HRVATSKI SABOR
159
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O FINANCIRANJU IZMEĐU REPUBLIKE HRVATSKE I EUROPSKE INVESTICIJSKE BANKE ZA PROJEKT »FINANCIRANJE VODNO-KOMUNALNE INFRASTRUKTURE«
Proglašavam Zakon o potvrđivanju Ugovora o financiranju između Republike Hrvatske i Europske investicijske banke za projekt »Financiranje vodno-komunalne infrastrukture«, koji je Hrvatski sabor donio na sjednici 28. listopada 2011. godine.
Klasa: 011-01/11-01/228
Urbroj: 71-05-03/1-11-2
Zagreb, 4. studenoga 2011.
Predsjednik
Republike Hrvatske
prof. dr. sc. Ivo Josipović, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O FINANCIRANJU IZMEĐU REPUBLIKE HRVATSKE I EUROPSKE INVESTICIJSKE BANKE ZA PROJEKT »FINANCIRANJE VODNO-KOMUNALNE INFRASTRUKTURE«
Članak 1.
Potvrđuje se Ugovor o financiranju između Republike Hrvatske i Europske investicijske banke za Projekt »Financiranje vodno-komunalne infrastrukture«, potpisan u Luxembourgu 18. listopada 2011. i u Zagrebu 18. listopada 2011., u izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
FI N° 31.176 (HR)
Serapis N° 2009-0032
MUNICIPAL WATER FINANCING FACILITY
Finance Contract between the Republic of Croatia and the European Investment Bank
THIS CONTRACT IS MADE BETWEEN:
the Republic of Croatia, acting by and through its Ministry of Finance, represented by Ms Martina Dalić, Minister of Finance,
(the «Borrower»)
of the first part, and
The European Investment Bank having its seat at 100 blvd Konrad Adenauer, Luxembourg, L-2950 Luxembourg, represented by Mr Dominique Courbin, Head of Division and by Mr Massimo Novo, Head of Division, (the «Bank»)
of the second part.
WHEREAS:
(1) The Borrower has stated that it is undertaking a project (the «Project») for financing improvements in water supply systems, waste water collection and treatment as well as storm water disposal in municipalities located in all Croatian counties (with the exception of Zagreb), to be carried out by Local Self Government Units (municipalities and towns), LSGU, represented by Utility Companies (the «UC» and, hereinafter, the «Final Beneficiary/ies») throughout Croatia (hereafter, the «Sub-Project/s»), as more particularly described in the technical description (the «Technical Description») set out in Schedule A.
(2) The total cost of the Project is estimated by the Bank to be EUR 150,000,000.00 (one hundred fifty million euros) and the Borrower has stated that it intends to finance the Project as follow
(3) In order to fulfil the financing plan set out in Recital (2), the Borrower has requested from the Bank a credit of EUR 75,000,000.00 (seventy five million euros).
(4) The Republic of Croatia and the Bank concluded on 13 December 2000 a Framework Agreement governing the Bank’s activities in the Republic of Croatia (hereinafter the «Framework Agreement») as ratified by law adopted on 3 May 2001 by the Croatian Parliament, and published in the Croatian official gazette «Narodne novine – međunarodni ugovori» No. 6/2001 dated 23 May 2001.
(5) The Croatian Ministry of Regional Development, Forestry and Water Management (hereinafter the «MRDFWM»), which is responsible for the water management sector, is the promoter of the Project, while Croatian Waters (hereinafter «CW») as a national agency for water management, carrying out the water management infrastructure investments, will be promoter of the Sub-Projects to be financed under this Finance Contract; a new dedicated Project Implementation Unit (hereafter the «PIU»), comprised of staff members having appropriate international experience, will be established within CW to ensure the effective completion and the start of operation of the facilities comprised in the Sub-Projects. The tasks and role of the PIU within CW, as well as the role of the MRDFWM and the Ministry of Finance will be defined under the Project Agreement (as defined below).
(6) By Article 3 of the Framework Agreement, the Republic of Croatia agreed that interest and all other payments due to the Bank and arising out of activities envisaged by the Framework Agreement, as well as the assets and revenues of the Bank connected with such activities, shall be exempt from tax.
(7) By Article 4 of the Framework Agreement, the Republic of Croatia agreed that throughout the life of any financial operation concluded pursuant to the Framework Agreement it shall:
(a) ensure (i) that Final Beneficiaries may convert into any fully convertible currency, at the prevailing market exchange rate on the due date, the amounts in the national currency of Croatia necessary for the timely payment of all sums due to the Bank in respect of loans and guarantees in connection with any project; and (ii) that such amounts shall be freely, immediately and effectively transferable;
(b) ensure (i) that the Bank may convert into any fully convertible currency, at the prevailing market exchange rate, the amounts in the national currency of Croatia received by the Bank by way of payments arising in respect of loans and guarantees or any other activity and that the Bank may freely, immediately and effectively transfer the amounts so converted; or, at the Bank’s option, (ii) that it may freely dispose of such amounts within the territory of Croatia; and (iii) that the Bank may convert into the national currency of Croatia, at the prevailing market exchange rate, any amounts in any fully convertible currency.
(8) The Bank considering that the financing of the Project falls within the scope of its functions and it conforms to the aims of the Framework Agreement, and having regard to the statements and facts cited in these Recitals, has decided to give effect to the Borrower’s request providing to it a credit in an amount of or equivalent to EUR 75,000,000.00 (seventy five million euros) under this Finance Contract (the «Contract»); provided that (i) the amount of the Bank loan shall not, in any case, exceed 50% (fifty per cent) of the total cost of the Project set out in Recital (2) and (ii) the amount of each drawdown in respect of a Sub-Project shall not exceed 50 per cent. of the eligible Sub-Project cost. In the event that any individual Sub-Project receives support under any European Union Instrument of Pre-Accession Assistance (IPA) or through other European Union support schemes, the combined financial contribution from the Bank and the European Union shall remain below 90% of such individual Sub-Project cost.
(9) The Statute of the Bank provides that the Bank shall ensure that its funds are used as rationally as possible in the interests of the European Union (the «Union»); and, accordingly, the terms and conditions of the Bank’s loan operations must be consistent with relevant Union policies.
(10) The Borrower confirms the Bank’s preferred creditor status as an international financial institution.
(11) References in this Contract to Articles, Recitals, Schedules and Annexes are, save if explicitly stipulated otherwise, references respectively to articles of, and recitals, schedules and annexes to this Contract.
(12) In this Contract:
«Acceptance Deadline» for a notice means:
(i) 16h00 Luxembourg time on the day of delivery, if the notice is delivered by 14h00 Luxembourg time on a Business Day; or
(ii) 11h00 Luxembourg time on the next following day which is a Business Day, if the notice is delivered after 14h00 Luxembourg time on any such day or is delivered on a day which is not a Business Day.
«Accounting Date» means 31 December 2011.
«Affected Sub-Project» has the meaning given to it in Article 4.03A(3).
«Allocation» has the meaning given to it in Article 1.09B.
«Allocation Letter» has the meaning given to it in Article 1.09B.
«Allocation Period» has the meaning given to it in Article 1.09A.
«Allocation Request» has the meaning given to it in Article 1.09A.
«Birds Directive» means Directive 79/409/CEE.
«Business Day» means a day (other than a Saturday or Sunday) on which the Bank and commercial banks are open for general business in Luxembourg.
«Change-of-Law Event» has the meaning given to it in Article 4.03A(4).
«Contract» has the meaning given to it in Recital (8).
«Credit» has the meaning given to it in Article 1.01.
«CW» has the meaning given to it in Recital (5).
«Disbursement Notice» means a notice from the Bank to the Borrower pursuant to and in accordance with Article 1.02C.
«Disbursement Request» means a notice substantially in the form set out in Schedule C.1.
«Disruption Event» means either or both of:
(a) a material disruption to those payment or communications systems or to those financial markets which are, in each case, required to operate in order for payments to be made in connection with this Contract; or
(b) the occurrence of any other event which results in a disruption (of a technical or systems-related nature) to the treasury or payments operations of either the Bank or the Borrower, preventing that party:
(i) from performing its payment obligations under this Contract; or
(ii) from communicating with other parties,
and which disruption (in either such case as per (a) or (b) above) is not caused by, and is beyond the control of, the party whose operations are disrupted.
«EIA» means the Environmental Impact Assessment in accordance with Directive 83/337/CEE as subsequently amended.
«EIB Allocation Report» has the meaning given to it in Article 1.11.
«Environment» means the following, in so far as they affect human well-being: (a) fauna and flora; (b) soil, water, air, climate and the landscape; and (c) cultural heritage and the built environment and includes occupational health and safety and the Project’s social effects.
«Environmental Law» means EU law and the Croatian national laws and regulations save for any derogations agreed between Croatia and the EU, as well as applicable international treaties, of which a principal objective is the preservation, protection or improvement of the Environment.
«EURIBOR» has the meaning given to it in Schedule B.
«External Debt Instrument» has the meaning given to it in Article 7.01.
«Final Availability Date» means 15 October 2015.
«Final Beneficiary/ies» has the meaning given to it in Recital (1).
«Fixed Rate» means an annual interest rate determined by the Bank in accordance with the applicable principles from time to time laid down by the governing bodies of the Bank for loans made at a fixed rate of interest, denominated in the currency of the Tranche and bearing equivalent terms for the repayment of capital and the payment of interest.
«Fixed Rate Tranche» means a Tranche disbursed on a Fixed Rate basis.
«Floating Rate» means a fixed-spread floating interest rate, that is to say an annual interest rate equal to EURIBOR plus or minus the Spread, determined by the Bank for each successive Floating Rate Reference Period.
«Floating Rate Reference Period» means each period from one Payment Date to the next relevant Payment Date and the first Floating Rate Reference Period shall commence on the date of disbursement of the Tranche.
«Floating Rate Tranche» means a Tranche disbursed on a Floating Rate basis.
«Framework Agreement» has the meaning given to it in Recital (4).
«Habitat Directive» meansDirective 92/43/CEE.
«Indemnifiable Prepayment Event» means a prepayment event under Article 4.03A other than paragraphs 4.03A(1) and 4.03A(2).
«Interest Revision/Conversion» means the determination of new financial conditions relative to the interest rate, specifically the same interest rate basis (»revision») or a different interest rate basis (»conversion») which can be offered for the remaining term of a Tranche or until a next Interest Revision/Conversion Date, if any.
«Interest Revision/Conversion Date» means the date, being a Payment Date, specified by the Bank pursuant to Article 1.02B in the Disbursement Notice or pursuant to Article 3 and Schedule D.
«Interest Revision/Conversion Proposal» means a proposal made by the Bank under Schedule D, for an amount which, at the proposed Interest Revision/Conversion Date, is not less than EUR 10.000.000 (ten million euros) or the equivalent thereof.
«Interest Revision/Conversion Request» means a written notice from the Borrower, delivered at least 75 (seventy-five) days before an Interest Revision/Conversion Date, requesting the Bank to submit to it an Interest Revision/Conversion Proposal. The Interest Revision/Conversion Request shall also specify:
(i) Payment Dates chosen in accordance with the provisions of Article 3.01;
(ii) the preferred repayment schedule chosen in accordance with Article 4.01; and
(iii) any further Interest Revision/Conversion Date chosen in accordance with Article 3.01.
«Loan» means the aggregate amount of Tranches disbursed from time to time by the Bank under this Contract.
«LSGU» means the Local Self Government Units, represented by Utilities Companies, i.e. the Final Beneficiaries of this Loan.
«Market Disruption Event» means in relation to a specific Notified Tranche or to a Tranche in respect of which an Interest Revision/Conversion Proposal has been accepted by the Borrower in accordance with Schedule D:
(a) there are, in the reasonable opinion of the Bank, exceptional circumstances adversely affecting the Bank’s access to its sources of funding;
(b) in the opinion of the Bank, funds are not available from its ordinary sources of funding to fund such Tranche in the relevant currency and/or for the relevant maturity and/or in relation to the reimbursement profile of such Tranche;
(c) in relation to Tranche in respect of which interest is payable at Floating Rate:
(A) the cost to the Bank of obtaining funds from its sources of funding, as determined by the Bank, for a period equal to the Floating Rate Reference Period of a Tranche (i.e. in the money market) would be in excess of the applicable EURIBOR;
or
(B) the Bank determines that adequate and fair means do not exist for ascertaining the applicable EURIBOR for the relevant currency of such Tranche or it is not possible to determine the EURIBOR in accordance with the definition contained in Schedule B.
«Material Adverse Change» means, in relation to the Borrower, any event or change of condition, as compared with its condition at the date of this Contract, affecting the Borrower, which, in the opinion of the Bank: (1) materially impairs the ability of the Borrower to perform its financial or any of its other obligations under this Contract; (2) materially impairs the financial condition of the Borrower; or (3) adversely affects any security provided by the Borrower.
«Maturity Date» means the last repayment date of a Tranche specified pursuant to Article 4.01(b)(iii).
«MRDFWM» has the meaning given to it in Recital (5).
«Notified Tranche» means a Tranche in respect of which the Bank has issued a Disbursement Notice.
«Payment Date» means the annual, semi-annual or quarterly dates specified in the Disbursement Notice until the Interest Revision/Conversion Date, if any, or the Maturity Date, save that, in case any such date is not a Relevant Business Day, it means:
(i) for a Fixed Rate Tranche, the following Relevant Business Day, without adjustment to the interest due under Article 3.01; and
(ii) for a Floating Rate Tranche, the next day, if any, of that calendar month that is a Relevant Business Day or, failing that, the nearest preceding day that is a Relevant Business Day, in all cases with corresponding adjustment to the interest due under Article 3.01.
«PIU» has the meaning given to it in Recital (5).
«Prepayment Amount» means the amount of a Tranche to be prepaid by the Borrower in accordance with Article 4.02A.
«Prepayment Date» means the date, which shall be a Payment Date, on which the Borrower proposes to effect prepayment of a Prepayment Amount.
«Prepayment Notice» means a written notice from the Borrower specifying, amongst other things, the Prepayment Amount and the Prepayment Date in accordance with Article 4.02A.
«Project» has the meaning given to it in Recital (1).
«Project Agreement» means the agreement to be entered into between CW, the MRDFWM and the Ministry of Finance, defining the tasks and role of the PIU within CW, as well as the role of the MRDFWM and the Ministry of Finance in respect of the Project, in form and substance satisfactory to the Bank.
«Redeployment Rate» means the Fixed Rate in effect on the day of the indemnity calculation for fixed-rate loans denominated in the same currency and which shall have the same terms for the payment of interest and the same repayment profile to the Interest Revision/Conversion Date, if any, or the Maturity Date as the Prepayment Amount. For those cases where the period is shorter than the minimum intervals described under Article 3.01 the most closely corresponding money market rate equivalent will be used, that is EURIBOR minus 0.125% (12.5 basis points) for periods of up to 12 (twelve) months. For periods falling between 13 and 36/48 months respectively, the bid point on the swap rates as published by Intercapital in Reuters for the related currency and observed by the Bank at the time of calculation will apply.
«Relevant Business Day» means:
(i) for EUR, a day which is a business day according to the TARGET operating days calendar; and
(ii) for any other currency, a day on which banks are open for general business in the principal domestic financial centre of the relevant currency.
«Scheduled Disbursement Date» means the date on which a Tranche is scheduled to be disbursed in accordance with Article 1.02B.
«Security» and «Security Interest» means any mortgage, pledge, lien, charge, assignment, hypothecation or security interest or any other agreement or arrangement having the effect of conferring security.
«Sub-Project/s» has the meaning given to it in Recital (1), and in particular means projects aimed at rehabilitation and up-grading of smaller water supply, waste water and storm water systems by LSGUs located in all Croatian counties, with the exception of the capital city.
«Spread» means the fixed spread to EURIBOR (being either plus or minus) determined by the Bank and notified to the Borrower in the relevant Disbursement Notice or Interest Revision/Conversion Proposal.
«TARGET» means Trans-European Automated Real-Time Gross Settlement Payment System (TARGET).
«Technical Description» has the meaning given to it in Recital (1).
«Term Loan» has the meaning given to it in Article 4.03A(2).
«Tranche» means each disbursement made or to be made under this Contract.
«UC» has the meaning given to it in Recital (1).
«Union» has the meaning given to it in Recital (9).
NOW THEREFORE it is hereby agreed as follows:
Article 1
CREDIT AND DISBURSEMENT
1.01 Amount of Credit
By this Contract the Bank establishes in favour of the Borrower, and the Borrower accepts, the credit in an amount of or equivalent to EUR 75,000,000.00 (seventy five million euros) for the financing of the Project (the «Credit»).
1.02 Disbursement procedure
1.02A Tranches
The Bank shall disburse the Credit in one or several Tranches. The amount of each Tranche, if not being the undrawn balance of the Credit, shall be in a minimum amount of or equivalent to EUR 10,000,000.00 (ten million euros) for any Tranche, provided that the amount of the first Tranche shall not exceed EUR 22,500,000.00 (twenty two million five hundred thousand euros).
1.02B Disbursement Request
(a) From time to time up to 15 (fifteen) days before the Final Availability Date, the Borrower, through the Ministry of Finance, may present to the Bank a Disbursement Request for the disbursement of a Tranche. The Disbursement Request shall specify:
(i) the amount of the Tranche;
(ii) the preferred disbursement date for the Tranche, which shall be a Relevant Business Day falling at least 15 (fifteen) days after the date of the Disbursement Request and on or before the Final Availability Date, it being understood that the Bank may disburse the Tranche up to 4 (four) calendar months from the date of the Disbursement Request;
(iii) whether the Tranche is a Fixed Rate Tranche or a Floating Rate Tranche, each pursuant to the relevant provisions of Article 3.01;
(iv) the preferred interest payment periodicity for the Tranche, chosen in accordance with Article 3.01;
(v) the preferred terms for repayment of principal for the Tranche, chosen in accordance with Article 4.01;
(vi) the preferred first and last dates for repayment of principal for the Tranche;
(vii) the Borrower’s choice of Interest Revision/Conversion Date, if any, for the Tranche; and
(viii) the IBAN code (or appropriate format in line with local banking practice) and SWIFT BIC of the bank account to which disbursement of the Tranche should be made in accordance with Article 1.02D.
(b) The Borrower may also at its discretion specify in the Disbursement Request the following respective elements, if any, as provided by the Bank on an indicative basis and without commitment, to be applicable to the Tranche, that is to say:
(i) in the case of a Fixed Rate Tranche, the fixed interest rate; and
(ii) in the case of a Floating Rate Tranche, the Spread,
applicable to the Tranche until the Maturity Date or until the Interest Revision/Conversion Date, if any.
(c) Each Disbursement Request shall be accompanied by evidence of the authority of the person or persons authorised to sign it and the specimen signature of such person or persons.
(d) Each Disbursement Request shall contain, or shall be accompanied by, a declaration, duly signed on behalf of the Borrower, confirming that the amount of the Tranche to be disbursed shall be used to fund the Sub-Projects in respect of which Allocation Letters have been issued and for the amounts specified therein.
(e) Subject to Article 1.02C(b), each Disbursement Request is irrevocable.
1.02C Disbursement Notice
(a) Not less than 10 (ten) days before the proposed Scheduled Disbursement Date of a Tranche the Bank shall, if the Disbursement Request conforms to this Article 1.02, deliver to the Borrower a Disbursement Notice which shall specify:
(i) the currency and amount of the Tranche;
(ii) the Scheduled Disbursement Date;
(iii) the interest rate basis for the Tranche;
(iv) the first interest Payment Date and the periodicity for the payment of interest for the Tranche;
(v) the terms for repayment of principal for the Tranche;
(vi) the first and last dates for repayment of principal for the Tranche;
(vii) the applicable Payment Dates for the Tranche;
(viii) the Interest Revision/Conversion Date, if requested by the Borr(ix) for a Fixed Rate Tranche the Fixed Rate and for a Floating Rate Tranche the Spread.
(b) If one or more of the elements specified in the Disbursement Notice does not reflect the corresponding element, if any, in the Disbursement Request, the Borrower may following receipt of the Disbursement Notice revoke the Disbursement Request by written notice to the Bank to be received no later than 12h00 Luxembourg time on the next Business Day and thereupon the Disbursement Request and the Disbursement Notice shall be of no effect. If the Borrower has not revoked in writing the Disbursement Request within such period, the Borrower will be deemed to have accepted all elements specified in the Disbursement Notice.
(c) If the Borrower has presented to the Bank a Disbursement Request in which the Borrower has not specified the elements referred to in Article 1.02B(b), the Borrower will be deemed to have agreed in advance to the corresponding element as subsequently specified in the Disbursement Notice.
1.02D Disbursement Account
Disbursement shall be made to the account of the Borrower as the Borrower shall notify in writing to the Bank not later than 15 (fifteen) days before the Scheduled Disbursement Date (with IBAN code or with the appropriate format in line with local banking practice).
Only one account may be specified for each Tranche.
1.03 Currency of disbursement
The Bank shall disburse each Tranche in EUR.
1.04 Conditions of disbursement
1.04A First Tranche
The disbursement of the first Tranche under Article 1.02 is conditional upon receipt by the Bank in form and substance satisfactory to it, together with the Disbursement Request, of the following documents or evidence:
(a) evidence satisfactory to the Bank that the execution of this Contract by the Borrower has been duly authorised and that the person or persons signing the Contract on behalf of the Borrower is/are duly authorised to do so together with the specimen signature of each such person or persons;
(b) a legal opinion, in the English language, issued by or behalf of the Minister of Justice of Croatia on the due execution of this Contract by the Borrower, confirming (i) that its provisions are in full force and effect, (ii) that this Contract is valid, binding and enforceable in the Republic of Croatia in accordance with its terms, (iii) that the financing to be provided under this Contract falls within the scope of the Framework Agreement, and (iv) that no exchange control restrictions are in place or consents are required in order to permit the receipt of all amounts to be disbursed hereunder and to permit the repayment of the Loan and the payment of interest and all other amounts due under this Contract;
(c) evidence that the Borrower has obtained all necessary consents, authorisations, licences or approvals of governmental or public bodies or authorities required in connection with this Contract and the Project;
(d) evidence that a properly staffed PIU, to the satisfaction of the Bank, has been established within CW to ensure the effective delivery of the Project, including start of operation. The terms of reference of such PIU shall include, inter alia, responsibility for:
(i) Sub-project identification and verification of compliance with the Bank’s eligibility criteria;
(ii) compliance with EU procurement and Environmental Directives;
(iii) allocation and disbursement procedures, including information provided by the LSGUs, represented by the UCs, in a format acceptable to the Bank; and
(iv) regular monitoring and reporting requirements of the Bank; and
(e) a certified copy of the Project Agreement, together with a notarised translation in English thereof.
1.04B All Tranches including the first
The disbursement of each Tranche under Article 1.02, including the first, is conditional upon:
(a) receipt by the Bank in form and substance satisfactory to it, together with the Disbursement Request for the proposed Tranche, of the following documents or evidence:
(i) a certificate from the Borrower in the form of Schedule C.2; and
(ii) evidence demonstrating that, following drawdown of the relevant Tranche, the aggregate amount of the Loan or Loans will not exceed the aggregate expenditure incurred or contractually committed by the Borrower in respect of the Project up to the date of the relevant Disbursement Request; and
(b) that on the Scheduled Disbursement Date for the proposed Tranche:
(i) the representations and warranties which are repeated pursuant to Article 6.08 are correct in all material respects; and
(ii) no event or circumstance which constitutes or would with the passage of time or giving of notice under this Contract constitute an event of default under Article 10.01 or a prepayment event under Article 4.03 has occurred and is continuing unremedied or unwaived or would result from the proposed Tranche.
1.04C All Tranches excluding the first
The disbursement of each Tranche under Article 1.02, excluding the first, is subject to:
a) the Bank having received from the Borrower, on or before the date of the relevant Disbursement Request, evidence satisfactory to the Bank to the effect that (i) at least 80 per cent of the aggregate amount of all the preceding Tranches has been fully allocated to Sub-Projects that are eligible under this Contract, or (ii) at least 50 per cent of the aggregate amount of all the preceding Tranches has been fully disbursed by the Borrower to Final Beneficiaries in each case within the limit of the portion of the Credit specified in the relevant Allocation Letter;
b) the Bank having received from the Borrower, on or before the date of the relevant Disbursement Request, a list of the Sub-Projects financed by the Bank with previous Tranches under this Contract, indicating, for each Sub-Project:
(i) whether an EIA, according to the provisions of Directive 83/337/CEE as subsequently amended, was required or not,
(ii) whether an assessment on impact on nature, according to the provisions of the Habitat Directive and the Birds Directive, was required or not; and
(iii) evidence that the terms of the financing agreements with the relevant Final Beneficiaries include provisions aimed at ensuring operational sustainability and an appropriate level of cost recovery, as per the information requirements specified in Schedule A3; and
(c) the Bank having sent to the Borrower, following receipt of the relevant Allocation Requests, the Allocation Letter confirming the eligibility of the Sub-Projects in relation to which the disbursement is requested by the Borrower.
1.05 Deferment of disbursement
1.05A Grounds for deferment
Upon the written request of the Borrower, the Bank shall defer the disbursement of any Notified Tranche in whole or in part to a date specified by the Borrower being a date falling not later than 6 (six) months from its Scheduled Disbursement Date. In such case, the Borrower shall pay the deferment indemnity as determined pursuant to Article 1.05B below.
Any request for deferment shall have effect in respect of a Tranche only if it is made at least 5 (five) Business Days before its Scheduled Disbursement Date.
If any of the conditions referred to in Article 1.04 is not fulfilled as at the specified date and at the Scheduled Disbursement Date, and the Bank is of the opinion that it will not be satisfied, disbursement will be deferred to a date agreed between the Bank and the Borrower falling not earlier than 5 (five) Business Days following the fulfilment of all conditions of disbursement.
1.05B Deferment indemnity
If the disbursement of any Notified Tranche is deferred, whether at the request of the Borrower or by reason of non-fulfilment of the conditions of disbursement, the Borrower shall, upon demand by the Bank, pay an indemnity on the amount of disbursement deferred. Such indemnity shall accrue from the Scheduled Disbursement Date to the actual disbursement date or, as the case may be, until the date of cancellation of the Notified Tranche in accordance with this Contract at a rate equal to R1 minus R2, where:
«R1» means the rate of interest that would have applied from time to time pursuant to Article 3.01 and, if the Tranche had been disbursed on the Scheduled Disbursement Date; and
«R2» means EURIBOR less 0.125% (12.5 basis points); provided that for the purpose of determining the EURIBOR in relation to this Article 1.05, the relevant periods provided for in Schedule B shall be successive periods of 1 (one) month commencing on the Scheduled Disbursement Date.
Furthermore, the indemnity:
(a) if the deferment exceeds one (1) month in duration, shall accrue at the end of every month;
(b) shall be calculated using the day count convention applicable to R1;
(c) where R2 exceeds R1, shall be set at zero; and
(d) shall be payable in accordance with Article 1.08.
1.05C Cancellation of disbursement deferred by 6 (six) months
The Bank may, by notice in writing to the Borrower, cancel a disbursement which has been deferred under Article 1.05A by more than 6 (six) months in aggregate. The cancelled amount shall remain available for disbursement under Article 1.02.
1.06 Cancellation and suspension
1.06A Borrower’s right to cancel
The Borrower may at any time by notice in writing to the Bank cancel, in whole or in part and with immediate effect, the undisbursed portion of the Credit. However, the notice shall have no effect in respect of a Notified Tranche which has a Scheduled Disbursement Date falling within 5 (five) Business Days of the date of the notice.
1.06B Bank’s right to suspend and cancel
(a) The Bank may, by notice in writing to the Borrower, suspend and/or cancel the undisbursed portion of the Credit in whole or in part at any time and with immediate effect:
(i) upon the occurrence of an event or circumstance mentioned in Article 4.03A or Article 10.01 or an event or circumstance which would with the passage of time or giving of notice under this Contract constitute an event under Article 4.03A or an event of default under Article 10.01;
(ii) if a Material Adverse Change occurs.
(b) Any suspension shall continue until the Bank ends the suspension or cancels the suspended amount.
1.06C Indemnity for suspension and cancellation of a Tranche
1.06C(1) SUSPENSION
If the Bank suspends a Notified Tranche, whether upon an Indemnifiable Prepayment Event or an event mentioned in Article 10.01, the Borrower shall indemnify the Bank under Article 1.05B.
1.06C(2) CANCELLATION
If pursuant to Article 1.06A, the Borrower cancels:
(a) a Fixed Rate Notified Tranche, it shall indemnify the Bank under Article 4.02B;
(b) a Floating Rate Notified Tranche or any part of the Credit other than a Notified Tranche, no indemnity is payable.
If the Bank cancels a Fixed Rate Notified Tranche upon an Indemnifiable Prepayment Event or pursuant to Article 1.05C, the Borrower shall indemnify the Bank under Article 4.02B. If the Bank cancels a Notified Tranche upon an event mentioned in Article 10.01, the Borrower shall indemnify the Bank under Article 10.03. Save in these cases, no indemnity is payable upon cancellation of a Tranche by the Bank.
An indemnity shall be calculated on the basis that the cancelled amount is deemed to have been disbursed and repaid on the Scheduled Disbursement Date or, to the extent that the disbursement of the Tranche is currently deferred or suspended, on the date of the cancellation notice.
1.07 Cancellation after expiry of the Credit
Without prejudice to Article 1.09A, any time following the expiry of a period of 4 (four) months after the Final Availability Date, the Bank may by notice to the Borrower and without liability arising on the part of either party, cancel any part of the Credit in respect of which no Disbursement Request has been made in accordance with Article 1.02B.
1.08 Sums due under Article 1
Sums due under Articles 1.05 and 1.06 shall be payable in the currency of the Tranche concerned. They shall be payable within 7 (seven) days of the Borrower’s receipt of the Bank’s demand or within any longer period specified in the Bank’s demand.
1.09 Allocation Procedure
1.09A Submission of Sub-Projects
Between the present date and 15 April 2015 (such period being the «Allocation Period»), the Borrower through the MRDFWM shall submit for approval of the Bank one or more allocation requests (each one, an «Allocation Request»), one for each Sub-Project, in respect of which it seeks finance under this Contract indicating the amount of the Credit requested in respect of the Sub-Project, such within the limit of 50 per cent of the eligible Sub-Project cost. The Sub-Projects shall be eligible for financing from the Bank in accordance with Schedule A.
Each Allocation Request shall be supported by a fiche, containing the information in content and form which the Bank shall notify from time to time to the Borrower as specified in Schedule A.3.
Before submitting to the Bank an Allocation Request for approval:
A) in relation to Sub-Projects with an investment cost exceeding EUR 3,000,000.00 or with a specific cost exceeding EUR 3,000 per capita, the Borrower shall:
(i) when an EIA is required, submit to the Bank the Non-Technical Summary of the EIA; and
(ii) submit to the Bank Forms A or B from the assessment, according to the EU Habitats and Birds Directives;
B) in relation to Sub-Projects with project cost up to EUR 3,000,000.00 and with a specific cost up to EUR 3,000 per capita, the Borrower shall:
(i) deliver to the Bank a declaration issued by the competent authority based on a list of Sub-Projects as to whether an EIA is required or not;
(ii) for Sub-Projects with no effect, potential or likely, on a conservation site, deliver to the Bank a declaration issued by the competent authority based on a list of Sub-Projects to ensure that the Sub-Projects comply with the EU Habitats and Birds Directives; and
(iii) for Sub-Projects with an effect on conservation sites, submit Form B individually for each Sub-Project, duly signed by the competent authority.
The Borrower shall procure that the MRDFWM:
(i) shall not commit any part of the financing provided hereunder to Sub-Projects that require an EIA or biodiversity assessment according to EU and national law without, prior to such commitment, (i) receiving consent from the competent authority and (ii) the Non-Technical Summary of the EIA having been made available to the public;
(ii) for each Sub-Project (or set thereof located in the same Municipality), submits to the Bank evidence satisfactory to the Bank showing that full coverage of operation maintenance costs will be achieved through tariffs or, where this is not affordable for the average household, through a combination of tariffs and reliable budget transfers defined ex ante, and provides information on full cost recovery (including capital and financial costs) through a combination of charges and national or local subsidies. To this end, the Borrower shall procure that the MRDFWM includes appropriate terms in its financing agreement with the Final Beneficiaries aimed at ensuring operational and financial sustainability.
If the Borrower has not delivered by 15 April 2015 an Allocation Request for any part of the Credit, the Bank may by one month’s notice cancel that part of the Credit unless, within the one-month period, the Borrower delivers an Allocation Request in respect thereof.
1.09B Allocation
If an Allocation Request for a Sub-Project submitted to the Bank pursuant to Article 1.09A above is approved by the Bank, the Bank shall notify the Borrower, through the MRDFWM, by way of a letter of allocation (hereafter, each an «Allocation Letter») stating:
(i) that the Sub-Projects are approved; and
(ii) the portion of the Credit which the Bank allocates to the Sub-Projects (each such portion being hereafter called an «Allocation», which term shall include a re-employment of funds under Article 6.02).
1.10 Reallocation
The Borrower may at its discretion, at any time before the 15 April 2015, reallocate in accordance with Article 1.09 any part of the Credit already allocated but in respect of which no disbursement has been made by the Borrower to a Final Beneficiary.
1.11 EIB Allocation Report
(a) The Borrower shall establish and maintain an internal reporting system for the monitoring of the Allocations (the «EIB Allocation Report») in the form agreed from time to time between the Bank and the Borrower.
(b) The EIB Allocation Report shall contain the name of each Final Beneficiary, the dates and amounts of allocations and disbursements by the Borrower to the respective Final Beneficiary (as further outlined in Schedule A.4);
(c) the Borrower shall provide the Bank with the EIB Allocation Report including information on all Sub-Projects to which allocations have been made under this Contract at the Bank’s request and in any case not later than three months from the end of the allocation Period or attached to the Disbursement Request for the last Tranche.
Article 2
THE LOAN
2.01 Amount of Loan
The Loan shall comprise the aggregate amount of Tranches disbursed by the Bank under the Credit, as confirmed by the Bank pursuant to Article 2.03.
2.02 Currency of repayment, interest and other charges
Interest, repayments and other charges payable in respect of each Tranche shall be made by the Borrower in the currency of the Tranche.
Any other payment shall be made in the currency specified by the Bank having regard to the currency of the expenditure to be reimbursed by means of that payment.
2.03 Confirmation by the Bank
Within 10 (ten) days after disbursement of each Tranche, the Bank shall deliver to the Borrower the amortisation table referred to in Article 4.01, if appropriate, showing the disbursement date, currency, the amount disbursed, the repayment terms and the interest rate of and for that Tranche.
Article 3
INTEREST
3.01 Rate of interest
Fixed Rates and Spreads are available for periods of not less than 4 (four) years or, in the absence of a repayment of principal during that period, not less than 3 (three) years.
3.01A Fixed Rate Tranches
The Borrower shall pay interest on the outstanding balance of each Fixed Rate Tranche at the Fixed Rate quarterly, semi-annually or annually in arrears on the relevant Payment Dates as specified in the Disbursement Notice, commencing on the first such Payment Date following the date on which the disbursement of the Tranche was made.
If the period from the date on which disbursement was made to the first Payment Date is 15 (fifteen) days or less then the payment of interest accrued during such period shall be postponed to the following Payment Date.
Interest shall be calculated on the basis of Article 5.01(a) at an annual rate that is the Fixed Rate.
3.01B Floating Rate Tranches
The Borrower shall pay interest on the outstanding balance of each Floating Rate Tranche at the Floating Rate quarterly, semi-annually or annually in arrears on the relevant Payment Dates, as specified in the Disbursement Notice commencing on the first such Payment Date following the date of disbursement of the Tranche.
If the period from the date of disbursement to the first Payment Date 15 (fifteen) days or less then the payment of interest accrued during such period shall be postponed to the following Payment Date.
The Bank shall notify the Floating Rate to the Borrower within 10 (ten) days following the commencement of each Floating Rate Reference Period.
If pursuant to Articles 1.05 and 1.06 disbursement of any Floating Rate Tranche takes place after the Scheduled Disbursement Date the interest rate applicable to the first Floating Rate Reference Period shall be determined as though disbursement had taken place on the Scheduled Disbursement Date.
Interest shall be calculated in respect of each Floating Rate Reference Period on the basis of Article 5.01(b).
3.01C Revision or Conversion of Tranches
Where the Borrower exercises an option to revise or convert the interest rate basis of a Tranche, it shall, from the effective Interest Revision/Conversion Date (in accordance with the procedure set out in Schedule D) pay interest at a rate
3.02 Interest on overdue sums
Without prejudice to Article 10 and by way of exception to Article 3.01, interest shall accrue on any overdue sum payable under the terms of this Contract from the due date to the date of payment at an annual rate equal to EURIBOR plus 2% (200 basis points) and shall be payable in accordance with the demand of the Bank. For the purpose of determining EURIBOR in relation to this Article 3.02, the relevant periods within the meaning of Schedule B shall be successive periods of one month commencing on the due date.
However, interest on a Fixed Rate Tranche shall be charged at the annual rate that is the sum of the rate defined in Article 3.01A plus 0.25% (25 basis points) if that annual rate exceeds, for any given relevant period, the rate specified in the preceding paragraph.
If the overdue sum is in a currency other than the currency of the Loan, the following rate per annum shall apply, namely the relevant interbank rate that is generally retained by the Bank for transactions in that currency plus 2% (200 basis points), calculated in accordance with the market practice for such rate.
3.03 Market Disruption Event
If at any time between the date of issuance by the Bank of a Disbursement Notice in respect of a Tranche or the date that an Interest Revision/Conversion Proposal is accepted by the Borrower in accordance with Schedule D, and the date falling two Business Days prior to the Scheduled Disbursement Date or the relevant Interest Revision/Conversion Date, a Market Disruption Event occurs, the Bank may notify to the Borrower that this clause has come into effect. In such case, the following rules shall apply: the rate of interest applicable to such Notified Tranche or Tranche subject to Interest Revision/Conversion until the Maturity Date or the Interest Revision /Conversion Date if any, shall be the rate (expressed as a percentage rate per annum) which is determined by the Bank to be the all-inclusive cost to the Bank for the funding of the relevant Tranche based upon the then applicable internally generated Bank reference rate or an alternative rate determination method reasonably determined by the Bank The Borrower shall have the right to refuse in writing such disbursement within the deadline specified in the notification and shall bear charges incurred as a result, if any, in which case the Bank shall not effect the disbursement and the corresponding Credit shall remain available for disbursement under Article 1.02B. If the Borrower does not refuse the disbursement in time, the parties agree that the disbursement and the conditions thereof shall be fully binding for both parties.
In each case the Spread or Fixed Rate previously notified by the Bank in the Disbursement Notice or in an Interest Revision/Conversion Proposal shall be no longer applicable.
Article 4
REPAYMENT
4.01 Normal repayment
(a) The Borrower shall repay each Tranche by instalments on the Payment Dates specified in the relevant Disbursement Notice in accordance with the terms of the amortisation table delivered pursuant to Article 2.03.
(b) Each amortisation table shall be drawn up on the basis that:
(i) in the case of a Fixed Rate Tranche without an Interest Revision/Conversion Date, repayment shall be made on a constant annuity basis or by equal annual, semi-annual or quarterly instalments of principal;
(ii) in the case of a Fixed Rate Tranche with an Interest Revision/Conversion Date or a Floating Rate Tranche, repayment shall be made by equal annual, semi-annual or quarterly instalments of principal; and
(iii) the first repayment date of each Tranche shall be a Payment Date falling not earlier than 60 days from the Scheduled Disbursement Date (or, in case of deferment, the actual disbursement date) and not later than the first Payment Date immediately following the fifth (5) anniversary of the Scheduled Disbursement Date of the Tranche and the last repayment date shall be a Payment Date falling not earlier than 4 (four) years and not later than 20 (twenty) years from the Scheduled Disbursement Date.
4.02 Voluntary prepayment
4.02A Prepayment option
Subject to Articles 4.02B, 4.02C and 4.04, the Borrower may prepay all or part of any Tranche, together with accrued interest and indemnities if any, upon giving a Prepayment Notice with at least 1 (one) month’s prior notice specifying the Prepayment Amount and the Prepayment Date.
Subject to Article 4.02C the Prepayment Notice shall be binding and irrevocable.
4.02B Prepayment indemnity
4.02B(1) FIXED RATE TRANCHE
(a) Subject to paragraph (b) below, if the Borrower prepays a Fixed Rate Tranche the Borrower shall pay to the Bank on the Prepayment Date an indemnity equal to the present value (as of the Prepayment Date) of the excess, if any, of:
(i) the interest that would accrue thereafter on the Prepayment Amount over the period from the Prepayment Date to the Interest Revision/Conversion Date, if any, or the Maturity Date, if it were not prepaid; over
(ii) the interest that would so accrue over that period, if it were calculated at the Redeployment Rate, less 0.15% (fifteen basis points).
The said present value shall be calculated at a discount rate equal to the Redeployment Rate, applied as of each relevant Payment Date.
(b) The Borrower may prepay a Fixed Rate Tranche without indemnity on the Interest Revision/Conversion Date in the event of the non-fulfilment of an Interest Revision/Conversion pursuant to Schedule D.
4.02B(2) FLOATING RATE TRANCHE
The Borrower may prepay a Floating Rate Tranche without indemnity on any relevant Payment Date. If the Borrower has accepted an Interest Revision/Conversion Proposal to convert a Floating Rate Tranche to a Fixed Rate Tranche pursuant to Schedule D, Article 4.02B(1) applies.
4.02C Prepayment mechanics
The Bank shall notify the Borrower, not later than 15 (fifteen) days prior to the Prepayment Date, of the Prepayment Amount, of the accrued interest due thereon and of the indemnity payable under Article 4.02B or, as the case may be, that no indemnity is due.
Not later than the Acceptance Deadline, the Borrower shall notify the Bank either:
(a) that it confirms the Prepayment Notice on the terms specified by the Bank; or
(b) that it withdraws the Prepayment Notice.
If the Borrower gives the confirmation under paragraph (a) above, it shall effect the prepayment. If the Borrower withdraws the Prepayment Notice or fails to confirm it in due time, it may not effect the prepayment. Save as aforesaid, the Prepayment Notice shall be binding and irrevocable.
The Borrower shall accompany the prepayment by the payment of accrued interest and indemnity, if any, due on the Prepayment Amount.
4.03 Compulsory prepayment
4.03A Grounds for prepayment
4.03A(1) PROJECT COST REDUCTION
If the total cost of the Project should be reduced from the figure stated in Recital (2) to a level at which the amount of the Credit exceeds 50% (fifty per cent) of such cost, the Bank may in proportion to the reduction forthwith, by notice to the Borrower, cancel the undisbursed portion of the Credit and/or demand prepayment of the Loan.
4.03A(2) PARI PASSU TO ANOTHER TERM LOAN
If the Borrower voluntarily prepays a part or the whole of any other loan originally granted to it for a term of more than five (5) years (a «Term Loan») otherwise than under revolving credit facilities which remain open for drawing after such prepayment on the same terms as such prepayment, the Bank may, by notice to the Borrower, cancel the Credit and demand prepayment of the Loan, in such proportion as the prepaid amount of the Term Loan bears to the aggregate outstanding amount of all Term Loans.
The Bank shall address its notice to the Borrower within 30 (thirty) days of receipt of notice under Article 8.02(ii).
For the purposes of this Article, «loan» includes any loan, bond or other form of financial indebtedness or any obligation for the payment or repayment of money. Such term shall exclude indebtedness in the form of publicly-issued bonds.
4.03A(3) ENVIRONMENTAL LAW
If the Bank becomes aware that the Final Beneficiary has failed to comply with Environmental Laws or with the information obligation referred to in Article 6.06 (e) and (f) in respect of a Sub-Project (hereinafter an «Affected Sub-Project»), it may notify the Borrower. Within a period of 30 (thirty) days following the giving of that notice, the Borrower shall either (i) reallocate the relevant portion of the Loan to another Sub-Project in accordance with Article 1.02, or (ii) give 30 (thirty) days’ notice of prepayment of a fraction of the Loan corresponding to the ratio of the value of the Affected Sub-Project to the aggregate value of all Sub-Projects.
4.03A(4) CHANGE OF LAW
The Borrower shall promptly inform the Bank if a Change-of-Law Event has occurred or is likely to occur in respect to the Borrower. In such case, or if the Bank has reasonable cause to believe that a Change-of-Law Event has occurred or is about to occur, the Bank may request that the Borrower consult with it. Such consultation shall take place within 30 (thirty) days from the date of the Bank’s request. If, after the earlier of (a) the lapse of 30 (thirty) days from the date of such request for consultation or (b) the occurrence of the anticipated Change-of-Law Event, the Bank may, by notice to the Borrower, cancel the Credit and demand prepayment of the Loan, together with accrued interest and all other amounts accrued and outstanding under this Contract. The Borrower shall effect payment of the amount demanded on the date specified by the Bank, such date being a date falling not less than 30 (thirty) days from the date of the demand.
For the purposes of this Article «Change-of-Law Event» means the enactment, promulgation, execution or ratification of or any change in or amendment to any law, rule or regulation (or in the application or official interpretation of any law, rule or regulation) that occurs after the date of this Contract which results or is reasonably likely to result in a Material Adverse Change.
4.03A(5) EXCEEDING OF SUMS
If, on or after 15 March 2014, the Bank, having approved or declined Allocation Requests, shall establish that the sum of the original amounts of all Tranches disbursed hereunder exceeds the sum of all Allocations made hereunder, the Borrower shall prepay the excess amount on first demand of the Bank.
Such prepayment shall be made on a date determined by the Bank falling not earlier than 15 (fifteen) days from the Borrower’s receipt of the Bank’s demand for prepayment.
4.03B Prepayment mechanics
Any sum demanded by the Bank pursuant to Article 4.03A, together with any interest or other amounts accrued and outstanding and any indemnity due under Article 4.03C, shall be paid on the date indicated by the Bank which date shall fall not less than 30 (thirty) days from the date of the Bank’s notice of demand and shall be applied in accordance with Article 10.05.
4.03C Prepayment indemnity
In the case of an Indemnifiable Prepayment Event, the indemnity, if any, shall be determined in accordance with Article 4.02B for a Fixed Rate Tranche.
If, moreover, pursuant to any provision of Article 4.03A the Borrower prepays a Tranche on a date other than a relevant Payment Date, the Borrower shall indemnify the Bank in such amount as the Bank shall certify is required to compensate it for receipt of funds otherwise than on a relevant Payment Date.
4.04 Application of partial prepayments
If the Borrower partially prepays a Tranche, the Prepayment Amount shall be applied pro rata to each outstanding instalment.
A prepaid amount may not be reborrowed. This Article 4 shall not prejudice Article 10.
Article 5
PAYMENTS
5.01 Day count convention
Any amount due by way of interest, indemnity or fee from the Borrower under this Contract, and calculated in respect of a fraction of a year, shall be determined on the following respective conventions:
(a) for a Fixed Rate Tranche, a year of 360 (three hundred and sixty) days and a month of 30 (thirty) days; and
(b) for a Floating Rate Tranche, a year of 360 (three hundred and sixty) days and the number of days elapsed.
5.02 Time and place of payment
Unless otherwise specified, all sums other than sums of interest, indemnity and principal are payable within 7 (seven) days of the Borrower’s receipt of the Bank’s demand.
Each sum payable by the Borrower under this Contract shall be paid to the respective account notified by the Bank to the Borrower. The Bank shall indicate the account not less than 15 (fifteen) days before the due date for the first payment by the Borrower and shall notify any change of account not less than 15 (fifteen) days before the date of the first payment to which the change applies. This period of notice does not apply in the case of payment under Article 10.
A sum due from the Borrower shall be deemed paid when the Bank receives it.
5.03 Set-off
The Bank may set off any matured obligation due from the Borrower under this Contract (to the extent beneficially owned by the Bank) against any obligation (whether or not matured) owed by the Bank to the Borrower regardless of the place of payment, booking branch or currency of either obligation. If the obligations are in different currencies, the Bank may convert either obligation at a market rate of exchange in its usual course of business for the purpose of the set-off. If either obligation is unliquidated or unascertained, the Bank may set off in an amount estimated by it in good faith to be the amount of that obligation.
5.04 Disruption to Payment Systems
If either the Bank determines (in its discretion) that a Disruption Event has occurred or the Bank is notified by the Borrower that a Disruption Event has occurred:
(a) the Bank may, and shall if requested to do so by the Borrower, consult with the Borrower with a view to agreeing with the Borrower such changes to the operation or administration of the Contract as the Bank may deem necessary in the circumstances;
(b) the Bank shall not be obliged to consult with the Borrower in relation to any changes mentioned in paragraph (a) if, in its opinion, it is not practicable to do so in the circumstances and, in any event, shall have no obligation to agree to such changes; and
(c) the Bank shall not be liable for any damages, costs or losses whatsoever arising as a result of a Disruption Event or for taking or not taking any action pursuant to or in connection with this Article 5.04.
Article 6
BORROWER UNDERTAKINGS AND REPRESENTATIONS
The undertakings in this Article 6 remain in force from the date of this Contract for so long as any amount is outstanding under this Contract or the Credit is in force.
A. Project undertakings
6.01 Use of Loan and availability of other funds
The Borrower shall and shall cause the Final Beneficiaries to use the proceeds of the Loan exclusively for the financing of up to fifty per cent of the relevant Sub-Project’s costs.
The Borrower shall ensure that it has available to it the other funds listed in Recital (2) and that such funds are expended, to the extent required, on the financing of the Sub-Projects.
6.02 Re-employment of funds
If:
(a) monies made available to a Final Beneficiary are paid or repaid to the Borrower; or