koji način odredbe Odjeljka 2.01 ovoga Ugovora, Jamac se posebno obvezuje da će, kad god bude imao razloga vjerovati da sredstva kojima raspolaže Zajmoprimac neće biti dostatna za podmirenje procijenjenih izdataka potrebnih za izvršenje Projekta, Zajmoprimcu promptno osigurati sredstva potrebna za podmirenje tih izdataka.
Članak III.
PREDSTAVNIK; ADRESE
Odjeljak 3.01. Predstavnik Jamca je ministar financija.
Odjeljak 3.02. Adresa Jamca je:
Ministarstvo financija
Katančićeva 5
10000 Zagreb
Republika Hrvatska
Telefaks:
(385-1) 4922-598
Odjeljak 3.03. Adresa Banke je:
Međunarodna banka za
obnovu i razvoj
1818 H Street, N.W.
Washington, D.C. 20433
Sjedinjene Američke Države
Kabelogramska Teleks: Telefaks:
adresa:
INTBAFRAD 248423 (MCI) or (1-202) 477-6391
Washington, D.C. 64145 (MCI)
DOGOVORENO u Zagrebu, Republika Hrvatska, na gore navedeni datum.
REPUBLIKA HRVATSKA
Ovlašteni predstavnik
Ime: Slavko Linić
Titula: ministar financija
MEĐUNARODNA BANKA
ZA OBNOVU I RAZVOJ
Ovlašteni predstavnik
Ime: Hongjoo J. Hahm
Titula: voditelj Ureda
Svjetske banke za Republiku Hrvatsku
Članak 3.
Tekst Ugovora o zajmu između Hrvatske banke za obnovu i razvitak i Međunarodne banke za obnovu i razvoj, za »Dodatno financiranje kreditnog programa financiranja izvoza« potpisan 29. listopada 2012., u izvorniku na engleskom i prijevodu na hrvatski jezik, glasi:
LOAN AGREEMENT
(Additional Financing for the Export Finance Intermediation Loan Project) between
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
and
CROATIAN BANK FOR RECONSTRUCTION AND DEVELOPMENT
Dated October 29, 2012
LOAN AGREEMENT
Agreement dated October 29, 2012, between
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT («Bank») and
CROATIAN BANK FOR RECONSTRUCTION AND DEVELOPMENT («Borrower») for the
purpose of providing additional financing for the Original Project (as
defined in the Appendix to this Agreement). The Borrower and the Bank
hereby agree as follows:
Article I
GENERAL CONDITIONS; DEFINITIONS
1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement.
1.02. Unless the context requires
otherwise, the capitalized terms used in this Agreement have the
meanings ascribed to them in the General Conditions or in the Appendix
to this Agreement.
Article II
LOAN
2.01. The Bank agrees to lend to the
Borrower, on the terms and conditions set forth or referred to in this
Agreement, the amount of fifty million Euro (EUR 50,000,000), as such
amount may be converted from time to time through a Currency Conversion
in accordance with the provisions of Section 2.07 of this Agreement
(«Loan»), to assist in financing the project described in Schedule 1 to
this Agreement («Project»).
2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of Schedule 2 to this Agreement.
2.03. The Front-end Fee payable by the
Borrower shall be equal to one quarter of one percent (0.25%) of the
Loan amount. The Borrower shall pay the Front-end Fee not later than
sixty (60) days after the Effective Date.
2.04. The interest payable by the Borrower
for each Interest Period shall be at a rate equal to the Reference Rate
for the Loan Currency plus the Fixed Spread;
provided, that upon a Conversion of all or any portion of the principal
amount of the Loan, the interest payable by the Borrower during the
Conversion Period on such amount shall be determined in accordance with
the relevant provisions of Article IV of the General Conditions.
Notwithstanding the foregoing, if any amount of the Withdrawn Loan
Balance remains unpaid when due and such non-payment continues for a
period of thirty (30) days, then the interest payable by the Borrower
shall instead be calculated as provided in Section 3.02 (e) of the
General Conditions.
2.05. The Payment Dates are April 15 and October 15 in each year.
2.06. The principal amount of the Loan
shall be repaid in accordance with the amortization schedule set forth
in Schedule 3 to this Agreement.
2.07. (a) The Borrower may at any time
request any of the following Conversions of the terms of the Loan in
order to facilitate prudent debt management: (i) a change of the Loan
Currency of all or any portion of the principal amount of the Loan,
withdrawn or unwithdrawn, to an Approved Currency; (ii) a change of the
interest rate basis applicable to: (A) all or any portion of the
principal amount of the Loan withdrawn and outstanding from a Variable
Rate to a Fixed Rate, or vice versa; or (B) all or any portion of the
principal amount of the Loan withdrawn and outstanding from a Variable
Rate based on a Reference Rate and the Variable Spread to a Variable
Rate based on a Fixed Reference Rate and the Variable Spread, or vice
versa; or (C) all of the principal amount of the Loan withdrawn and
outstanding from a Variable Rate based on a Variable Spread to a
Variable Rate based on a Fixed Spread; and (iii) the setting of limits
on the Variable Rate or the Reference Rate applicable to all or any
portion of the principal amount of the Loan withdrawn and outstanding by
the establishment of an Interest Rate Cap or Interest Rate Collar on
the Variable Rate or the Reference Rate.
(b) Any conversion requested pursuant to
paragraph (a) of this Section that is accepted by the Bank shall be
considered a «Conversion», as defined in the General Conditions, and
shall be effected in accordance with the provisions of Article IV of the
General Conditions and of the Conversion Guidelines.
Article III
PROJECT
3.01. The Borrower declares its commitment
to the objectives of the Project. To this end, the Borrower shall carry
out the Project in accordance with the provisions of Article V of the
General Conditions.
3.02. Without limitation upon the
provisions of Section 3.01 of this Agreement, and except as the Borrower
and the Bank shall otherwise agree, the Borrower shall ensure that the
Project is carried out in accordance with the provisions of Schedule 2
to this Agreement.
Article IV
REMEDIES OF THE BANK
4.01. The Additional Event of Suspension
consists of the following, namely, that the Act or the Statement of
Policy has been amended, suspended, abrogated, repealed or waived so as
to affect materially and adversely the ability of the Borrower to
perform any of its obligations under this Agreement.
4.02. The Additional Event of Acceleration
consists of the following, namely, the event specified in Section 4.01
of this Agreement occurs.
Article V
EFFECTIVENESS; TERMINATION
5.01. The Additional Condition of
Effectiveness consists of the following, namely, that at least one
Subsidiary Loan Agreement between the Borrower and an Original PB has
either been amended, or a new Subsidiary Loan Agreement between the
Borrower and an Original PB has been signed, in form and substance
satisfactory to the Bank.
5.02. The Additional Legal Matter consists
of the following, namely, that the amendment to the Subsidiary Loan
Agreement or the new Subsidiary Loan Agreement referred to in paragraph
(a) of Section 5.01 of this Agreement has been duly authorized by the
Borrower and the respective Original PB and is legally binding upon the
Borrower and the Original PB in accordance with its terms.
5.03. The Effectiveness Deadline is the date ninety (90) days after the date of this Agreement.
Article VI
REPRESENTATIVE; ADDRESSES
6.01. The Borrower’s Representative is the Executive Director of the Borrower’s Fund Managing Division.
6.02. The Borrower’s Address is:
Croatian Bank for
Reconstruction and Development
Strossmayerov trg 9
10000 Zagreb
Republic of Croatia
Facsimile:
(385-1) 4597-882
6.03. The Bank’s Address is:
International Bank for Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America
Cable address: Telex: Facsimile:
INTBAFRAD 248423(MCI) or 1-202-477-6391
Washington, D.C. 64145(MCI)
AGREED at Zagreb, Republic of Croatia, as of the day and year first above written.
INTERNATIONAL BANK FOR
RECONSTRUCTION AND DEVELOPMENT
By Authorized Representative
Name: Hongjoo J. Hahm
Title: Country Manager,
World Bank Office, Croatia
CROATIAN BANK FOR
RECONSTRUCTION AND DEVELOPMENT
By Authorized Representative
Name: Anton Kovačev
Title: President of the Managing Board
By Authorized Representative
Name: Branimir Berković
Title: Senior Executive Director
SCHEDULE 1
PROJECT DESCRIPTION
The objective of the Project is to support
the preservation and growth of exports by providing medium- and
long-term working capital and investment finance to exporters and
foreign exchange earning enterprises.
The Project consists of the Original Project.
SCHEDULE 2
PROJECT EXECUTION
Section I.
IMPLEMENTATION ARRANGEMENTS
A. Institutional Arrangements
1. Except as the Bank shall otherwise
agree, the Borrower shall maintain, until the completion of the Project,
the PIU, and ensure that the PIU functions at all times in a manner and
with staffing and budgetary resources satisfactory to the Bank and
suitable to enable it to implement the Project, including compliance
under the Project with all of the Bank’s fiduciary and safeguard
requirements.
2. The Borrower shall: (i) maintain the
Operational Manual in form and content satisfactory to the Bank: (ii)
duly perform all its obligations under the Operational Manual; and (iii)
not assign, amend, abrogate or waive the Operational Manual or any
provision thereof without obtaining the prior approval of the Bank.
3. For the duration of Project
implementation, the Borrower shall submit, not later than August 15 and
June 30 of each year, respectively, a compliance certificate confirming
ongoing compliance with the laws and regulations of the Guarantor
applicable to the Borrower and providing information on agreed-upon
prudential ratios, as certified by the Borrower’s management on a
semi-annual basis as of June 30 and December 31 of each Fiscal Year.
4. For the purposes of carrying out the Project, the Borrower shall:
(a) select PBs pursuant to the criteria set forth in paragraph B.1 of this Section;
(b) relend to each PB the equivalent of the
proceeds of the Loan allocated to Category (1) set forth in Section IV.A
of this Schedule under a Subsidiary Loan Agreement to be entered into
between the Borrower and each PB, under terms and conditions which shall
have been approved by the Bank, and which shall include without
limitation, those set forth in paragraphs B.2, B.3, B.4 and B.5 of this
Section;
(c) ensure that, except as the Bank shall
otherwise agree, the aggregate amount of all Sub-loans provided to any
one Beneficiary Enterprise, or group of connected Beneficiary
Enterprises, from all PBs, including any Sub-loans made under the
Original Project, shall not exceed the equivalent of Euro 10,000,000;
(d) monitor the overall execution of the
Project and the carrying out by the PBs of their obligations under their
respective Subsidiary Loan Agreements in accordance with policies and
procedures satisfactory to the Bank;
(e) take or cause to be taken all action
necessary or appropriate on its part to enable the PBs to perform in
accordance with the provisions of their respective Subsidiary Loan
Agreements all the obligations of the PBs therein set forth, and not
take or permit to be taken any action which would prevent or interfere
with such performance; and
(f) exercise its rights under the Subsidiary
Loan Agreements in such manner as to protect the interests of the Bank
and the Guarantor and to accomplish the purposes of the Loan, and,
except as the Bank shall otherwise agree, not assign, amend, abrogate or
waive any such Agreement or any provision thereof.
B. Criteria, Terms and Conditions of On-lending to PBs
The criteria and principal terms and
conditions set forth in this Section I.B shall apply for the purposes of
paragraph 4 of Section I.A of this Schedule.
Eligibility Criteria
1. A Subsidiary Loan Agreement may be
entered into with a PB, duly established and operating in the territory
of the Guarantor, in respect of which the Borrower shall have
determined, and the Bank shall have agreed, that:
(a) the PB, during the duration of its Subsidiary Loan Agreement, and except as the Bank shall otherwise agree:
(i) is in compliance with applicable banking
laws and prudential regulations of the Guarantor as confirmed in the
semi-annual financial reports submitted by the PB’s management and duly
certified by the PB’s auditors at the end of each Fiscal Year of the PB;
(ii) is operating pursuant to investment and
lending policies and procedures acceptable to the Bank, the Borrower,
and the Guarantor, and has undertaken to maintain said policies and
procedures;
(iii) has agreed to submit to the Borrower
not later than six (6) months after the end of each Fiscal Year, an
audit report which, unless the Bank shall otherwise agree: (A) covers
two (2) full years of its operations; (B) is prepared by an independent
audit firm in accordance with International Auditing Standards, the
International Financial Reporting Standards, or other statutory
requirements for banks operating in the Guarantor’s territory; and (C)
contains an unqualified audit opinion;
(iv) has adequate organization, management,
staff and other resources necessary for its efficient operation,
including an acceptable level of loan collection; and
(v) applies appropriate procedures for
appraisal, supervision, and monitoring of Sub-projects, including for
the efficient evaluation and supervision of the procurement and
environmental elements of Sub-projects.
Terms
2. The principal amount to be relent out of
the proceeds of the Loan to a PB under a Subsidiary Loan Agreement
shall be: (a) denominated in Euro, Kuna, or Kuna indexed to Euro; and
(b) the equivalent in Euro or Kuna (determined as of the date or
respective dates of repayment of the principal amount of the Loan
specified in Schedule 3 to this Agreement) on account of the cost of
goods, works and non-consulting services to be financed under the
Subsidiary Loan out of the proceeds of the Loan allocated from time to
time to Category (1).
3. Each Subsidiary Loan shall: (a) be
charged on the principal amount thereof withdrawn and outstanding from
time to time, interest at a rate equal at a minimum to the interest rate
of the cost of the Loan to the Borrower plus an on-lending margin
reflecting the Borrower’s administrative costs; and (b) be repaid in
accordance with an amortization schedule, as set forth in the Subsidiary
Loan Agreement, calculated to have a maturity of not less than five (5)
years and not exceeding the maturity of the Loan.
4. The right of a PB to use the proceeds of
the Subsidiary Loan shall be: (i) suspended upon failure of the PB to
perform any of its obligations under its Subsidiary Loan Agreement or to
continue to be in compliance with any of the eligibility criteria set
forth in Section I.B of this Schedule; and (ii) terminated if such right
shall have been suspended pursuant to subparagraph (a) hereof for a
continuous period of sixty (60) days.
Conditions
5. Each Subsidiary Loan Agreement shall contain provisions pursuant to which each PB shall undertake to:
(a) carry out activities under the Project
and conduct its operations and affairs in accordance with appropriate
financial standards and practices, including in accordance with the
provisions of the Anti-Corruption Guidelines applicable to recipients of
Loan proceeds other than the Borrower, with qualified management and
staff in adequate numbers, and in conformity with the investment and
lending policies and procedures referred to in the Operational Manual,
and provide, promptly as needed, the funds, facilities, services and
other resources required for the purpose;
(b) (i) make Sub-loans to Beneficiary
Enterprises on the terms and conditions set forth in the Operational
Manual, including, without limitation, the terms and conditions set
forth in Section I.C of this Schedule;
(ii) ensure that, except as the Bank shall
otherwise agree, the aggregate amount of all Sub-loans provided to any
one Beneficiary Enterprise, or group of connected Beneficiary
Enterprises, including any Sub-loans made under the Original Project,
shall not exceed the equivalent of Euro 10,000,000;
(iii) exercise its rights in relation to each
such Sub-loan in such manner as to protect its interests and the
interests of the Borrower, the Guarantor and the Bank, comply with its
obligations under its respective Subsidiary Loan Agreement and achieve
the purposes of the Project;
(iv) not assign, amend, abrogate or waive any
of its agreements providing for Sub-loans, or any provision thereof,
without the prior approval of the Borrower;
(v) appraise Sub-projects and supervise,
monitor and report on the carrying out by the Beneficiary Enterprises of
Sub-projects, in accordance with the Operational Manual;
(vi) screen proposed Sub-projects, and,
before approving a Sub-project: (aa) ensure that each Beneficiary
Enterprise has carried out an appropriate environmental assessment for
each Sub-project and prepared an adequate environmental management plan,
if required under the EMF and the Operational Manual, including
satisfactory evidence of consultations held and of adequate disclosure
of said plan, or, if not so required provided a satisfactory explanation
as to why an environmental assessment and environmental management plan
is not required for said Sub-project, all in accordance with the
provisions of the EMF and Operational Manual and (bb) verify (through
its own staff, outside experts, or existing environmental institutions)
before approving a Sub-project that the Sub-project meets the
environmental requirements of appropriate national and local authorities
and is consistent with the Bank’s applicable environmental assessment
and safeguard policies and complies with the EMF and the environmental
review procedures set forth in the Operational Manual;
(vii) require each Beneficiary Enterprise
applying for a Sub-loan to furnish evidence satisfactory to the Bank
showing that the Sub-project in respect of which the application has
been prepared is in compliance with the EMF and the environmental review
procedures set forth in the Operational Manual;
(viii) ensure that for Sub-projects which
require an environmental management plan, the Beneficiary Enterprise
shall carry out such environmental management plan in a timely and
appropriate manner, requiring such environmental management plan to be
in compliance with: (aa) the EMF and environmental standards
satisfactory to the Bank; and (bb) the applicable laws and regulations
of the Guarantor relating to health, safety and environmental
protection, and shall include adequate information on the carrying out
of such environmental management plans in the progress reports referred
to in subparagraph (c) (ii) of this paragraph; and
(ix) ensure that: (aa) goods, non-consulting
services, and works to be financed out of the proceeds of the Loan shall
be procured in accordance with the provisions of Section III of this
Schedule; and (bb) such goods, non-consulting services and works shall
be used exclusively in the carrying out of the Sub-project.
(c) (i) exchange views with and furnish all
such information to the Bank or the Borrower, as may be reasonably
requested by the Bank and the Borrower, with regard to the progress of
its activities under the Project, the performance of its obligations
under its respective Subsidiary Loan Agreement, and other matters
relating to the purposes of the Project;
(ii) prepare and submit to the Borrower
semi-annual reports on Sub-loan disbursements and repayments, and annual
reports on the progress made in achieving the objectives outlined in
the business plans submitted with the Sub-loan applications; and
(iii) promptly inform the Bank and the
Borrower of any condition which interferes or threatens to interfere
with the progress of its activities under its respective Subsidiary Loan
Agreement.
(d) (i) maintain records and accounts
adequate to reflect, in accordance with sound accounting practices, its
operations and financial condition; and