VLADA REPUBLIKE HRVATSKE
134
Na temelju članka 30.
stavka 1. Zakona o sklapanju i izvršavanju međunarodnih ugovora
(»Narodne novine«, broj 28/96), Vlada Republike Hrvatske je na sjednici
održanoj 30. listopada 2009. godine donijela
UREDBU
O
OBJAVI SPORAZUMA O FINANCIRANJU IZMEĐU VLADE REPUBLIKE HRVATSKE I
KOMISIJE EUROPSKIH ZAJEDNICA KOJI SE ODNOSI NA DIO VIŠEKORISNIČKOG
PROGRAMA ZA NUKLEARNU SIGURNOST I ZAŠTITU OD ZRAČENJA U OKVIRU
INSTRUMENTA PRETPRISTUPNE POMOĆI ZA 2008. GODINU (ZAJEDNIČKO
UPRAVLJANJE)
Članak 1.
Objavljuje
se Sporazum o financiranju između Vlade Republike Hrvatske i Komisije
Europskih zajednica koji se odnosi na dio Višekorisničkog programa za
nuklearnu sigurnost i zaštitu od zračenja u okviru Instrumenta
pretpristupne pomoći za 2008. godinu (zajedničko upravljanje), potpisan
u Bruxellesu, dana 29. lipnja 2009. i Zagrebu, dana 30. rujna 2009.
godine, u izvorniku na engleskom jeziku.
Članak 2.
Tekst Sporazuma iz članka 1. ove Uredbe, u izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik glasi:
FINANCING AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF CROATIA AND THE COMMISSION OF THE EUROPEAN COMMUNITIES CONCERNING THE HORIZONTAL PROGRAMME ON NUCLEAR SAFETY AND RADIATION PROTECTION UNDER THE INSTRUMENT FOR PRE-ACCESSION ASSISTANCE FOR 2008
(Joint Management)*CONTENTS
FINANCING AGREEMENT
THE GOVERNMENT OF THE REPUBLIC OF CROATIA
and
THE COMMISSION OF THE EUROPEAN COMMUNITIES
hereafter jointly referred to as «the Parties», or individually as «the Beneficiary» in the case of the Government of the Republic of Croatia, or »the Commission«, in the case of the Commission of the European Communities.
Whereas:
(a) On 1 August 2006, the Council of the European Union adopted Regulation (EC) No 1085/2006 establishing an instrument for pre-accession assistance (hereafter: the «IPA Framework Regulation»). With effect from 1 January 2007, this instrument constitutes the single legal basis for the provision of financial assistance to candidate countries (currently Croatia, the former Yugoslav Republic of Macedonia and Turkey) and potential candidate countries (Albania, Bosnia and Herzegovina, Montenegro, and Serbia, as well as Kosovo) in their efforts to enhance political, economic and institutional reforms with a view to their eventually becoming members the European Union.
(b) On 12 June 2007, the Commission adopted Regulation (EC) No 718/2007 implementing the IPA Framework Regulation, detailing applicable management and control provisions (hereafter: the «IPA Implementing Regulation»).
(c) Community assistance under the instrument for pre-accession assistance should continue to support the beneficiary countries in their efforts to strengthen democratic institutions and the rule of law, reform public administration, carry out economic reforms, respect human as well as minority rights, promote gender equality, support the development of civil society and advance regional cooperation as well as reconciliation and reconstruction, and contribute to sustainable development and poverty reduction.
Community assistance for candidate countries should additionally focus on the adoption and implementation of the full acquis communautaire, and in particular prepare them for the implementation of the Community’s agricultural and cohesion policy.
(d) The Parties have concluded on 27 August 2007 a Framework Agreement setting out the general rules for cooperation and implementation of the Community assistance under the Instrument for Pre-accession Assistance.
(e) The Commission adopted on 18 December 2008 the Horizontal programme on Nuclear Safety and Radiation Protection under the IPA Transition Assistance and Institution Building Component for 2008 (hereafter: »the programme«). Part of this programme concerning the Republic of Croatia is to be implemented in joint management with the International Atomic Energy Agency (IAEA).
(f) It is necessary for the implementation of this programme that the Parties conclude a Financing Agreement to lay down the conditions for the delivery of Community assistance, the rules and procedures concerning disbursement related to such assistance and the terms on which the assistance will be managed,
HAVE AGREED ON THE FOLLOWING:
1. THE PROGRAMME
The Commission will contribute, by way of grant, to the financing of the following programme, which is set out in Annex A to this Agreement:
Programme number: CRIS N° 2008/020-349 and 2008/020-350
Title: Horizontal programme on Nuclear Safety and Radiation Protection under the IPA Transition Assistance and Institution Building Component for 2008 – C(2008)8381 of 18 December 2008.
The part of this programme concerning the Republic of Croatia to be implemented in joint management with the IAEA comprises one regional project which covers – among others – Croatia, namely:
Project No 1: «Enhancement of the technical capacity of nuclear regulatory bodies in Albania, Bosnia and Herzegovina, Croatia, the former Yugoslav Republic of Macedonia, Kosovo, Montenegro and Serbia».
2. IMPLEMENTATION OF THE PROGRAMME
(1) The part of this programme specified under »Heading 1 – The programme«, concerning the Republic of Croatia shall be implemented by the Commission in joint management with the IAEA, in the meaning of Article 53d of Council Regulation (EC Euratom) No 1605/2002 on the Financial Regulation applicable to the general budget of the European Communities, as last modified by Regulation (EC, Euratom) No 1525/2007 of 17 December 2007 (hereafter: «Financial Regulation»).
(2) The implementation of project No 1 is subject to the following conditions:
• The Beneficiary must have a regulatory body in the nuclear area already established by law at the time of the launching of the tendering procedure for contracting (publication of the procurement notice).
• In the related call for tenders, participation is restricted to all Nuclear Regulatory bodies of EU Member States participating either individually or in a grouping (consortium). Technical Safety Organisations established in EU Member States can be part of consortia together with the above regulatory bodies.
(3) The programme shall be implemented in accordance with the provisions of the Framework Agreement on the Rules for co-operation concerning EC Financial Assistance to the Republic of Croatia and the implementation of the Assistance under the Instrument for Pre-accession Assistance (IPA) concluded between the Parties on 27 August 2007 (hereafter: «the Framework Agreement»), which is set out in Annex B to this Agreement.
3 STRUCTURES AND AUTHORITIES WITH RESPONSIBILITIES
The Beneficiary shall designate a national IPA co-ordinator, in accordance with the Framework Agreement, who shall act as the representative of the Beneficiary vis-à-vis the Commission. He/she shall ensure that a close link is maintained between the Commission and the Beneficiary with regard both to the general accession process and to EU pre-accession assistance under IPA.
4 FUNDING
The funding for the implementation of this Agreement shall be as follows:
(a) The Community contribution for the total of the programme for the year 2008 is fixed at a maximum of EUR 7 030 000, as detailed in the programme. However, payment of the Community contribution by the Commission shall be made within the limits of the funds available.
(b) The cost of the structures and authorities put in place by the Beneficiary for the implementation of this programme shall be borne by the Beneficiary.
5 CONTRACTING DEADLINE
(1) The individual contracts and agreements which implement this Agreement shall be concluded no later than two years from the date of conclusion of this Agreement.
(2) In duly justified cases, this contracting deadline may be extended before its end date to a maximum of three years from the date of conclusion of this Agreement.
(3) Any funds for which no contract has been concluded before the contracting deadline shall be cancelled.
6 DEADLINE FOR THE EXECUTION OF CONTRACTS
(1) The contracts must be executed within a maximum of 2 years from the end date of contracting.
(2) The deadline for the execution of contracts may be extended before its end date in duly justified cases.
7 DISBURSEMENT DEADLINE
(1) Disbursement of funds must be made no later than one year after the final date for the execution of contracts.
(2) The deadline for disbursement of funds may be extended before its end date in duly justified cases.
8 TREATMENT OF RECEIPTS
(1) Receipts for the purposes of IPA include revenue earned by an operation, during the period of its co-financing, from sales, rentals, service enrolment/fees or other equivalent receipts with the exception of:
(a) receipts generated through the economic lifetime of the co-financed investments in the case of investments in firms;
(b) receipts generated within the framework of a financial engineering measure, including venture capital and loan funds, guarantee funds, leasing;
(c) where applicable, contributions from the private sector to the co-financing of operations, which shall be shown alongside public contribution in the financing tables of the programme.
(2) Receipts as defined in paragraph 1 above represent income which shall be deducted from the amount of eligible expenditure for the operation concerned. No later than the closure of the programme, such receipts shall be deducted from the relevant operation’s eligibility expenditure in their entirety or pro-rata, depending on whether they were generated entirely or only in part by the co-financed operation.
9 ELIGIBILITY OF EXPENDITURE
(1) Expenditure under the programme in Annex A shall be eligible for Community contribution if it has been incurred after the contracts and grants implementing such programme have been signed, except in the cases explicitly provided for in the Financial Regulation.
(2) The following expenditure shall not be eligible for Community contribution under the programme in Annex A:
(a) taxes, including value added taxes;
(b) customs and import duties, or any other charges;
(c) purchase, rent or leasing of land and existing buildings;
(d) fines, financial penalties and expenses of litigation;
(e) operating costs;
(f) second hand equipment;
(g) bank charges, costs of guarantees and similar charges;
(h) conversion costs, charges and exchange losses associated with any of the component specific euro accounts, as well as other purely financial expenses;
(i) contributions in kind;
(j) any leasing costs;
(k) depreciation costs.
(3) By way of derogation from paragraph 2 above, the Commission will decide on a case-by-case basis whether the following expenditure is eligible:
(a) operating costs, including rental costs, exclusively related to the period of co-financing of the operation;
(b) value added taxes, if the following conditions are fulfilled:
(i) the value added taxes are not recoverable by any means;
(ii) it is established that they are borne by the final beneficiary, and
(iii) they are clearly identified in the project proposal.
(4) Expenditure financed under IPA shall not be the subject of any other financing under the Community budget.
10 RETENTION OF DOCUMENTS
(1) All documents relating to the programme in Annex A shall be kept for at least five years from the date on which the European Parliament grants discharge for the budgetary year to which the document relate.
(2) In the case that the programme in Annex A is not definitely closed within the deadline set in paragraph 1 above, the documents relating to it shall be kept until the end of the year following that in which the programme in Annex A is closed.
11 ROADMAP FOR DECENTRALISATION WITHOUT EX-
-ANTE CONTROLS
(1) The Beneficiary shall establish a detailed roadmap with indicative benchmarks and time limits to achieve decentralisation with ex-ante controls by the Commission. In addition, the Beneficiary shall establish an indicative roadmap to achieve decentralisation without ex-ante controls by the Commission.
(2) The Commission shall monitor the implementation of the roadmaps mentioned in paragraph 1, and shall take due account of the results achieved by the Beneficiary in this context, in particular in the provision of assistance. The roadmap to achieve decentralization without ex-ante controls may refer to a phased waiver of different types of ex-ante control.
(3) The Beneficiary shall keep the Commission regularly updated with the progress made in the implementation of this roadmap.
12 INTERPRETATION
(1) Subject to any express provision to the contrary in this Agreement, the terms used in this Agreement shall bear the same meaning as attributed to them in the IPA Framework Regulation and the IPA Implementing Regulation.
(2) Subject to any express provision to the contrary in this Agreement, references to this Agreement are references to such Agreement as amended, supplemented or replaced from time to time.
(3) Any references to Council or Commission Regulations are made to the version of those regulations as indicated. If required, modifications of theses regulations shall be transposed into this Agreement by means of amendments.
(4) Headings in this Agreement have no legal significance and do not affect its interpretation.
13 PARTIAL INVALIDITY AND UNINTENTIONAL GAPS
(1) If a provision of this Agreement is or becomes invalid or if this Agreement contains unintentional gaps, this will not affect the validity of the other provisions of this Agreement. The Parties will replace any invalid provision by a valid provision which comes as close as possible to the purpose of and intent of the invalid provision.
(2) The Parties will fill any unintentional gap by a provision which best suits the purpose and intent of this Agreement, in compliance with the IPA Framework Regulation and the IPA Implementing Regulation.
14 REVIEW AND AMENDMENT
(1) The implementation of this Agreement will be subject to periodic reviews at times arranged between the Parties.
(2) Any amendment agreed to by the Parties will be in writing and will form part of this Agreement. Such amendment shall come into effect on the date determined by the Parties.
15 TERMINATION
(1) Without prejudice to paragraph 2, this Agreement shall terminate eight years after its signature. This termination shall not preclude the possibility for the Commission making financial corrections in accordance with Article 56 of the IPA Implementing Regulation.
(2) This Agreement may be terminated by either Party by giving written notice to the other Party. Such termination shall take effect six calendar months from the date of the written notice.
16 SETTLEMENT OF DIFFERENCES
(1) Differences arising out of the interpretation, operation and implementation of this Agreement, at any and all levels of participation, will be settled amicably through consultation between the Parties.
(2) In default of amicable settlement, either Party may refer the matter to arbitration in accordance with the Permanent Court of Arbitration Optional Rules for Arbitration Involving International Organisations and States in force at the date of this Agreement.
(3) The language to be used in the arbitration proceedings shall be English. The appointing authority shall be the Secretary General of the Permanent Court of Arbitration following a written request submitted by either Party. The Arbitrator’s decision shall be binding on all Parties and there shall be no appeal.
17 NOTICES
(1) Any communication in connection with this Agreement shall be made in writing and in the English language. Each communication must be signed and must be supplied as an original document or by fax.
(2) Any communication in connection with this Agreement must be sent to the following addresses:
For the Community:
Mr Timo Summa
Acting Director
Directorate General for Enlargement
CHAR 04/99
B-1049 Brussels
Fax: +32 2 2957502
For the Beneficiary
Mr Hrvoje Dolenec
National IPA Co-ordinator
State Secretary
Central Office for Development Strategy and Coordination of EU Funds
Radnička cesta 80/V,
10 000 Zagreb
Croatia
Fax: 385 1 4569 150
18 NUMBER OF ORIGINALS
This Agreement is drawn up in duplicate in the English language.
19 ANNEXES
The Annexes A and B shall form an integral part of this Agreement.
20 ENTRY INTO FORCE
This Agreement shall enter into force on the date on which the Recipient notifies the Commission that all internal procedures in the Republic of Croatia necessary for the entry into force of this Agreement have been fulfilled.
Signed, for and on behalf of the Government of the Republic of Croatia,
at Zagreb, on September 30th 2009
by Hrvoje Dolenec
State Secretary and National IPA Co-ordinator
Central Office for Development Strategy and Co-ordination of EU Funds
Signed, for and on behalf of the Commission,
at Brussels, on June 29th 2009
by Timo Summa
Acting Director
Directorate General for Enlargement
HORIZONTAL PROGRAMME ON NUCLEAR SAFETY AND RADIATION PROTECTION UNDER THE IPA TRANSITION ASSISTANCE AND INSTITUTION BUILDING COMPONENT FOR 2008 ADOPTED BY COMMISSION DECISION C(2008)8381 OF 18 DECEMBER 2008
1. IDENTIFICATION
2. PRIORITY AXES/ (MEASURES) / PROJECTS
2.a Priority axes
The IPA horizontal programme on nuclear safety and radiation protection is being implemented in the context of the priority axe entitled «Ability to assume the obligations of Membership and approximation to European Standards».
As indicated in the Multi-Beneficiary Multi-annual Indicative Planning Document (MIPD), this programme addresses both regional and horizontal issues. Section 2.2.9 of the MIPD clearly mentions that:
(1) the Western Balkans are confronted with a number of radiological issues that are connected with the use of radionuclides for a number of industrial and medical applications;
(2) the monitoring of radioactivity in the environment constitutes a significant radiological issue;
(3) the national safety authorities in place that ought to be regulating nuclear safety and radiation protection are in most cases rather weak in terms of both personnel and level of expertise;
(4) support can be provided through multi beneficiary projects and national projects in scope depending on the area.
It is important to underline that enhancement of the technical capacity of the nuclear and radiation safety national regulators is a prerequisite for any improvement of the radiological situation in the Western Balkans. In addition, transposition of the Community acquis in the nuclear area and notably on radiation protection is subordinated to the existence and proper functioning of these regulators. Due to the fact that in most of the Western Balkans, nuclear and radiation safety regulators are weak, under development or even not yet fully established, there is no clear national strategies yet defined to cope with radiological issues. It is expected that thanks to the IPA support, these strategies can be drawn up in the near future and, on this basis, roadmaps can be established for the full transposition of the Community acquis into the national legislation and regulations.
The rather dramatic radiological situation currently existing at the Vinca Nuclear Institute near Belgrade in Serbia has raised safety and security issues that need to be addressed urgently. This is why the international Community through the IAEA is contributing to the funding of the VIND programme that aims at improving radioactive waste management, decommissioning of nuclear facilities and remediation of contaminated areas on-site. The IPA horizontal programme on nuclear safety and radiation programme intends to participate into some of the projects that have already been identified by the Serbian authorities together with the IAEA.
This Financing proposal focuses on a set of one regional project and eleven national projects that are covering the MIPD priorities.
2. b Description of projects grouped per priority axis
General context
During the year 2007, a number of fact-finding missions were organised in the Western Balkans in order to get acquainted with the main organisations which are dealing with nuclear safety and radiation protection, and to have a better understanding of the radiological issues with which the beneficiaries are confronted. These missions enabled to identify key-priorities for each of the Western Balkans, namely:
• Enhancement of the technical capacity of the regulatory bodies which is a prerequisite for any improvement in the field of radiation safety in most of the Western Balkans, with the exception of Croatia which has already largely transposed the acquis into the national legislation and regulations;
• Reduction of medical exposure to ionizing radiation for both patients and workers with the view to be in line with the Council Directives 96/29 and 97/43;
• Improvement of the infrastructure on the monitoring of the radioactivity into the environment;
• Reduction of the radiological risks posed by the existence of contaminated areas and storage of large amounts of radioactive waste at the Vinča Nuclear Institute in Serbia.
In this context, eleven national in scope projects were identified as meeting quite well these priorities. In addition, since enhancement of the technical capacity of the regulatory bodies is an important issue in most Western Balkans, for obvious economies of scale, IPA support will be allocated through a rather large regional project.
The programme will be closely coordinated with the IAEA since several projects are extending and developing activities already funded by this agency. For seven projects, it is even proposed to implement them in joint management with the IAEA.
The programme will also be coordinated with the other financing instruments that are addressing nuclear issues (i.e. the Instrument for Nuclear Safety Cooperation and the Stability Instrument).
Description of the projects
Project no 1: «Enhancement of the technical capacity of nuclear regulatory bodies in Albania, Bosnia and Herzegovina, Croatia, the former Yugoslav Republic of Macedonia, Kosovo, Montenegro and Serbia» aims at providing a direct support to the regulatory bodies mainly in assisting them to assess the degree of transposition of the Community acquis in the field of nuclear safety and radiation into their national legislation and regulations. Based on that assessment, a priority list for future transposition activities should be established. This project should also provide assistance for the drafting of new regulations, and for the ratification of international conventions, protocols and agreements in the nuclear area. It should be concluded with an identification of further needs of regulatory assistance.
This is a regional project in scope. Taking into account the important technical assistance activities being implemented by the IAEA in this domain in the Western Balkans, it was deemed worthwhile to implement the project in joint management with this Agency. In this way, overlapping of technical assistance is avoided and synergies can be developed.
A contribution agreement with the IAEA for an amount of EUR 1,200,000 will be concluded in Q1 2009 for the implementation of this project in accordance with the terms of the
Financial and Administrative Framework Agreement (FAFA) between the European Community and the United Nations, signed on 29 April 2003, to which the IAEA adhered on 17 September 2004.
Following a tendering process, the IAEA should contract with a consortium of EU regulatory bodies possibly backed up with their Technical Support Organisations in Q3 2009.
Project no 2: «Establishment of a calibration laboratory for ionising radiation (Secondary Standard Dosimetry Laboratory) in Bosnia and Herzegovina» has two main components. The first component mainly consists of technical assistance for the design of an SSDL with the view to become eventually member of the IAEA/WHO network. It will also contribute to drafting appropriate regulations in the field of metrology. The second component of the project deals with the supply and installation of the equipment, training of the personnel and establishment of a maintenance programme of the SSDL.
Service and supply contracts for an amount of respectively EUR 150,000 and EUR 250,000 will be concluded following tenders that will be launched in respectively Q1 2009 and Q1 2010. In addition a works contract, fully funded by the beneficiary organisation, should be led by the beneficiary organisation in order to refurbish and/or modernise the facility that will accommodate the laboratory.
Project no 3: «Management of unsealed radionuclides in medical establishments» focuses on the reduction of exposure to ionising radiation of workers in the main nuclear medicine departments of five hospitals and clinical centres of Bosnia and Herzegovina located in Sarajevo, Banja Luka, Zenica, Mostar and Tuzla. The project should start with the analysis of current management practices of radionuclides in these medical establishments and provide the technical basis for the launching of a subsequent supply contract. Most of the envisaged equipment would be dealing with the shielding of boxes and tanks containing radionuclides that would improve the safety and security of the management of radionuclides. It is also planned to provide dose-rate meters for the controlled areas in the hospitals. Installation and testing of the equipment is part of this activity as well as the organisation of training courses for the personnel. Regarding this, a close collaboration should be established with the IAEA.
Service and supply contracts for an amount of respectively EUR 100,000 and EUR 400,000 will be concluded following tenders that will be launched in respectively Q1 2009 and Q1 2010.
Project no 4: «Strengthening Administrative Capacity of the State Office for Nuclear Safety, regulatory body for the nuclear safety and security» in Croatia aims at improving the technical capacity of this regulatory body in two distinct areas: safeguards inspection of nuclear materials, and radioactive waste management and decommissioning of nuclear power plants. The assistance will consist of providing training courses, including on-the-job training, and scientific visits. It is important to underline that training on inspection of nuclear materials will aim at meeting the IAEA and EURATOM requirements. As for radioactive waste management and decommissioning, the support to be provided should focus in particular on the establishment of a decommissioning plan, cost assessment, management of the resulting radioactive waste and radiation protection issues.
One service contract for an EC contribution of EUR 252,000 should be launched in Q2 2009. The implementation of this project will be decentralised.
Project no 5: «Health Protection in Relation to Medical Exposure» is related to the reduction of the exposure of patients and workers to ionising radiation in medical establishments in Croatia. This project comprises notably the development of Quality Assurance programmes, the development of an Action Plan on quality management implementation both through equipment quality control and patient dose management, and the establishment of written protocols for each type of equipment generating ionising radiation. The project has a supply component which comprises in particular X-ray multimeters, test devices for quality control of film processing, and test Phantom for comprehensive image quality. Strengthening public awareness about exposure to ionising radiation due to medical exposure is part of the project. This will consist of preparing information material, organising public campaigns, creating a dedicated website and holding workshops for doctors involved in radio diagnostic procedures. The project should be concluded with a comprehensive evaluation of doses delivered to patients and evaluation of their contributions to the collective doses from various specific radiological techniques. Finally, the project will contribute to optimise doses to workers in medical establishments through the implementation of an intercomparison exercise.
Three service and a supply contracts for an amount of respectively EUR 250,000 and EUR 450,000 will be concluded following tenders that will be launched in Q2 2009.
The implementation of this project will be decentralised.
Project no 6: «Strengthening Radiation Protection and Nuclear Safety in Montenegro through Capability Upgrading of Technical Support Institution» is a supply project with aims at providing various types of equipment to the Centre for Ecotoxicological Research of Montenegro (CETI) that is acting as Technical Support Organisation to the Montenegrin regulatory body. The areas covered by this supply project are: monitoring of the radioactivity into the environment, radioactive waste management and transportation of radioactive materials, and medical exposure of patients and workers. The project should also provide training courses to the CETI staff, and finally contribute to the certification and accreditation of all CETI methods and activities dealing with radiation protection.
One supply contract for an amount of EUR 300,000 should be launched in Q2 2009. In addition another supply contract for an amount of EUR 95,000, fully funded by the beneficiary organisation, should be launched in Q2 2009 by the beneficiary organisation (CETI).
Project No 7: «Conditioning and secure storage of disused sealed radioactive sources» is part of the Vinca Nuclear Institute Decommissioning programme under development in Serbia. This project mainly aims at retrieving, characterising, conditioning, packaging and storing at least 2000 sealed radioactive sources of IAEA category 3-4. The assistance to the Vinca Institute will in particular contribute to design the new conditioning and storage facility for sealed radioactive sources, establish a safety analysis report for the new facility, set up an inventory of all radioactive sources and train the Vinca personnel.
Taking into account the important technical assistance activities being implemented and coordinated by the IAEA at Vinca, it was deemed worthwhile to implement the project in joint management with this Agency. In this way, overlapping of technical assistance is avoided and synergies can be developed.
A contribution agreement with the IAEA for an amount of EUR 616,000 will be concluded in Q1 2009 for the implementation of this project in accordance with the terms of the Financial and Administrative Framework Agreement (FAFA) between the European Community and the United Nations, signed on 29 April 2003, to which the IAEA adhered on 17 September 2004.
Project No 8: «Decommissioning of Degraded Waste Storage Hangar No 1» is part of the Vinca Nuclear Institute Decommissioning programme in Serbia. This project mainly aims at decommissioning an old and degraded storage facility for radioactive waste at Vinca. The EC support should mainly consist of providing assistance to the development of a decommissioning plan, the preparation of the associated safety analysis report, the characterisation of the facility, and to organise the decommissioning works via a tendering procedure.
Taking into account the important technical assistance activities being implemented and coordinated by the IAEA at Vinca, it was deemed worthwhile to implement the project in joint management with this Agency. In this way, overlapping of technical assistance is avoided and synergies can be developed.
A contribution agreement with the IAEA for an amount of EUR 1,200,000 will be concluded in Q1 2009 for the implementation of this project in accordance with the terms of the Financial and Administrative Framework Agreement (FAFA) between the European Community and the United Nations, signed on 29 April 2003, to which the IAEA adhered on 17 September 2004.
Project No 9:» Radioactivity survey» is part of the Vinca Nuclear Institute Decommissioning programme in Serbia. This project mainly aims at identifying the old facilities where radiological activities took place in the past at Vinca, at characterising them and – on this basis – to define a plan for future decommissioning and remediation activities together with a time schedule for implementation. This project comprises an important programme of sampling and measurement of radioactive samples.
Taking into account the important technical assistance activities being implemented and coordinated by the IAEA at Vinca, it was deemed worthwhile to implement the project in joint management with this Agency. In this way, overlapping of technical assistance is avoided and synergies can be developed.
A contribution agreement with the IAEA for an amount of EUR 588,000 will be concluded in Q1 2009 for the implementation of this project in accordance with the terms of the Financial and Administrative Framework Agreement (FAFA) between the European Community and the United Nations, signed on 29 April 2003, to which the IAEA adhered on 17 September 2004.
Project No 10: «Characterisation and conditioning of radioactive waste» is part of the Vinca Nuclear Institute Decommissioning programme in Serbia. This project mainly aims at operating the radioactive waste treatment and conditioning facility at Vinca. The activities of this project should provide expertise to the Vinca personnel on how to characterise, treat and condition drums of radioactive waste. As a result of this project, at least 500 waste drums should be processed and stored. In addition, the project should enable the completion of a database that will establish an inventory of all types of radioactive waste currently stored at Vinca.
Taking into account the important technical assistance activities being implemented and coordinated by the IAEA at Vinca, it was deemed worthwhile to implement the project in joint management with this Agency. In this way, overlapping of technical assistance is avoided and synergies can be developed.
A contribution agreement with the IAEA for an amount of EUR 611,000 will be concluded in Q1 2009 for the implementation of this project in accordance with the terms of the Financial and Administrative Framework Agreement (FAFA) between the European Community and the United Nations, signed on 29 April 2003, to which the IAEA adhered on 17 September 2004.
Project No 11:» Strengthening radiation safety capabilities and infrastructure» is part of the Vinca Nuclear Institute Decommissioning programme in Serbia. This project mainly aims at improving radiation protection issues and emergency preparedness at Vinca in particular during the implementation of the VIND projects. The technical assistance part of the project comprises a gap analysis of the current radiological assessment of the different activities to be implemented on the spot, whereas the investment part will provide equipment for the Vinca office building where radiation protection and emergency response teams will meet and work. In this context it is planned to purchase a mobile meteorological-ecological laboratory to complete the full capability for emergency preparedness.
Taking into account the important technical assistance activities being implemented and coordinated by the IAEA at Vinca, it was deemed worthwhile to implement the project in joint management with this Agency. In this way, overlapping of technical assistance is avoided and synergies can be developed.
A contribution agreement with the IAEA for an amount of EUR 163,000 will be concluded in Q1 2009 for the implementation of this project in accordance with the terms of the Financial and Administrative Framework Agreement (FAFA) between the European Community and the United Nations, signed on 29 April 2003, to which the IAEA adhered on 17 September 2004.
Project No 12: «Project Management Unit for EU supported projects» is a back-up project to the seven EU-funded projects implemented or to be implemented at Vinca that are totalling a budget of more than EUR 9 million. Through this project, assistance will be given in planning each project and activity; developing and maintaining project schedules, including the scheduling of each activity and input so as to ensure timely completion and successful achievement of the objectives and performance objectives.
Taking into account the important technical assistance activities being implemented and coordinated by the IAEA at Vinca, it was deemed worthwhile to implement the project in joint management with this Agency. In this way, overlapping of technical assistance is avoided and synergies can be developed.
A contribution agreement with the IAEA for an amount of EUR 500,000 will be concluded in Q1 2009 for the implementation of this project in accordance with the terms of the Financial and Administrative Framework Agreement (FAFA) between the European Community and the United Nations, signed on 29 April 2003, to which the IAEA adhered on 17 September 2004.
2. c Overview of past and on going assistance including lesson learned and donor coordination
Over the period 2001-2006 the nuclear activities conducted under the Phare nuclear safety programme addressed a number of radiological issues that are similar to those envisaged for the Western Balkans, e.g. regulatory assistance, management of sealed radioactive sources, radiation protection, management of radioactive waste, decommissioning of nuclear installations, and emergency preparedness. Most of these projects have been implemented according to the Decentralised Implementation System. They significantly improved the radiological situation in Central Europe and Eastern Countries which has become similar to the one existing in older EU Member States. The main lessons are related to the technical complexity of the projects that have generally required a longer time than expected for the preparation and finalisation of the related tender dossiers. Due to the rather limited technical capacity of some of the beneficiary organisations, the Commission services (at that time the Nuclear Task Force of DG ELARG) were deeply involved in the technical back-up to the EC Delegations in order to improve the quality of the documents. It is expected that a similar situation will be found in most of the Western Balkans. As a consequence, the technical capacity of DG ELARG should be reinforced in particular through an increased involvement of the Joint Research Centre in the preparation of the technical documentation associated to each project.
Management of radionuclides in medical establishments is part of the 2008 IPA horizontal programme on nuclear safety and radiation protection. The actions to be undertaken in particular in Bosnia and Herzegovina are fully in line with the conclusions of a technical seminar that was organised in 2007 in Brussels by the European Commission on the same issue, and which focussed on the situation existing in Bulgaria, Croatia and Romania.
Coordination with the Instrument for Nuclear Safety Cooperation (INSC) and the Instrument for Stability (IFS) is ensured through the discussion of the project fiches with the INSC and IFS Committee members.
More than half of the 2008 IPA nuclear projects will be implemented in joint management with the IAEA. The reason is that this international agency has already supported a number of projects in the Western Balkans notably in the field of regulatory assistance. In the particular case of Serbia, the IAEA is coordinating the activities to be implemented within the VIND programme, including the management of the funds allocated by several donors. Therefore a close collaboration with the IAEA is a prerequisite for most nuclear projects to be implemented in the Western Balkans. This coordination will be assured through joint monitoring meetings, circulation and analysis of technical reports and missions on the spot.
2.d Horizontal issues
The implementation of projects 1 to 12 will contribute to significantly improve the protection of man and the environment from ionising radiation in the Western Balkans. They will also contribute to decrease exposure to ionising radiation for patients and workers in medical establishments. As a general rule, enhancement of the capacity of nuclear safety authorities can only have a positive impact on the monitoring of the radioactivity and the control of radioactive materials in the whole Western Balkans.
2.e Conditions
The implementation of projects No 1, 2, 3, 7, 8, 9, under this programme is subject to the following prerequisite:
• National regulatory bodies in the field of nuclear safety and radiation protection have been set up by law and are operating at the time of the launching of the project (publication of the procurement notice).
The implementation of project No 5 requires a written agreement between all public hospitals and other public medical institutions in Croatia involved in the project.
2.f Benchmarks
* in case of parallel national co-financing
3. BUDGET (AMOUNTS IN EUR)
3.1. Indicative budget
3.1.1. Table for decentralised projects (Croatia)
* public contribution (private contributions are not taken into account (Article 67(1) IP A IR) under decentralised management).
(1) Expressed in % of the Total expenditure IB or INV (column (a) or (d)).
(2) Expressed in % of the grand total of column (h).
2.2.2. Table for centralised projects ((Bosnia and Herzegovina, Montenegro)
* Contribution (public and private national and/or international contribution) provided by national counterparts.
(1) Expressed in % of the Total expenditure IB or INV (column (a) or (d)).
(2) Expressed in % of the grand total of column (h).
3.1.3. Table for projects to be implemented in joint management with the IAEA
* Contribution (public and private national and/or international contribution) provided by national counterparts.
(1) Expressed in % of the Total expenditure IB or INV (column (a) or (d)).
(2) Expressed in % of the grand total of column (h).
3.1.4. Table summarising the IPA support according to the management mode adopted
(1) Expressed in % of the Total expenditure IB or INV (column (a) or (d)).
(2) Expressed in % of the grand total of column (h).
3.2 Principle of Co-Financing applying to the projects funded under the programme
For projects under decentralised management (projects No 4 and No 5), the Community contribution represents 82.21% of the total budget allocated to this part of the programme. This has been calculated in relation to the eligible expenditure, which is based on the public expenditure. Joint co-financing will be used as a rule. The requirements of co-financing for IB and INV at project level have been complied with.
For projects under centralised management (projects No 2, No 3 and No 6), the Community contribution represents 85.41% of the total budget allocated to this part of the programme. This has been calculated in relation to the eligible expenditure, which is based on the total expenditure. Parallel co-financing will be used. The requirements of co-financing for IB and INV at project level have been complied with for projects No 2 and No 6. For project No 3, since the rate of the Community contribution, which may amount to 100% of the eligible expenditure, has not been quantified yet. Therefore the level of co-financing could not be determined. Actually the possible level of co-financing will be known when the results of the feasibility study that will be implemented at the outset of the project, are available.
For projects in joint management with the International Atomic Energy Agency (projects No 1, No 7, No 8, No 9, No 10, No 11 and No 12), the Community contribution represents 89% of the total budget allocated to this part of the programme. This has been calculated in relation to the eligible expenditure, which is based on the total expenditure. Joint co-financing will be used. On account of its regional character, project No 1 is not co-financed. The other projects are co-financed by the IAEA and other donors. However the level of co-financing should be looked into in the light of the whole VIND programme the cost of which is much larger than the budget allocated to the projects abovementioned.
4. IMPLEMENTATION ARRANGEMENTS
4.1 Method of implementation
For projects No 2, No 3 and No 6 the programme will be implemented on a centralised basis by the European Commission in accordance with Article 53a of the Financial Regulation3 and the corresponding provisions of the Implementing Rules.64
Projects No 4 and No 5 shall be implemented by decentralised management, in accordance with article 53c of the Financial Regulation5and the corresponding provisions of the Implementing Rules.6 The Beneficiary will continue to ensure that the conditions laid down in Art. 56 of the Financial Regulation are respected at all times.
The ex-ante control by the Commission shall apply to the tendering of contracts, launch of call for proposals and the award of contracts and grants until the Commission allows for decentralised management without ex-ante controls as referred in Article 18 of the IPA Implementing Regulation.
For projects No 1, No 7, No 8, No 9, No 10, No 11 and No 12, the programme will be implemented by the European Commission by joint management with the International Atomic Energy Agency following Article 53.d of the Financial Regulation and the corresponding provisions of the Implementing Rules. To this end, the Commission and the IAEA will conclude two Contribution Agreements (one for project 1 and another one for all the other projects), in accordance with the Financial and Administrative Framework Agreement (FAFA).
4.2 General rules for procurement and grant award procedures
For projects No 2, No 3, No 4, No 5 and No 6 procurement shall follow the provisions of Part Two, Title IV of the Financial Regulation and Part Two, Title III, Chapter 3 of its Implementing Rules as well as the rules and procedures for service, supply and works contracts financed from the general budget of the European Communities for the purposes of cooperation with third countries adopted by the Commission on 24 May 2007 (C (2007)2034).
The Contracting authorities shall also use the procedural guidelines and standard templates and models facilitating the application of the above rules provided for in the «Practical Guide to contract procedures for EC external actions» («Practical Guide») as published on the EuropeAid website7 at the date of the initiation of the procurement or grant award procedure.
For projects No 1, No 7, No 8, No 9, No 10, No 11 and No 12, the general rules for procurement and grant award procedures shall be defined in the Contribution Agreement between the Commission and the IAEA implementing such programme/activity.
5. MONITORING AND EVALUATION
5.1 Monitoring
The Commission may undertake any actions it deems necessary to monitor the programmes concerned and for the projects under joint management with IAEA these actions may be carried out jointly with the IAEA.
Decentralised projects will be monitored through the IPA Monitoring Committee assisted by Transition Assistance and Institution Building Monitoring Committee, and the Joint Monitoring Committee.
They shall assess the effectiveness, quality and coherence of the implementation of this programme. They may make proposals to the Commission and the national IPA co-ordinator, with a copy to the national authorising officer, for decisions on any corrective measures to ensure the achievements of programme objectives and enhance the efficiency of the assistance provided.
5.2 Evaluation
Programmes shall be subject to ex-ante evaluations, as well as interim and, where relevant, ex-post evaluations in accordance with Articles 57 and 82 of the IPA Implementing Rules,8 with the aim of improving the quality, effectiveness and consistency of the assistance from Community funds and the strategy and implementation of the programmes.
The results of ex ante and interim evaluation shall be taken into account in the programming and implementation cycle.
The Commission may also carry out strategic evaluations.
For decentralised projects, after the conferral of management powers, the responsibility for carrying out interim evaluations shall lie with the beneficiary, without the Commission’s rights to perform any ad hoc interim evaluations of the programmes it deems necessary. Ex-post evaluation shall remain a prerogative of the Commission even after the conferral of management powers to the beneficiary.
6. AUDIT, FINANCIAL CONTROL, ANTIFRAUD MEASURES; FINANCIAL ADJUSTMENTS, PREVENTIVE MEASURES AND FINANCIAL CORRECTIONS
6.1 Audit, Financial Control and Anti-fraud measures
The accounts and operations of all parties involved in the implementation of this programme, as well as all contracts and agreements implementing this programme, are subject to, on the one hand, the supervision and financial control by the Commission (including the European Anti-Fraud Office), which may carry out checks at its discretion, either by itself or through an outside auditor and, on the other hand, audits by the European Court of Auditors. This includes measures such as ex-ante verification of tendering and contracting carried out by the Delegation in the Beneficiary.
In order to ensure the efficient protection of the financial interests of the Community, the Commission (including the European Anti-Fraud Office) may conduct on-the-spot checks and inspections in accordance with the procedures foreseen in Council Regulation (EC, Euratom) 2185/96.
The controls and audits described above are applicable to all contractors, subcontractors and grant beneficiaries who have received Community funds.
6.2 Financial adjustments
For decentralised projects, the national authorising officer, who bears in the first instance the responsibility for investigating all irregularities, shall make the financial adjustments where irregularities or negligence are detected in connection with the implementation of this programme, by cancelling all or part of the Community assistance. The national authorising officer shall take into account the nature and gravity of the irregularities and the financial loss to the Community assistance.
In case of an irregularity, including negligence and fraud, the national authorising officer shall recover the Community assistance paid to the beneficiary in accordance with national recovery procedures.
6.3 Audit trail
For decentralised projects, the national authorising officer shall ensure that all the relevant information is available to ensure at all times a sufficiently detailed audit trail. This information shall include documentary evidence of the authorisation of payment applications, of the accounting and payment of such applications, and of the treatment of advances, guarantees and debts.
6.4 Preventive Measures
For decentralised projects, Beneficiaries shall ensure investigation and effective treatment of suspected cases of fraud and irregularities and shall ensure the functioning of a control and reporting mechanism equivalent to that provided for in Commission Regulation 1828/2006. All suspected or actual cases of fraud and irregularity as well as all measures related thereto taken must be reported to the Commission services without delay. Should there be no suspected or actual cases of fraud or irregularity to report, the Beneficiary shall inform the Commission of this fact within two months following the end of each quarter.
Irregularity shall mean any infringement of a provision of applicable rules and contracts, resulting from an act or omission by an economic operator, which has, or would have, the effect of prejudicing the general budget of the European Union by charging an unjustified item of expenditure to the general budget.
Fraud shall mean any intentional act or omission relating to: the use or presentation of false, incorrect or incomplete statements or documents, which has as its effect the misappropriation or wrongful retention of funds from the general budget of the European Union or budgets managed by, or on behalf of, the European Union; non disclosure of information in violation of a specific obligation with the same effect; the misapplication of such funds for purposes other than those for which they are originally granted.
The Beneficiary shall take any appropriate measure to prevent and counter active and passive corruption practises at any stage of the procurement procedure or grant award procedure, as well as during the implementation of corresponding contracts.
Active corruption is defined as the deliberate action of whosoever promises or gives, directly or through an intermediary, an advantage of any kind whatsoever to an official for himself or for a third party for him to act or to refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties in a way which damages or is likely to damage the European Communities’ financial interests.
Passive corruption is defined as the deliberate action of an official, who, directly or through an intermediary, requests or receives advantages of any kind whatsoever, for himself or a third party, or accepts a promise of such advantage, to act or to refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties in a way which damages or is likely to damage the European Communities’ financial interests.
The authorities of the beneficiary, including the personnel responsible for the implementation of the programme, shall also undertake to take whatever precautions are necessary to avoid any risk of conflict of interest, and shall inform the Commission immediately of any such conflict of interest or any situation likely to give rise to any such conflict.
6.5 Financial corrections
For decentralised projects, in order to ensure that the funds are used in accordance with the applicable rules, the Commission shall apply clearance-of-accounts procedures or financial correction mechanisms in accordance with Article 53c (2) of the Financial Regulation and as detailed in the Framework Agreement concluded between the Commission and the beneficiary.
A financial correction may arise following:
(i) identification of a specific irregularity, including fraud; or
(ii) identification of a weakness or deficiency in the management and control systems of the beneficiary;
If the Commission finds that expenditure under this programme has been incurred in a way that has infringed applicable rules, it shall decide what amounts are to be excluded from Community financing.
The calculation and establishment of any such corrections, as well as the related recoveries, shall be made by the Commission following the criteria and procedures provided for in the IPA Implementing Regulation).
7. LIMITED CHANGES
Limited changes in the implementation of this programme affecting essential elements listed under Article 90 of the Implementing Rules to the Financial Regulation, which are of an indicative nature, may be undertaken by the authorising officer by delegation (AOD), or by the authorising officer by sub-delegation (AOSD), in line with the delegation of powers conferred upon him by the AOD, in accordance with the principles of sound financial management without an amending financing decision being necessary.
FRAMEWORK AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF CROATIA AND THE COMMISSION OF THE EUROPEAN COMMUNITIES DATED 27 AUGUST 2007
FRAMEWORK AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF CROATIA AND THE COMMISSION OF THE EUROPEAN COMMUNITIES ON THE RULES FOR CO-OPERATION CONCERNING EC-FINANCIAL ASSISTANCE TO THE REPUBLIC OF CROATIA IN THE FRAMEWORK OF THE IMPLEMENTATION OF THE ASSISTANCE UNDER THE INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA)
DATED 27 AUGUST 2007
Annexes:
ANNEX A: Functions and common responsibilities of the structures, authorities and bodies in accordance with Article 8 of the Framework Agreement between the Commission and the Government of the Republic of Croatia of 27 August 2007
ANNEX B: Model Statement of Assurance of the national authorising officer in accordance with Article 17 of the Framework Agreement between the Commission and the Government of the Republic of Croatia of 27 August 2007
ANNEX C: Model Annual Audit Activity Report of the audit authority of the Republic of Croatia in accordance with Article 29(2)(b) of the IPA Implementing Regulation
ANNEX D: Model Annual Audit Opinion of the audit authority of the Republic of Croatia in accordance with Article 29(2)(b) of the IPA Implementing Regulation
ANNEX E: Model Audit Opinion of the audit authority of the Republic of Croatia on the final statement of expenditure for the closure of a programme or parts of a programme in accordance with Article 29(2)(b) of the IPA Implementing Regulation
The Commission of the European Communities, hereinafter referred to as »the Commission«, acting for and on behalf of the European Community, hereinafter referred to as »the Community« on the one part,
and
the Government of the Republic of Croatia, acting on behalf of the Republic of Croatia, hereinafter referred to as »the Beneficiary« and together, jointly referred to as »the Contracting Parties«
Whereas
(1) On 1 August 2006, the Council of the European Union adopted Regulation (EC) No 1085/2006 of 17 July 2006() establishing an instrument for pre-accession assistance (hereinafter referred to as »IPA Framework Regulation»). With effect from the 1 January 2007, this new instrument constitutes the single legal basis for the provision of financial assistance to candidate countries and potential candidate countries in their efforts to enhance political, economic and institutional reforms with a view to become members of the European Union;
(2) On 12 June 2007, the Commission has adopted the regulation implementing the IPA Framework Regulation, detailing applicable management and control provisions;
(3) The new instrument for pre-accession assistance (IPA) replaces the five previously existing pre-accession instruments: Regulation (EEC) No 3906/1989 on economic aid to certain countries of Central and Eastern Europe, Regulation (EC) No 1267/1999 on the establishment of an instrument for structural policies for pre-accession, Regulation (EC) No 1268/1999 on the support for pre-accession measures for agriculture and rural development, Regulation (EC) No 2666/2000 on assistance for Albania, Bosnia and Herzegovina, Croatia, the Federal Republic of Yugoslavia and the Former Yugoslav Republic of Macedonia, repealing Regulation (EC) No 1628/96 and amending Regulations (EEC) No 3906/89 and (EEC) No 1360/90 and Decisions 97/256/EC and 1999/311/EC and Regulation (EC) No 2500/2001 on the financial assistance to Turkey;
(4) The Beneficiary is eligible under IPA as provided for in the IPA Framework Regulation and in Commission Regulation (EC) No 718/2007 of 12 June 2007() implementing the IPA Framework Regulation (hereinafter referred to as «IPA Implementing Regulation»);
(5) The Beneficiary figures in Annex I of the IPA Framework Regulation, and should therefore have access to the 5 components established under IPA, i.e. the Transition Assistance and Institution Building Component, the Cross-Border Co-operation Component, the Regional Development Component, the Human Resources Development Component and the Rural Development Component;
(6) It is therefore necessary to set out the rules for co-operation concerning EC financial assistance with the Beneficiary under IPA;
HAVE AGREED AS FOLLOWS:
Section I
GENERAL PROVISIONS
Article 1
INTERPRETATION
(1) Subject to any express provision to the contrary in this Framework Agreement, the terms used in this Agreement shall bear the same meaning as attributed to them in the IPA Framework Regulation and the IPA Implementing Regulation.
(2) Subject to any express provision to the contrary in this Framework Agreement, references to this Agreement are references to such Agreement as amended, supplemented or replaced from time to time.
(3) Any references to Council or Commission Regulations are made to the version of those regulations as indicated. If required, modifications of theses regulations shall be transposed into this Framework Agreement by means of amendments.
(4) Headings in this Agreement have no legal significance and do not affect its interpretation.
Article 2
PARTIAL INVALIDITY AND UNINTENTIONAL GAPS
If a provision of this Agreement is or becomes invalid or if this Agreement contains unintentional gaps, this will not affect the validity of the other provisions of this Agreement. The Contracting Parties will replace any invalid provision by a valid provision which comes as close as possible to the purpose of and intent of the invalid provision. The Contracting Parties will fill any unintentional gap by a provision which best suits the purpose and intent of this Agreement in compliance with the IPA Framework Regulation and the IPA Implementing Regulation.
Article 3
PURPOSE
(1) In order to promote co-operation between the Contracting Parties and to assist the Beneficiary in its progressive alignment with the standards and policies of the European Union, including, where appropriate the acquis communautaire, with a view to membership, the Contracting Parties agree to implement activities in the various fields as specified in the two regulations mentioned above and as applicable to the Beneficiary.
(2) The assistance activities shall be financed and implemented within the legal, administrative and technical framework laid down in this Agreement and as further detailed in Sectoral Agreements and/or Financing Agreements, if any.
(3) The Beneficiary takes all necessary steps in order to ensure the proper execution of all assistance activities and to facilitate the implementation of the related programmes.
Article 4
GENERAL RULES ON FINANCIAL ASSISTANCE
(1) The following principles shall apply to financial assistance by the Community under IPA:
a) Assistance shall respect the principles of coherence, complementarity, co-ordination, partnership and concentration;
b) Assistance shall be coherent with EU policies and shall support alignment to the acquis communautaire;
c) Assistance shall comply with the budgetary principles laid down in Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002() on the Financial Regulation applicable to the general budget of the European Communities (hereinafter referred to as »Financial Regulation») and its Implementing Rules;
d) Assistance shall be consistent with the needs identified in the enlargement process and absorption capacities of the Beneficiary. It shall also take account of lessons learned;
e) The ownership of the programming and implementation of assistance by the Beneficiary shall be strongly encouraged and adequate visibility of EU intervention shall be ensured;
f) Operations shall be properly prepared, with clear and verifiable objectives, which are to be achieved within a given period; the results obtained should be assessed through clearly measurable and adequate indicators;
g) Any discrimination based on sex, racial or ethnic origin, religion or belief, disability, age or sexual orientation shall be prevented during the various stages of the implementation of assistance;
h) The objectives of pre-accession assistance shall be pursued in the framework of sustainable development and the Community promotion of the goal of protecting and improving the environment.
(2) Assistance for the Beneficiary shall be based on the priorities identified in the existing documents, i.e. the European Partnership, the Accession partnership, the national programme for the adoption of the acquis communautaire, the reports and strategy paper contained in the annual enlargement package of the Commission, the Stabilisation and Association Agreement and the negotiation framework.
(3) All operations receiving assistance under IPA shall in principle require co-financing by the Beneficiary and the Community, unless otherwise agreed upon in a Sectoral Agreement or Financing Agreement.
(4) Where the execution of activities depends on financial commitments from the Beneficiary’s own resources or from other sources of funds, the funding of the Community shall become available at such time as the financial commitments of the Beneficiary and/or the other sources of funds themselves become available.
(5) The provision of Community financing under IPA shall be subject to the fulfilment by the Beneficiary’s obligations under this Framework Agreement and under Sectoral Agreements and Financing Agreements, if any.
Article 5
IMPLEMENTATION METHODS
(1) For the implementation of assistance under IPA in the Republic of Croatia, decentralised management, whereby the Commission confers the management of certain actions on the Beneficiary, while retaining overall final responsibility for general budget execution in accordance with Article 53c of the Financial Regulation and the relevant provisions of the EC Treaties, shall apply as a rule. Decentralised management shall cover at least tendering, contracting and payments by the national administration of the Beneficiary. Operations shall be implemented in accordance with the provisions laid down in Article 53c of the Financial Regulation and the ones referred to in this article.
(2) However, the Contracting Parties may agree to make use of
a) centralised management as defined in Article 53a of the Financial Regulation under the Transition Assistance and Institution Building Component, in particular for regional and horizontal programmes, and under the Cross-Border Co-operation Component. It may also be used for technical assistance under any of the IPA components. Operations shall be implemented in accordance with the provisions laid down in Articles 53 point (a), 53a and 54 to 57 of the Financial Regulation.
b) joint management as defined in Article 53d of the Financial Regulation for the Transition Assistance and Institution Building Component, in particular for regional and horizontal programmes, and for programmes involving international organisations. Operations shall be implemented in accordance with the provisions laid down in Articles 53 point (c) and 53d of the Financial Regulation.
c) shared management as defined in Article 53b of the Financial Regulation under the Cross-Border Co-operation Component, for cross-border programmes involving Member States of the European Union. Operations shall be implemented in accordance with the provisions laid down in Articles 53 point (b), 53b and Title II of Part two of the Financial Regulation. The following particular provision shall be taken into account in the implementation of cross-border programmes with Member States.
Where one or more Member States of the European Union and the Beneficiary participating in a cross-border programme are not yet ready for implementation of the whole programme under shared management, the part of the programme concerning the Member State(s) shall be implemented in accordance with Title II (Cross-Border Co-operation Component), Chapter III, Section 2 of the IPA Implementing Regulation (Articles 101 to 138) and the part of the programme concerning the Beneficiary shall be implemented in accordance with Title II, Chapter III, Section 3 of the IPA Implementing Regulation. (Articles 139 to 146 IPA Implementing Regulation, with the exception of Article 142. The provisions concerning the joint monitoring committee of Article 110 shall apply).
(3) If required by the related Financing Decision, the Commission and the Beneficiary shall conclude a Financing Agreement in accordance with Article 8 of the IPA Implementing Regulation on multi-annual or annual programmes. Financing Agreements may be concluded between the Commission and several beneficiary countries under IPA including the Beneficiary for assistance for multi-country programmes and horizontal initiatives.
(4) This Framework Agreement shall apply to all Financing Agreements concluded between the Contracting Parties for the financial assistance under IPA. Where they exist, Sectoral Agreements related to a given component shall apply to all Financing Agreements concluded under that component. Where there is no Financing Agreement, the rules included in this Framework Agreement apply together with Sectoral Agreements, if any.
Section II
MANAGEMENT STRUCTURES AND AUTHORITIES
Article 6
ESTABLISHMENT AND DESIGNATION OF STRUCTURES AND AUTHORITIES FOR DECENTRALISED MANAGEMENT
(1) The following structures and authorities must be designated by the Beneficiary in the event of decentralised management:
a) The competent accrediting officer (CAO);
b) The national IPA co-ordinator (NIPAC);
c) The strategic coordinator for the Regional Development Component and the Human Resources Development Component;
d) The national authorising officer (NAO);
e) The national fund (NF);
f) Operating structures per component or programme to deal with the management and implementation of assistance under the IPA Regulation;
g) The audit authority.
(2) Specific bodies may be established within the overall framework defined by the bodies and authorities described above within or outside the operating structures initially designated. The Beneficiary shall ensure that the final responsibility for the functions of operating structures shall remain with the operating structure initially designated. Such a restructuring shall be formalised in written agreements or governmental acts and shall be subject to accreditation by the national authorising officer and the conferral of management by the Commission.
(3) The Beneficiary shall ensure that appropriate segregation of duties applies to the bodies and authorities mentioned under paragraph 1 and 2 above in accordance with Article 56 of the Financial Regulation. Duties are segregated when different tasks related to a transaction are allocated to different staff, thereby helping to ensure that each separate task has been properly undertaken.
Article 7
ESTABLISHMENT AND DESIGNATION OF STRUCTURES AND AUTHORITIES FOR CENTRALISED OR JOINT MANAGEMENT
(1) In the event of centralised or joint management the national IPA co-ordinator shall act as the representative of the Beneficiary vis-ŕ-vis the Commission. He shall ensure that a close link is maintained between the Commission and the Beneficiary with regard both to the general accession process and to EU pre-accession assistance under IPA.
(2) The national IPA co-ordinator shall also be responsible for co-ordinating the Beneficiary’s participation in the relevant cross-border programmes, both with Member States and with other Beneficiary countries, as well as in the trans-national, interregional or sea basins programmes under other Community instruments. He may delegate the tasks relating to this latter responsibility to a cross-border co-operation co-ordinator.
(3) In the case of the Cross-border Co-operation Component, operating structures shall be designated and put in place by the Beneficiary, in accordance with Article 139 of the IPA Implementing Regulation.
Article 8
FUNCTIONS AND COMMON RESPONSIBILITIES OF THE STRUCTURES, AUTHORITIES AND BODIES
(1) The bodies and authorities mentioned in Article 6 above shall be allocated the functions and common responsibilities as set out in ANNEX A to this Framework Agreement.
(2) Component-related specific allocations of functions and responsibilities may be set out in Sectoral Agreements or Financing Agreements. They must not be in contradiction to the basic approach chosen for the allocation of functions and common responsibilities as shown in ANNEX A.
(3) Where under decentralised management specific persons have been given responsibility for an activity in relation to the management, implementation and control of programmes, the Beneficiary shall enable such persons to exercise the duties associated with that responsibility including in cases where, there is no hierarchical link between them and the bodies participating in that activity. The Beneficiary shall, in particular, provide those persons with the authority to establish, through formal working arrangements between them and the bodies concerned:
a) an appropriate system for the exchange of information, including the power to require information and a right of access to documents and staff on the spot, if necessary;
b) the standards to be met;
c) the procedures to be followed.
Section III
ACCREDITATION AND CONFERRAL OF MANAGEMENT POWERS UNDER DECENTRALISED MANAGEMENT
Article 9
COMMON REQUIREMENTS
Management relating to a component, a programme or a measure can only be conferred on the Republic of Croatia, if and when the following requirements are fulfilled:
a) The Beneficiary meets the conditions set to Article 56 of the Financial Regulation, in particular as regards the management and control systems. The management and control systems set up in the Republic of Croatia shall provide for effective and efficient control in at least the areas set out in the Annex to the IPA Implementing Regulation and as listed under No 1 c) of ANNEX A to this Framework Agreement. The Contracting Parties may define further provisions in Sectoral Agreements or Financing Agreements.
b) The competent accrediting officer has given accreditation to the national authorising officer both
• as the head of the national fund bearing overall responsibility for the financial management of EU funds in the Republic of Croatia and being responsible for the legality and regularity of the underlying transactions;
• with regard to national authorising officer’s capacity to fulfil the responsibilities for the effective functioning of management and control systems under IPA.
The accreditation of the national authorising officer shall also cover the national fund as described in Annex A, 5.
c) The national authorising officer has given accreditation to the relevant operating structures.
Article 10
PROCEDURE FOR ACCREDITATION OF THE NATIONAL AUTHORISING OFFICER AND THE NATIONAL FUND BY THE COMPETENT ACCREDITING OFFICER
(1) Accreditation of the national authorising officer in accordance with Article 11 of the IPA Implementing Regulation is subject to his fulfilment of the applicable requirements set out in Article 11 of the said regulation and as further defined in Annex A, 4. This accreditation shall be supported by an audit opinion drawn up by an external auditor functionally independent from all actors in the management and control system. The audit opinion shall be based on examinations conducted according to internationally accepted auditing standards.
(2) The competent accrediting officer shall notify the Commission of the accreditation of the national authorising officer, not later than the notification of the accreditation of the first operating structure. The competent accrediting officer shall provide all relevant supporting information required by the Commission.
(3) The competent accrediting officer shall immediately inform the Commission of any changes concerning the national authorising officer or the national fund. Where a change affects the national authorising officer or the national fund in relation to the applicable requirements as set out in Article 11 of the IPA Implementing Regulation, the competent accrediting officer shall send to the Commission an assessment of the consequences of such a change on the validity of the accreditation. Where such a change is significant, the competent accrediting officer shall also notify the Commission of his decision concerning the accreditation.
Article 11
PROCEDURE FOR ACCREDITATION OF OPERATING STRUCTURES BY THE NATIONAL AUTHORISING OFFICER
(1) Accreditation of an operating structure is subject to its fulfilment of the requirements set out in Article 11 of the IPA Implementing Regulation. This assurance shall be supported by an audit opinion drawn up by an external auditor functionally independent from all actors in the management and control system. The audit opinion shall be based on examinations conducted according to internationally accepted auditing standards.
(2) The national authorising officer shall notify the Commission of the accreditation of the operating structures and shall provide all relevant supporting information required by the Commission, including a description of the management and control systems.
Article 12
PROCEDURE FOR CONFERRAL OF MANAGEMENT POWERS BY THE COMMISSION
(1) The Commission shall confer management powers on the Beneficiary, only after the bodies and authorities referred to in Article 6 above have been designated and put in place and the conditions laid down in this article are fulfilled.
(2) Before the conferral of management powers, the Commission shall review the accreditations of the national authorising officer and the operating structures as laid down in Articles 10 and 11 above and examine the procedures and structures of any of the bodies or authorities concerned within the Republic of Croatia. This may include on-the-spot verifications by the services of the Commissions or subcontracted to an audit firm.
(3) The Commission may, in its decision to confer management powers, set further conditions, with a view to ensuring that the requirements referred to in Article 11 of the IPA Implementing Regulation are met. These further conditions must be fulfilled within a fixed period determined by the Commission for the conferral of management powers to remain effective.
(4) The Commission Decision on the conferral of management powers shall lay down the list of the ex-ante controls, if any, to be performed by the Commission on the tendering of contracts, launch of calls for proposals and the award of contracts and grants. This list may vary with the component or the programme. The ex-ante controls shall apply, depending on the component or programme, until the Commission allows for decentralised management without ex-ante controls as referred to in Article 16 below.
Article 13
WITHDRAWAL OR SUSPENSION OF THE ACCREDITATION OF THE NATIONAL AUTHORISING OFFICER AND THE NATIONAL FUND
(1) After the conferral of management powers by the Commission, the competent accrediting officer shall be responsible for monitoring the continuing fulfilment of all the requirements for this accreditation to be maintained and shall inform the Commission of any significant change related thereto.
(2) If any of the applicable requirements set out in Article 11 of the IPA Implementing Regulation, are not, or are no longer, fulfilled, the competent accrediting officer shall either suspend or withdraw the accreditation of the national authorising officer, and shall immediately inform the Commission of his decision and of the reasons for his decision. The competent accrediting officer shall assure himself that those requirements are again fulfilled before restoring the accreditation. This assurance shall be supported by an audit opinion as specified in Article 10(1) above.
(3) Where the accreditation of the national authorising officer is withdrawn or suspended by the competent accrediting officer, the following provisions shall apply:
• The Commission shall cease to make transfers of funds to the Beneficiary during the period when the accreditation is not in force;
• During the period when the accreditation is not in force, all the euro accounts or the euro accounts for the components concerned shall be blocked and no payment made by the National Fund from those euros accounts which are blocked shall be considered eligible for Community funding;
• Without prejudice to any other financial corrections, the Commission may make financial corrections as laid down in Article 30 below against the Beneficiary in respect of its past non-compliance with the requirements for the conferral of management powers.
Article 14
WITHDRAWAL OR SUSPENSION OF THE ACCREDITATION OF THE OPERATING STRUCTURES
(1) After the conferral of management powers by the Commission, the national authorising officer shall be responsible for monitoring the continuing fulfilment of all the requirements for this accreditation to be maintained and shall inform the Commission and the competent accrediting officer of any significant change related thereto.
(2) If any of the requirements set out in Article 11 of the IPA Implementing Regulation are not, or are no longer, fulfilled, the national authorising officer shall either suspend or withdraw the accreditation of the operating structure concerned, and shall immediately inform the Commission and the competent accrediting officer of his decision and of the reasons for his decision.
The national authorising officer shall assure himself that those requirements are again fulfilled before restoring the accreditation concerned. This assurance shall be supported by an audit opinion as referred to in Article 11(1) above.
(3) Where the accreditation of an operating structure is withdrawn or suspended by the national authorising officer, the following provisions shall apply.
• The Commission shall make no transfers to the Beneficiary of funds relating to programmes or operations implemented by the operating structure concerned while its accreditation is suspended or withdrawn;
• Without prejudice to any other financial corrections, the Commission may make financial corrections as laid down in Article 30 below against the Beneficiary in respect of its past non-compliance with the requirements and conditions for the conferral of management powers;
• No new legal commitments made by the operating structure concerned shall be considered eligible during the period when the accreditation is not in force;
• The national authorising officer shall be responsible for taking any appropriate safeguard measures regarding payments made or contracts signed by the operating structure concerned.
Article 15
WITHDRAWAL OR SUSPENSION OF CONFERRAL OF MANAGEMENT POWERS
(1) The Commission shall monitor compliance with the requirements set out in Article 11 of the IPA Implementing Regulation.
(2) Irrespective of the decision by the competent accrediting officer to maintain, suspend or withdraw the accreditation of the national authorising officer, or of the decision by the national authorising officer to maintain, suspend or withdraw the accreditation of the operating structure, the Commission may withdraw or suspend the conferral of management powers at any time, in particular in the event that any of the requirements mentioned in Article 11 of the IPA Implementing Regulation are not, or no longer, fulfilled.