HRVATSKI SABOR
16
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU SPORAZUMA O FINANCIRANJU IZMEĐU VLADE REPUBLIKE HRVATSKE I EUROPSKE KOMISIJE KOJIM SE MIJENJA SPORAZUM O FINANCIRANJU IZMEĐU VLADE REPUBLIKE HRVATSKE I EUROPSKE KOMISIJE ZA VIŠEGODIŠNJI OPERATIVNI PROGRAM »PROMET« ZA POMOĆ ZAJEDNICE IZ INSTRUMENTA PRETPRISTUPNE POMOĆI U SKLOPU KOMPONENTE »REGIONALNI RAZVOJ« U HRVATSKOJ
Proglašavam Zakon o potvrđivanju Sporazuma o financiranju između vlade Republike Hrvatske i Europske komisije kojim se mijenja Sporazum o financiranju između Vlade Republike Hrvatske i Europske komisije za višegodišnji operativni program »Promet« za pomoć Zajednice iz Instrumenta pretpristupne pomoći u sklopu komponente »Regionalni razvoj« u Hrvatskoj, koji je Hrvatski sabor donio na sjednici 1. veljače 2013. godine.
Klasa: 011-01/13-01/19
Urbroj: 71-05-03/1-13-2
Zagreb, 6. veljače 2013.
Predsjednik
Republike Hrvatske
Ivo Josipović, v. r.
ZAKON
O POTVRĐIVANJU SPORAZUMA O FINANCIRANJU IZMEĐU VLADE REPUBLIKE HRVATSKE I EUROPSKE KOMISIJE KOJIM SE MIJENJA SPORAZUM O FINANCIRANJU IZMEĐU VLADE REPUBLIKE HRVATSKE I EUROPSKE KOMISIJE ZA VIŠEGODIŠNJI OPERATIVNI PROGRAM »PROMET« ZA POMOĆ ZAJEDNICE IZ INSTRUMENTA PRETPRISTUPNE POMOĆI U SKLOPU KOMPONENTE »REGIONALNI RAZVOJ« U HRVATSKOJ
Članak 1.
Potvrđuje se Sporazum o financiranju između Vlade Republike Hrvatske i Europske komisije kojim se mijenja Sporazum o financiranju između Vlade Republike Hrvatske i Europske komisije za višegodišnji Operativni program »Promet« za pomoć Zajednice iz Instrumenta pretpristupne pomoći u sklopu komponente »Regionalni razvoj« u Hrvatskoj, potpisan u Bruxellesu, 30. listopada 2012. i u Zagrebu, 13. prosinca 2012. u izvorniku na engleskom jeziku.
Članak 2.
Tekst Sporazuma o financiranju iz članka 1. ovoga Zakona, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik, glasi:
FINANCING AGREEMENT BETWEEN THE GOVERNMENT OF
THE REPUBLIC OF CROATIA AND THE EUROPEAN COMMISSION MODIFYING THE
FINANCING AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF CROATIA
AND THE EUROPEAN COMMISSION CONCERNING THE MULTI-ANNUAL OPERATIONAL
PROGRAMME «TRANSPORTATION OP» FOR COMMUNITY ASSISTANCE FROM THE
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE UNDER THE »REGIONAL DEVELOPMENT»
COMPONENT IN CROATIA
The Government of the Republic of Croatia
and
the European Commission
Hereafter jointly referred to as «the
Parties» or individually as «the Beneficiary», in the case of the
Government of the Republic of Croatia or «the Commission», in the case
of the European Commission
Having regard to Article 110 of the Financing Agreement,
Whereas
(1) A Financing Agreement concerning the
multiannual operational programme «Transportation OP» was signed on 10
November 2008 between the Government of the Republic of Croatia and the
European Commission and entered into force on 15 December 2008. On 2
November 2010 and 27 October 2010 respectively, a Financing Agreement
modifying the Financing Agreement concerning the multiannual operational
programme Transportation» was signed by the Government of the Republic
of Croatiaand the European Commission and entered into force on 14 January 2011.
(2) In the meantime, Commission Regulation (EC) No 718/2007
implementing Council Regulation (EC) No 1085/2006 establishing an
Instrument for Pre-accession Assistance (IPA) was amended by Commission
Implementing Regulation (EC)813/2012, in particular Article 160.3
regarding the pre-financing payment.
(3) On 12 October 2011, the Commission adopted the Multi-Annual Indicative Financial Framework (MIFF) for 2012-2013. On 17 June 2011, the Commission adopted the Multi-Annual Indicative Planning Document (MIPD) 2011-2013 for Croatia which presents the main priorities for pre-accession assistance to this country.
(4) Pursuant to Article 166 of Council Regulation No 1605/2002,
portion of the 2008 budget commitment for the programme which was not
met by advance and intermediate payments by 31 December 2011 was
decommitted in the amount of EUR 9 306 575 on 4 July 2012.
(5) On 9 December 2011, the Strategic
Co-ordinator in coordination with the National IPA Co-ordinator in
Croatia submitted a request for the revision of the multi-annual
operational programme «Transportation» for assistance from the
Instrument for Pre-Accession Assistance (IPA).
(6) Consequently, on 23 October 2012, the
operational programme «Transportation» as adopted by Commission Decision
C(2007)6051 of 7 December 2007 was last amended by Commission Decision
C(2012)7450.
(7) The changes should be reflected in the
Financing Agreement, in particular as regards the financial plan and
allocation of additional IPA funds to the programme for the years
2012-2013 in the amount of EUR 29 589 380 and the text of the
operational programme. The operational programme should form an integral
part of the Financing Agreement.
(8) The Financing Agreement concerning the
multiannual operational programme «Transportation» should therefore be
amended accordingly,
HAVE AGREED AS FOLLOWS:
Article 1
The following provisions of the Financing Agreement
regarding the multiannual operational programme «Transportation» are
hereby amended as follows:
1. In Article 1, paragraph 2 is replaced by the following:
«This Agreement concerns the multi-annual
operational programme «Transportation» for assistance from the
Instrument of Pre-Accession Assistance under the «Regional Development»
component in Croatia, adopted by Commission Decision C(2007)6051 of 7
December 2007 and last amended by Commission Decision C(2012)7450 of 23
October 2012.»
2. In Article 10, paragraph 1 is replaced by the following:
«The total cost of the programme, expressed in
terms of expenditure as defined in Article 17(2) of this Agreement, is
estimated at EUR 137 627 431. The breakdown of this amount is set out in
the Financial Plan in Annex I.»
3. In Article 11, paragraph 1 is replaced by the following:
«1. The Financial Plan, expressed in euro,
applicable to the IPA contribution broken down by year and national
public contributions to the programme in the period 2007 to 2013, at the
level of each priority axis, is the Financial Plan indicated in Annex
I.»
4. In Article 25, paragraphs 1 and 2 are replaced by the following:
«1. In compliance with Article 6 of the Framework
Agreement, the following structures and authorities, common to all IPA
components, have been designated by the Beneficiary:
a.) The National IPA Coordinator: Assistant Minister, Ministry for Regional Development and EU Funds
b.) The Competent Accrediting Officer: Minister, Ministry of Finance
c.) The National Authorising Officer: Assistant Minister, Ministry of Finance
d.) The National Fund: State Treasury, Ministry of Finance
e.) The Audit Authority: Agency for the Audit of European Union Programmes Implementation Systems
2. The Strategic Co-ordinator is at the Ministry for Regional Development and EU Funds.»
5. In Article 26, paragraph 1 is replaced by the following:
«In accordance with paragraph 6 a) of Annex A of
the Framework Agreement, the bodies constituting the Operating Structure
for the programme are:
– the Ministry of Maritime Affaires, Transport and Infrastructure;
– the Croatian Railways Infrastructure;
– the Central Finance and Contracting Agency.
The Beneficiary has appointed the Assistant
Minister of the Ministry of Maritime Affaires, Transport and
Infrastructure as Head of the Operating Structure, with responsibility
for the tasks described in paragraph 6 c) of Annex A to the Framework
Agreement. «
6. In Article 28, paragraph 2 is replaced by the following:
«Any communication in connection with this Agreement must be sent to the following addresses:
For the Commission: Directorate General for Regional Policy
Postal Address: Rue de la loi 200, B1049 Brussels, Belgium
Fax: 0032 2 29 0139
For the Beneficiary: Ministry of Regional Development and EU funds
Postal Address: Radnička cesta 80/V, 10 000 Zagreb
Fax: 00385 1 4569 216»
7. In Article 64, paragraph 2 is replaced by the following:
«2. Pre-financing payments may amount to 30% of the
IPA contribution for the first three years of the programme. At the
time of the revision of the programme the pre-financing may be increased
up to a maximum of 30% of the IPA contribution for the three most
recent years. If necessary and having regard to the budget availability,
the pre-financing may be made in two instalments.»
8. Annex I is replaced by Annex I to this Financing Agreement.
9. Annex V is replaced by Annex II to this Financing Agreement.
10. Annex XIX is amended by the text set out in Annex III to this Financing Agreement.
Article 2
This Agreement shall enter into force on the date
on which the Beneficiary notifies the Commission that all internal
procedures in the Republic of Croatia necessary for the entry into force
of this Agreement have been fulfilled.
Signed, for and on behalf of the Government of the Republic of Croatia,
at Zagreb on 13 December 2012
by Mr Matija Derk, signed, Assistant Minister of Regional Development and EU Funds, National IPA Coordinator
Signed, for and on behalf of the Commission,
at Brussels on 30 October 2012
by Mr Walter Deffaa, signed, Director General of Directorate General for Regional and Urban Policy
ANNEX I
«ANNEX I
Financial plan of the multi-annual operational programme «Transportation»
»
ANNEX II
«ANNEX V
Field 1. Operational Programme CCI code: 2007 HR 16 I PO 002
Field 2. Operational Programme for Transportation
Field 3. IPA component III – Regional Development
Field 4. Beneficiary – Republic of Croatia
Field 5. National IPA Coordinator
Name:Assistant Minister, Ministry of Regional Development and EU Funds
Address Radnička cesta 80/V, 10 000 Zagreb
Phone + 385 1 4569 205
Field 6. Strategic Coordinator for the regional development and the human resources development components
Name: Ministry of Regional Development and EU funds
Address Radnička cesta 80/V, 10 000 Zagreb
Phone + 385 1 4569 194
Field 7. Competent Accrediting Officer
Name:Minister, Ministry of Finance
Address Katančićeva 5, 10 000 Zagreb
Phone + 385 1 4591 300
Field 8. National Authorising Officer
Name:Assistant Minister, Ministry of Finance
Address Katančićeva 5, 10 000 Zagreb
Phone + 385 1 4591 479
Field 9. National Fund
Name:Head of Sector, Ministry of Finance
Address Katančićeva 5, 10 000 Zagreb
Phone + 385 1 4591 243
Field 10. Audit Authority
Name:Director, Agency for the Audit of European Union Programmes Implementation Systems
Address Koturaška 53/1, 10 000 Zagreb
Phone + 385 1 4585 999
Field 11. Contracting Authorities
Name: President of Board, Croatian Railways Infrastructure Ltd
Address Mihanovićeva 12, 10 000 Zagreb
Phone 00385 1 3783302
Name: Director, Central Finance and Contracting Agency
Address Ulica grada Vukovara 284, 10 000 Zagreb
Phone 00 385 1 4591 245
Field 12. Operating Structure
Name: Ministry of Maritime Affaires, Transport and Infrastructure
Address Prisavlje 14, 10 000 Zagreb
Phone 00 385 1 3784 543
Field 12.a Head of the Operating Structure
Name:Assistant Minister, Ministry of Maritime Affaires, Transport and Infrastructure
Address Prisavlje 14, 10 000 Zagreb
Phone 00 385 1 3784 543
Field 12.b Specific body – Body responsible for Priority axes 1, 2, 3
Name: Ministry of Maritime Affaires,
Transport and Infrastructure, Directorate Transport Infrastructure,
Sector for EU funds and international cooperation
Address Krležin Gvozd 1a, 10 000 Zagreb
Phone 00385 1 3783 991
Field 13. IPA Monitoring Committee
Chairperson National IPA Coordinator
Co-Chairperson Representative of the European Commission
Field 14: Sectoral Monitoring Committee for the Transportation Operational Programme
Chairperson Head of the Operating Structure
Co-Chairperson Representative of the Directorate General for Regional Policy,
Field 15. Directorate General for Regional Policy
Address Rue Père de Deken 23, 1040 Brussels, Belgium
Phone + 32 229 66721
Field 16: Authorising Officer by Delegation:
Name: Director General, Directorate General for Regional Policy
Field 17: Authorising Officer by Sub-delegation:
Name: Director, Directorate I «Austria, Bulgaria, Cyprus, Greece, Romania, Slovenia, IPA/ISPA accession negotiations»
Field 18: Audit Unit:
Name: Control and Audit I
Field 19. OLAF
Name: European Anti-Fraud Office, Directorate C- Operational and Policy Support
Address Rue Joseph II 30, B-1049 Brussels, Belgium
Phone + 32 2 2991 111»
ANNEX III
The multi-annual operational programme «Transportation» is amended as follows:
1. Section 3.1 is replaced by the following:
«3.1. PRIORITY AXES AND MEASURES
3.1.1. IPA objectives and priority axes
The aim of the Transport OP is to select
projects which best fit the OP’s objectives, while spreading the
benefits of learning from the systems and practices of IPA management,
as IPA uses processes of project and programme management which are
closer to Structural Fund programme and project management than previous
EU pre-accession funds. The IPA objectives and priorities must be in
line with strategic directions identified in the Accession Partnership
and National 1999 Transport Development Strategy. Therefore, the main
objective of the TOP is to invest in projects which will have the
greatest impact on the modernisation of the railway lines and, in
parallel, to prepare projects for future investments in upgrading and
improving the inland waterway sector, since, at this time, there is a
lack of suitably mature projects that could be implemented during this
Operational Programme period. Finally the aim is to develop the
administrative and management capacity of those institutions
implementing the TOP. Implementing the TOP measures will produce direct
development benefits such as a reduction in the time taken to shift
freight, increasing the safety of journeys, and making inland waterways
more competitive and less expensive in relation to other transport
modes.
Following the strategic direction given by the MIPD
and, subsequently, the SCF, the TOP proposes measures (and major
projects) under three priority axes:
3.1.2. Selection criteria
In general terms, project selection
criteria are based, on the one hand, on specific IPA criteria for the
transport sector, listed in Article 147 of the IPA Implementing
Regulation (sustainable traffic flow, better connections and
inter-operability within networks) and, on the other hand, on the
principles and criteria set out in the Decision No. 1692/96/EC made on
July 23, 1996 by the European Parliament and the Council of Ministers,
on EU Guidelines for the Development of the Trans-European Transport
Network
General criteria
After gathering, as a first step, all
potentially eligible projects on the proposed corridors and transport
modes, projects that could not satisfy the following general screening
criteria have been eliminated from further consideration (in order of
priority):
• The project should bear a very high
relevance to the SEE Comprehensive Transport Network developed by the
South East European Transport Observatory (SEETO);
• The financial plan should be realistic,
including the question of secondary investment cost (maintenance)
coverage, and show in particular the division between national and
outside financing;
• The project should show sufficient
maturity, taking due account of administrative/legal barriers concerning
project implementation (land acquisition problems, right of way etc);
• The project should be of sufficient size and significance;
• The project should in no way duplicate
third party efforts, but should match other projects of a complementary
nature in order to achieve synergies;
• There should be a visible commitment by
the national government or regional bodies (such as SEETO and /or Sava
River Commission) to implement the project; projects therefore should be
given preference according to their inclusion in related and previously
agreed priority project lists (example REBIS; ISPA)
• The project should provide modal balance and contribute to environmental protection
• The basic technical features of the
project should be more cost-efficient (demand oriented) in reaching the
strategic objectives than alternative technical options, and should be
appropriate and correspond to international standards.
Generally all of the priority projects
(except for project number 1) which have been pre-selected and included
in the indicative project list for 2007-2009 (section 3.5) are at an
early stage of project preparation, requiring technical, economic and,
if necessary, environmental studies.
Therefore, in a second appraisal stage, proposed priority projects will be checked against the following screening parameters:
Specific Criteria
Proposed projects will be checked to ensure
the completeness of the following standard preparatory activities,
which should be carried out before submitting projects for approval to
the Project Selection Committee (and subsequently the European
Commission, in the case of major projects):
• Pre-feasibility study; including
preliminary financial and economic analysis and calculation of Financial
Internal Rate of Return (FIRR) and Economic Internal Rate of Return
(EIRR); eventual preliminary drawings;
• Availability of co-financing, including possible involvement of IFIs;
• Detailed feasibility study, including
financial and economic analyses (FIRR & EIRR) which take into
account societal (external) effects; cost benefit analyses,
affordability analyses, preliminary and detailed technical designs;
operation plans etc
• Environmental impact assessment (EIA), if needed according to Croatian and European regulations;
• Reports on consultations with interested/affected parties;
• Approvals and permits obtained (for example construction permits, environmental permits, rights of land etc)
• Satisfactory completion of all parts of
the IPA application form (EC ‘major projects’ template, in the case of
projects over €10m)
The objective of the second phase screening process
is to identify the most feasible projects and those projects having the
most immediate and significant impact in terms of:
• readiness for implementation (maturity)
• improving transport efficiency;
• guaranteeing financial and environmental sustainability;
• improving transport safety and security.
As far as possible the impact will be
assessed in monetary terms, and subjected to a sensitivity analysis.
Major Projects will be prepared in accordance with articles 150 and 157
of the IPA Implementing Regulation. Only projects with a sufficiently
high rate of return (FIRR; EIRR) will be considered for implementation.
Finally, two legal and financial
considerations will be taken into account in assessing the applications:
first, an understanding and undertaking that the infrastructure will
remain public property, and second, the availability of budgetary
resources to ensure Croatian co-financing of the projects, and their
sustainability (operation and maintenance) beyond the funding period.
The TOP priority axes and measures proposed
below, through which the TOP’s strategic objective is to be
implemented, are considered the most beneficial for railway and river
network development on the one hand, and for society and the environment
on the other, while meeting the EU transport acquis obligations.
Revenue generating projects
Revenue generating projects as defined in
Article 150 of the IPA Implementing Regulation are operation(s) proposed
for pre-accession assistance involving an investment in infrastructure,
the use of which is subject to charges borne directly by users and
which generates revenues, or any operation involving the sale or rent of
land or buildings.
3.1.3 Priority axis 1 – Upgrading Croatia’s rail transport system
Aim:
The aim of this priority axis is to develop
the railway transport infrastructure in Croatia, concerning in
particular the interconnection and interoperability of national networks
and with trans-European networks. It aims to gradually improve the
quality of the railway along Corridors X and Vb within Croatia, in order that it increasingly meets EU standards.
EU legislation
Activities under this priority axis are
designed to modernise railway infrastructure and assist Croatia in
meeting its obligations related to implementation of the EU transport acquis governing the railway system, namely:
– Directive 91/440/EEC on the development of the EU railways
– Directive 2001/12/EC
of the European Parliament and of the Council of 26 February 2001
amending Council Directive 91/440/EEC on the development of EU railways
– Directive 2001/13/EC of the European Parliament and of the Council of 26 February 2001 on the licensing of railway undertakings
– Directive 2001/14/EC
on the allocation of railway infrastructure capacity and the levying of
charges for the use of railway infrastructure and safety certification.
(Railway Safety Directive)
– Directive 2004/49/EC
of the European Parliament and of the Council of 29 April 2004 on
safety on the EU railways and amending Council Directive 95/18/EC on the
licensing of railway undertakings and
– Directive 2004/50/EC of
the European Parliament and of the Council of 29 April 2004 amending
Council Directive 96/48/EC on the interoperability of the trans-European
high-speed rail system and Directive 2001/16/EC of the European
Parliament and of the Council on the interoperability of the
trans-European conventional rail system,
– Directive 2004/51/EC
of the European Parliament and of the Council of 29 April 2004 amending
Council Directive 91/440/EEC on the development of the EU railways.
Specific objectives
The objective of this priority is to
gradually improve the quality of the railway along Corridors X and Vb
within Croatia, in order that it increasingly meets EU standards.
Specifically, the objectives are:
• rehabilitation / upgrade of specific line sections along Corridors X and Vb, showing the lowest performance indicators
• reconstruction and modernisation of
railway stations to meet EU standards in terms of track lengths and
layout, as well as signalling and telecommunication equipment
Rationale
The priority axis is intended to help
Croatia meet its needs and its obligation to meet EU standards,
specifically in the context of managing changes in transport demand on
main corridors and the future TEN-T network. As demonstrated in section
2, the rail sector has suffered from war damage, and the infrastructure
requires modernisation in order to create an efficient and
environmentally friendly mode of transport.
The intervention is needed to ensure the
rail network can engage successfully in inter-regional and
intra-regional corridor competition and is able to capture significant
parts of future regional traffic potential. Moreover, increasing the
railways’ market share in international goods and passenger traffic on
future TEN-T corridors is a pre-requisite for rendering line investments
and railway operations financially feasible, thereby making the railway
system commercially attractive for private operators.
Corridor X is a double track main railway
line from Savski Marof – Zagreb Main Station – Novska – Tovarnik which
connects central and south-eastern Europe, from Salzburg, via Ljubljana,
Zagreb, Belgrade and Skopje, to the port of Thessaloniki. As far as
traffic is concerned, it represents the backbone of railway traffic from
east to west on which almost all north-south lines and lines from
Bosnia and Herzegovina are connected. Within Croatia, this line connects
significant industrial and agricultural areas.
The total length of Corridor X is 2,528.2
km, of which 1,622.7 km (64.2%) are single track and 905.5 km (35.8%)
are double track. Of the total length of all the lines on the corridor,
2,244.5 km (88.7%) are electrified. It is planned that by the year 2010,
there will be 1,461.3 km (57.8%) single track lines, 1,066.9 km (42.2%)
double track lines and 2,348.7 km (92.9%) electrified lines.
Corridor Vb in Croatia is covered by the
main railway line Botovo – Zagreb – Rijeka. It is the major railway
route connecting North Adriatic, Central Croatia, and North Adriatic. It
is also important for European regional integration: Alps – Adriatic,
Mediterranean – Danube Region and Central-European Initiatives. This
route connects the largest and most significant Croatian port Rijeka
with the Croatian mainland and through it with Central European
countries which gravitate to the Port of Rijeka.
Corridor Vb extends 328.7 km from the
Croatian port of Rijeka on the Adriatic Sea via Zagreb to Botovo on the
Hungarian border. It was built in the late 1880s and, although
maintained, it is subject to many speed and weight restrictions and is
expensive to maintain.
During the 1990’s, events on the territory
of the former Yugoslavia brought about a significant drop in freight and
passenger traffic which was, to a great part, redirected into
alternative traffic corridors. Transit traffic on Corridor X was
completely disrupted for more than five years. In the last few years,
Croatian Railways Infrastructure has registered an increase in traffic
on both Corridor X and Vb.
Description
The priority axis will support two
measures: to upgrade and modernise the line, and to improve safety and
efficiency on rail corridors. This implies:
• increasing travel speed to 160km/hour;
• increasing axle load to 225 kN;
• adjusting station platform lengths (for a TEN route it is 400m);
• installing the European Railway Train
Management System (ERTMS) to ETCS level 1, which refers to the
overlaying of the trackside conventional signalling system with fixed
ETCS infrastructure as a first step to full ERTMS.
• installing/upgrading trackside telecommunication equipment;
• installing/upgrading the overhead power supply system;
• installing/improving the permanent way drainage system;
• installing automatic half or full barrier level crossings;
Targeting
This priority axis will apply to the
railway sector of the TOP, contributing to the TOP’s objective to
«Rehabilitate and develop a railway network in Croatia to respond to the
expected increase in demand for railway transport, especially on the
Pan-European corridors X and Vb». The priority axis is targeted at:
• Improvement and rehabilitation of the railway network
• Improvement of safety conditions of the railway system
• Assisting Croatia in meeting its obligations to implement the EU transport acquis governing the railway system
Measures
Two measures are proposed under this priority axis:
• Measure 1.1. Line up-grading andmodernisation
Projects under this measure will focus on
the improvement of the permanent track and overhead power supply system
and on the preparation of project documentation
• Measure 1.2. Improvement of the safety and efficiency of railway operations
Projects under this measure will
concentrate on the modernisation of trackside infrastructure, signalling
telecommunication, safety and security equipment.
Delivery
The operations (projects) that will be
financed under Priority axis 1 will be selected from the Indicative
project list provided in Chapter 3.5 of the Operational Programme (and
respective project identification cards attached as Annex 2) in
accordance with the general and measure-specific selection criteria
provided in the Operational Programme.
The selected operations will then be
submitted to the European Commission for approval. If a project is
appraised as acceptable the European Commission will issue a decision on
the approval for each project which will define the physical object and
the eligible expenditure to which the co-financing rate for the
priority axis applies. Finally, for each approved project a Financing
Agreement between the European Commission and the beneficiary country
will be signed, laying down those elements. Complementary funding for
these investments will be ensured from national funding, external loans
and other sources and models of funding.
In the case of projects that do not fall
under the title of «major projects» (i.e. that are under the 10 m€
threshold) the decision on competing calls will be made by the Selection
Committee, based on the selection criteria described in the Operational
Programme and confirmed by the Sectoral Monitoring Committee.
Targets and Indicators