HRVATSKI SABOR
67
Na temelju članka 89. Ustava Republike Hrvatske, donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU OKVIRNOG UGOVORA O ZAJMU IZMEĐU
REPUBLIKE HRVATSKE I RAZVOJNE BANKE VIJEĆA EUROPE ZA OBNOVU ŠKOLA
Proglašavam Zakon o potvrđivanju Okvirnog ugovora o zajmu između Republike Hrvatske i Razvojne banke Vijeća Europe za obnovu škola, koji je donio Hrvatski sabor na sjednici 31. svibnja 2001.
Broj: 01-081-01-1762/2
Zagreb, 6. lipnja 2001.
Predsjednik
Republike Hrvatske
Stjepan Mesić, v. r.
ZAKON
O POTVRĐIVANJU OKVIRNOG UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I RAZVOJNE
BANKE VIJEĆA EUROPE ZA OBNOVU ŠKOLA
Članak 1.
Potvrđuje se Okvirni ugovor o zajmu između Republike Hrvatske i Razvojne banke Vijeća Europe za obnovu škola potpisan 19. siječnja 2001. u Zagrebu i 26. siječnja 2001. u Parizu, u izvorniku na engleskom jeziku.
Članak 2.
Tekst Okvirnog ugovora o zajmu između Republike Hrvatske i Razvojne banke Vijeća Europe za obnovu škola u prijevodu na hrvatski jezik i u izvorniku na engleskom jeziku glasi:
F/P 1352 (1999)
Framework Loan Agreement
FRAMEWORK LOAN AGREEMENT BETWEEN
THE COUNCIL OF EUROPE DEVELOPMENT BANK
AND THE REPUBLIC OF CROATIA
The Council of Europe Development Bank, Paris, (hereinafter called the "CEB"),
And the Republic of Croatia (hereinafter called the "Borrower"), represented by the Ministry of Finance,
- Having regard to the application of the Republic of Croatia dated on September 10, 1999;
- Having regard to the Resolution of the Administrative Council of the CEB: 1424 (1997) Revised;
- Having regard to the Third Additional Protocol to the General Agreement on Privileges and Immunities of the Council of Europe;
- Having regard to the articles of the Loan Regulations of the CEB dated October 6, 1970.
HAVE AGREED UPON THE FOLLOWING:
Article 1
This loan is granted under the general conditions of the current Loan Regulations of the CEB and under the special conditions fixed by this agreement and its appendices.
Article 2: The Project
The CEB grants to the Borrower, who accepts, a loan for the partial financing of the F/P 1352 (1999) approved by the CEBžs Administrative Council on May 24 - 25, 2000, concerning the part-financing of the
reconstruction/repair and equipment of 41 school facilities in Croatia.
This loan is granted by the CEB in consideration of the commitment that the Borrower is making to apply it solely to financing the project described in Appendix 1, and to carry out such project under the conditions which
are detailed in the said Appendix.
Any change to the way the loan is applied that has not received the CEBžs approval may lead to the suspension, cancellation or immediate repayability of the loan, under the terms of Article 13 of the Loan Regulations.
Article 3: The Loan
3.1. Financial conditions
The amount of the loan granted is up to the equivalent of: HRK 98 682 000 (ninety eight million six hundred eighty two thousand Croatian kunas).
The loan shall be disbursed in several instalments.
Each instalment of the loan shall be for a period of no more than 15 years, with a 5-year grace period. The principal, interest rate, currency, duration and disbursement date for each instalment shall be decided by
mutual agreement between the Borrower and the CEB, by fax. The account to which the disbursements shall be paid shall be communicated in due time to the CEB by the Borrower. The interest rate for each loan instalment
will be subsidised through the CEBžs Selective Trust Account up to 50 basis points. This subsidy cannot exceed EUR 509 440 for the total amount of the project approved by the CEBžs Administrative Council. The subsidy
has been calculated with 50 basis points (0.50%) on the basis of a loan structure with a 10-year final maturity and 5-year grace period. However, in case the interest rate before subsidising would be below 0.5%, the
subsidy shall be equivalent to that interest rate.
3.2. Disbursement
A Supplementary Agreement to the present Framework Loan Agreement, specifying the details of each instalment, will be established between the Borrower and the CEB, for each instalment at the time of its disbursement
(Appendix 2).
3.3. Mobilisation
In order to mobilise the loan instalments, the Borrower shall send to the CEB in due time a Promissory Note corresponding to each instalment (Appendix 3A and 3B).
The Promissory Note is made out and payable in the currency of the instalment.
3.4. Domicile
All the sums due by the Borrower under this loan are payable to the CEB in the currency of each instalment to the bank and account number communicated to the Borrower by the CEB at the time of disbursement of each
instalment, with fax notice to be sent to the CEB by the bank charged the Borrower with payment, at least five working days before each payment.
3.5. Dates
Tthe provisions of Article 3 are subject to the agreement "Modified Following Business Day", the definition of which is to be found in Appendix 4 to the present agreement ("Business Day" in the
country of the currency). For disbursements in EURO, "Business Day" means the day on which the Trans-European Automated Real-Time Gross Settlement Express Transfer (TARGET) System is operating.
Article 4: Monitoring the loan and the project
4.1. Use of the loan
Each instalment must be used by the Borrower for financing the project within twelve months after its disbursement by the CEB.
4.2. Implementation of the project
The Borrower shall apply all care and diligence, and shall exercise all typically used means, in particular financial, technical, social, and managerial means and those concerning environmental protection, which shall be
necessary for the proper implementation of the project.
In particular, it shall ensure - before the project is implemented - that all the financing, land and real property rights which are necessary therefor are available and that all assets and installations are permanently
insured and maintained.
The Borrower shall undertake, moreover, that:
- the project complies with the relevant Council of Europe conventions;
- the project respects the environment, on the basis of relevant international conventions;
- partial financing by the CEB does not exceed 50% of the total cost of the project, excluding taxes, interest and financial charges;
- investments higher than the counter-value of 10 million EUR shall be subject to international calls for tender.
4.3. Borroweržs Reports
4.3.1. Project progress reports
At least twice a year, from the date of the first disbursement of the loan up until the completion of the entire project, the Borrower shall send to the CEB a report detailing:
- the state of use of the loan;
- the progress of the projectžs financing plan;
- the progress of the project itself;
- project management details.
Appendix 5 specifies the model monitoring sheets for the loan and the project that must - as a minimum - be included.
4.3.2. Project completion report
At the completion of the entire project, the Borrower shall ensure that the CEB obtains a final report, containing an appraisal of the projectžs economic, financial, social and environmental effects.
4.4. Information provision to the CEB
The Borrower shall keep accounting records, concerning the project, which shall be in conformity with international standards and which shall show, at any point, the projectžs state of progress, and which shall record
all operations made, and identify the assets and services financed with the help of the present loan.