ZASTUPNIČKI DOM HRVATSKOGA DRŽAVNOG SABORA
Na osnovi članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU ZAJEDNIČKE KONVENCIJE
O SIGURNOSTI ZBRINJAVANJA ISTROŠENOG GORIVA I SIGURNOSTI ZBRINJAVANJA RADIOAKTIVNOG
OTPADA
Proglašavam Zakon o potvrđivanju Zajedničke konvencije o sigurnosti
zbrinjavanja istrošenog goriva i sigurnosti zbrinjavanja radioaktivnog
otpada, koji je donio Zastupnički dom Hrvatskoga državnog sabora na sjednici
5. veljače 1999.
Broj: 081-99-2691/1
Zagreb, 9. veljače 1999.
Predsjednik
Republike Hrvatske
dr. Franjo Tuđman, v. r.
ZAKON
O POTVRĐIVANJU ZAJEDNIČKE KONVENCIJE O SIGURNOSTI ZBRINJAVANJA
ISTROŠENOG GORIVA I SIGURNOSTI ZBRINJAVANJA RADIOAKTIVNOG OTPADA
Članak 1.
Potvrđuje se Zajednička konvencija o sigurnosti zbrinjavanja istrošenog
goriva i sigurnosti zbrinjavanja radioaktivnog otpada (u daljnjem tekstu:
Zajednička konvencija) usvojena 5. rujna 1997. u Beču i potpisana u ime
Republike Hrvatske 9. travnja 1998., u izvorniku na arapskom, kineskom,
engleskom, francuskom, ruskom i španjolskom jeziku.
Članak 2.
Tekst Zajedničke konvencije u izvorniku na engleskom jeziku i u prijevodu
na hrvatski jezik, glasi:
JOINT CONVENTION ON THE SAFETY OF SPENT FUEL MANAGEMENT
AND ON THE SAFETY OF RADIOACTIVE WASTE MANAGEMENT
PREAMBLE
The Contracting Parties
(I) Recognizing that the operation of nuclear reactors generates spent
fuel and radioactive waste and that other applications of nuclear technologies
also generate radioactive waste;
(II) Recognizing that the same safety objectives apply both to spent
fuel and radioactive waste management;
(III) Reaffirming the importance to the international community of ensuring
that sound practices are planned and implemented for the safety of spent
fuel and radioactive waste management;
(IV) Recognizing the importance of informing the public on issues regarding
the safety of spent fuel and radioactive waste management;
(V) Desiring to promote an effecitve nuclear safety culture worldwide;
(VI) Reaffirming that the ultimate responsibility for ensuring the safety
of spent fuel and radioactive waste management rests with the State;
(VII) Recognizing that the definition of a fuel cycle policy rests with
the State, some States considering spent fuel as a valuable resource that
may be reprocessed, others electing to dispose of it;
(VIII) Recognizing that spent fuel and radioactive waste excluded from
the present Convention because thay are within military or defence programmes
should be managed in accordance with the objectives stated in this Convention;
(IX) Affirming the importance of international co-operation in enhancing
the safety of spent fuel and radioactive waste management through bilateral
and multilateral mechanisms, and through this incentive Convention;
(X) Mindful of the needs of developing countries, and in particular
the least developed countries, and of States with economies in transition
and of the need to facilitate existing mechanisms to assist in the fulfillment
of their rights and obligations set out in this incentive Convention;
(XI) Convinced that radioactive waste should, as far as in compatible
with the safety of the management of such material, be disposed of in the
State in which it was generated, whilst recognizing that, in certain circumstances,
safe and efficient management of spent fuel and radioactive waste might
be fostered through agreements among Contracting Parties to use facilities
in one of them for the benefit of the other Parties, particularly where
waste originates from joint projects;
(XII) Recognizing that any State has the right to ban import into its
territory of foreign spent fuel and radioactive waste;
(XIII) Keeping in mind the Convention on Nuclear Safety (1994), the
Convention on Early Notification of a Nuclear Accident (1986), the Convention
on Assistance in the Case of a Nuclear Accident or Radiological Emergency
(1986), the Convention on the Physical Protection of Nuclear Material (1980),
the Convention on the Prevention of Marine Pollution by Dumping of Wastes
and Other Matter as amended (1994) and other relevant international instruments;
(XIV) Keeping in mind the principles contained in the interagency »International
Basic Safety Standards for Protection against lonizing Radiation and for
the Safety of Radiation Sources« (1996), in the IAEA Safety Fundamentals
entitled »The Principles of Radioactive Waste Management« (1995), and in
the existing international standards relating to the safety of the transport
of radioactive materials;
(XV) Recalling Chapter 22 of Agenda 21 by the United Nations Conference
on Environment and Development in Rio de Janeiro adopted in 1992, which
reaffirms the paramount importance of the safe and environmentally sound
management of radioactive waste;
(XVI) Recognizing the desirability of strengthening the international
control system applying specifically to radioactive materials as referred
to in Article 1 (3) of the Basel Convention on the Control of Transboundary
Movements of Hazardous Wastes and Their Disposal (1989);
Have agreed as follows:
CHAPTER 1
OBJECTIVES DEFINITIONS AND SCOPE OF APPLICATION
Article 1
OBJECTIVES
The objectives of this Convention are:
(I) to achieve and maintain a high level of safety worldwide in spent
fuel and radioactive waste management, through the enhancement of national
measures and international co-operation, including where appropriate, safety-related
technical co-operation;
(II) to ensure that during all stages of spent fuel and radioactive
waste management there are effective defenses against potential hazards
so that individuals, society and the environment are protected from harmful
effects of ionising radiation, now and in the future, in such a way that
the needs and aspirations of the present generation are met without compromising
the ability of future generations to meet their needs and aspirations;
(III) to prevent accidents with radiological consequences and to mitigate
their consequences should they occur during any stage of spent fuel or
radioactive waste management.
Article 2
DEFINITIONS
For the purposes of this Convention:
(a) »closure« means the completion of all operations at some
time after the emplacement of spent fuel or radioactive waste in a disposal
facility. This includes the final engineering or other work required to
bring the facility to a condition that will be safe in the long term;
(b) »decommissioning« means all steps leading to the release
of a nuclear facility, other than a disposal facility, from regulatory
control. These steps include the processes of decontamination and dismantling;
(c) »discharges« means planned and controlled releases into the
environment, as a legitimate practice, within limits authorized by the
regulatory body, of liquid or gaseous radioactive materials that originate
from regulated nuclear facilities during normal operation;
(d) »disposal« means the emplacement of spent fuel or radioactive
waste in an appropriate facility without the intention of retrieval;
(e) »licence« means any authorization, permission or certification
granted by a regulatory body to carry any activity related to management
of spent fuel or of radioactive waste;
(f) »nuclear facility« means a civilian facility and its associated
land, buildings and equipment in which radioactive materials are produced,
processed, used, handled, stored or disposed of on such a scale that consideration
of safety is required;
(g) »operating lifetime« means the period during which a spent
fuel or a radioactive waste management facility is used for its intended
purpose. In the case of a disposal facility, the period begins when spend
fuel or radioactive waste is first emplaced in the facility and ends upon
closure of the facility;
(h) »radioactive waste« means radioactive material in gaseous,
liquid or solid form for which no further use is foreseen by the Contracting
Party or bay a natural or legal person whose decision is accepted by the
Contracting Party, and which is controlled as radioactive waste by a regulatory
body under the legislative and regulatory framework of the Contracting
Party;
(i) »radioactive waste management« means all activities, including
decommissioning activities, that relate to the handling, pretreatment,
treatment, conditioning, storage, or disposal of radioactive waste, excluding
off-site transportation. It may also involve discharges;
(j) »radioactive waste management facility« means any facility
or installation the primary purpose of which is radioactive waste management,
including a nuclear facility in the process of being decommissioned only
if it is designated by the Contracting Party as a radioactive waste management
facility;
(k) »regulatory body« means any body or bodies given the legal
authority by the Contracting Party to regulate any aspect of the safety
of spent fuel or radioactive waste management including the granting of
licences;
(l) »reprocessing« means a process or operation, the purpose
of which is to extract radioactive isotopes from spent fuel for further
use;
(m) »sealed source« means radioactive material that is permanently
sealed in a capsule or closely bonded and in a solid form, excluding reactor
fuel elements;
(n) »spent fuel« means nuclear fuel that has been irradiated
in and permanently removed from a reactor core;
(o) »spent fuel management« means all activities that relate
to the handling or storage of spent fuel, excluding off-site transportation.
It may also involve discharges;
(p) »spent fuel management facility« means any facility or installation
the primary purpose of which is spent fuel management;
(q) »State of destination« means a State to which a transboundary
movement is planned or takes place;
(r) »State of origin« means a State from which a transboundary
movement is planned to be initiated or is initiated;
(s) »State of transit« means any State, other then a State of
origin or a State of destination, through whose territory a transboundary
movement is planned or takes place;
(t) »storage« means the holding of spent fuel or of radioactive
waste in a facility that provides for its containment, with the intention
of retrieval;
(u) »transboundary movement« means any shipment of spent fuel
or of radioactive waste from a State of origin to a State of destination.
Article 3
SCOPE OF APPLICATION
1. This Convention shall apply to the safety of spent fuel management
when the spent fuel results from the operation of civilian nuclear reactors.
Spent fuel held at reprocessing facilities as part of a reprocessing activity
is not covered in the scope of this Convention unless the Contracting Party
declares reprocessing to be part of spent fuel management.
2. This Convention shall also apply to the safety of radioactive waste
management when the radioactive waste results from civilian applications.
However, this Convention shall not apply to waste that contains only naturally
occurring radioactive materials and that does not originate from the nuclear
fuel cycle, unless it constitutes a disused sealed source or it is declared
as radioactive waste for the purposes of this Convention by the Contracting
Party.
3. This Convention shall not apply to the safety of management of spent
fuel or radioactive waste within military or defence programmes, unless
declared as spent fuel or radioactive waste for the purposes of this Convention
by the Contracting Party. However, this Convention shall apply to the safety
of management of spent fuel and radioactive waste from military of defence
programmes if and when such materials are transferred permanently to and
managed within exclusively civilian programmes.
4. This Convention shall also apply to discharges as provided for in
Articles 4, 7, 11, 14, 24 and 26.
CHAPTER 2
SAFETY OF SPENT FUEL MANAGEMENT
Article 4
GENERAL SAFETY REQUIREMENTS
Each Contracting Party shall take the appropriate steps to ensure that
at all stages of spent fuel management, individuals, society and the environment
are adequately protected against radiological hazards.
in so doing, each Contracting Party shall take the appropriate steps
to:
(I) ensure that criticality and removal of residual heat generated during
spent fuel management are adequately addressed;
(II) ensure that the generation of radioactive waste associated with
spent fuel management is kept to the minimum practicable, consistent with
the type of fuel cycle policy adopted;
(III) take into account interdependencies among the different steps
in spent fuel management;
(IV) provide for effective protection of individuals, society and the
environment, by applying at the national level suitable protective methods
as approved by the regulatory body, in the framework of its national legislation
which has due regard to internationally endorsed criteria and standards;
(V) take into account the biological, chemical and other hazards that
may be associated with spent fuel management;
(VI) strive to avoid actions that impose reasonably predictable impacts
on future generations greater than those permitted for the current generation;
(VII) aim to avoid imposing undue burdens on future generations.
Article 5
EXISTING FACILITIES
Each Contracting Party shall take the appropriate steps to review the
safety of any spent fuel management facility existing at the time the Convention
enters into force fot that Contracting Party and to ensure that, if necessary,
all reasonably practicable improvements are made to upgrade the safety
of such a facility.
Article 6
SITING OF PROPOSED FACILITIES
1. Each Contracting Party shall take the appropriate steps to ensure
that procedures are established and implemented for a proposed spent fuel
management facility:
(I) to evaluate all relevant site-related factors likely to affect the
safety of such a facility during its operating lifetime;
(II) to evaluate the likely safety impact of such a facility on individuals,
society and the environment;
(III) to make information on the safety of such a facility available
to members of the public;
(IV) to consult Contracting Parties in the vicinity of such a facility,
insofar as they are likely to be affected by that facility, and provide
them, upon their request, with general data relating to the facility to
enable them to evaluate the likely safety impact of the facility upon their
territory.
2. In so doing, each Contracting Party shall take the appropriate steps
to ensure that such facilities shall not have unacceptable effects on other
Contracting Parties by being sited in accordance with the general safety
requirements of Article 4.
Article 7
DESIGN AND CONSTRUCTION OF FACILITIES
Each Contracting Party shall take the appropriate steps to ensure that:
(I) the design and construction of a spent fuel management facility
provide for suitable measures to limit possible radiological impacts on
individuals, society and the environment, including those from discharges
or uncontrolled releases;
(II) at the design stage, conceptual plans and, as necessary, technical
provisions for the decommissioning of a spent fuel management facility
are taken into account;
(III) the technologies incorporated in the design and construction of
a spent fuel management facility are supported by experience, testing or
analysis.
Article 8
ASSESSMENT OF SAFETY OF FACILITIES
Each Contracting Party shall take the appropriate steps to ensure that:
(I) before construction of a spent fuel management facility, a systematic
safety assessment and an environmental assessment appropriate to the hazard
presented by the facility and covering its operating lifetime shall be
carried out;
(II) before the operation of a spent fuel management facility, updated
and detailed versions of the safety assessment and of the environmental
assessment shall be prepared when deemed necessary to complement the assessments
referred to in paragraph (I).
Article 9
OPERATION OF FACILITIES
Each Contracting Party shall take the appropriate steps to ensure that:
(I) the licence to operate a spent fuel management facility is based
upon appropriate assessments as specified in Article 8 and is conditional
on the completion of a commissioning programme demonstrating that the facility,
as constructed, is consistent with design and safety requirements;
(II) operational limits and conditions derived from tests, operational
experience and the assessments, as specified in Article 8, are defined
and revised as necessary;
(III) operation, maintenance, monitoring, inspection and testing of
a spent fuel management facility are conducted in accordance with established
procedures;
(IV) engineering and technical support in all safety-related fields
are available throughout the operating lifetime of a spent fuel management
facility;
(V) incidents significant to safety are reported in a timely manner
by the holder of the licence to the regulatory body;
(VI) programmes to collect and analyse relevant operating experience
are established and that the results are acted upon, where appropriate;
(VII) decommissioning plans for a spent fuel management facility are
prepared and updated, as necessary, using information obtained during the
operating lifetime of that facility, and are reviewed by the regulatory
body.
Article 10
DISPOSAL OF SPENT FUEL
If, pursuant to its own legislative and regulatory framework, a Contracting
Party has designated spent fuel for disposal, the disposal of such spent
fuel shall be in accordance with the obligations of Chapter 3 relating
to the disposal of radioactive waste.
CHAPTER 3
SAFETY OF RADIOACTIVE WASTE MANAGEMENT
Article 11
GENERAL SAFETY REQUIREMENTS
Each Contracting Party shall take the appropriate steps to ensure that
at all stages of radioactive waste management individuals, society and
the environment are adequately protected against radiological and other
hazards.
In so doing, each Contracting Party shall take the appropriate steps
to:
(I) ensure that criticality and removal of residual heat generated during
radioactive waste management are adequately addressed;
(II) ensure that the generation of radioactive waste is kept to the
minimum practicable;
(III) take into account interdependencies among the different steps
in radioactive waste management;
(IV) provide for effective protection of individuals, society and the
environment, by applying at the national level suitable protective methods
as approved by the regulatory body, in the framework of its national legislation
which has due regard to internationally endorsed criteria and standards;
(V) take into account the biological, chemical and other hazards that
may be associated with radioactive waste management;
(VI) strive to avoid actions that impose reasonably predictable impacts
on future generations greater than those permitted for the current generation;
(VII) aim to avoid imposing undue burdens on future generations.
Article 12
EXISTING FACILITIES AND PAST PRACTICES
Each Contracting Party shall due course take the appropriate steps to
review:
(I) the safety of any radioactive waste management facility existing
at the time the Convention enteres into force for that Contracting Party
and to ensure that, if necessary, all reasonably practicable improvements
are made to upgrade the safety of such a facility;
(II) the results of past practices in order to determine whether any
intervention is needed for reasons of radiation protection bearing in mind
that the reduction in detriment resulting from the reduction in dose should
be sufficient to justify the harm and the costs, including the social costs,
of the intervention.
Article 13
SITING OF PROPOSED FACILITIES
1. Each Contracting Party shall take the appropriate steps to ensure
that procedures are established and implemented for a proposed radioactive
waste management facility:
(I) to evaluate all relevant site-related factors likely to affect the
safety of such a facility during its operating lifetime as well as that
of a disposal facility after closure;
(II) to evaluate the likely safety impact of such a facility on individuals,
society and the environment, taking into account possible evolution of
the site conditions of disposal facilities after closure;
(III) to make information on the safety of such a facility available
to members of the public;
(IV) to consuit Contracting Parties in the vicinity of such a facility,
insofar as they are likely to be affected by that facility, and provide
them, upon their request, with general data relating to the facility to
enable them to evaluate the likely safety impact of the facility upon their
territory.
2. In so doing, each Contracting Party shall take the appropriate steps
to ensure that such facilities shall not have unacceptable effects on other
Contracting Parties by being sited in accordance with the general safety
requirements of Article 11.
Article 14
DESIGN AND CONSTRUCTION OF FACILITIES
Each Contracting Party shall take the appropriate steps to ensure that:
(I) the design and construction of a radioactive waste management facility
provide for suitable measures to limit possible radiological impacts on
individuals, society and the environment, including those from discharges
or uncontrolled releases;
(II) at the design stage, conceptual plans and, as necessary, technical
provisions for the decommissioning of a radioactive waste management facility
other that a disposal facility are taken into account;
(III) at the design stage, technical provisions for the closure of a
disposal facility are prepared;
(IV) the technologies incorporated in the design and construction of
a radioactive waste management facility are supported by experience, testing
or analysis.
Article 15
ASSESSMENT OF SAFETY OF FACILITIES
Each Contracting Party shall take the appropriate steps to ensure that:
(I) before construction of a radioactive waste management facility,
a systematic safety assessment and an environmental assessment appropriate
to the hazard presented by the facility and covering its operating lifetime
shall be carried out;
(II) in addition, before construction of a disposal facility, a systematic
safety assessment and an environmental assessment for the period following
closure shall carried out and the results evaluated against the criteria
established by the regulatory body;
(III) before the operation of a radioactive waste management facility,
updated and detailed versions of the safety assesment and of the environmental
assessment shall be prepared when deemed necessary to complement the assessments
referred to in paragraph (I).
Article 16
OPERATION OF FACILITIES
Each Contracting Party shall take the appropriate steps to ensure that:
(I) the licence to operate a radioactive waste management facility is
based upon appropriate assessments as specified in Article 15 and is conditional
on the completion of a commissioning programme demonstrating that the facility,
as constructed, is consistent with design and safety requirements;
(II) operational limits and conditions, derived from tests, operational
experience and the assessments as specified in Article 15 are defined and
revised as necessary;
(III) operation, maintenance, monitoring, inspection and testing of
a radioactive waste management facility are conducted in accordance with
established procedures. For a disposal facility the results thus obtained
shall be used to verify and to review the validity of assumptions made
and to update the assessments as specified in Article 15 for the period
after closure;