HRVATSKI SABOR
110
Na temelju članka 88. Ustava Republike Hrvatske,
donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU
REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA FINANCIRANJE
PROJEKTA ZAŠTITE OD ONEČIŠĆENJA VODA U PRIOBALNOM PODRUČJU
Proglašavam Zakon o potvrđivanju Ugovora o zajmu
između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za
financiranje Projekta zaštite od onečišćenja voda u priobalnom području, koji
je donio Hrvatski sabor na sjednici 12. studenoga 2004. godine.
Broj; 01-081-04-3538/2
Zagreb, 16. studenoga 2004.
Predsjednik
Republike Hrvatske
Stjepan Mesić, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I
MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA FINANCIRANJE PROJEKTA ZAŠTITE OD ONEČIŠĆENJA
VODA U PRIOBALNOM PODRUČJU
Članak 1.
Potvrđuje se Ugovor o zajmu između Republike
Hrvatske i Međunarodne banke za obnovu i razvoj za financiranje Projekta zaštite
od onečišćenja voda u priobalnom području, potpisan 2. srpnja 2004. u Zadru, u
izvorniku na engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u
izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik glasi:
LOAN NUMBER 7226 HR
Loan
Agreement (Coastal Cities Pollution Control Project) between REPUBLIC OF
CROATIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND
DEVELOPMENT
LOAN AGREEMENT
AGREEMENT,
dated July 2, 2004, between REPUBLIC OF CROATIA (the Borrower) and
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (the Bank).
WHEREAS
(A) the Bank has received a letter from the Borrower, dated May 29, 2003,
describing a program designed to improve the provision of efficient and
sustainable sanitation services in the Borroweržs coastal cities and improve
coastal water quality along the Adriatic Coast (the Program) and declaring the
Borroweržs commitment to the execution of such Program; and
(B)
the Borrower has requested the Bank to support the execution of three phases of
the Program through a series of loans up to Euro 140,000,000 equivalent over a
period of approximately ten (10) years to be utilized by the Borrower in the
implementation of the Program; and
(C) the Borrower,
having satisfied itself as to the feasibility and priority of the project
described in Schedule 2 to this Agreement (the Project), has requested the Bank
to assist in the financing of the Project, which constitutes the first phase of
the Program;
(D) Parts A, B and C.2
of the Project will be carried out by Hrvatske vode (HV), through the Special
Purpose Subsidiary Company (SPSC), with the Borroweržs assistance and, as part
of such assistance, the Borrower will make the proceeds of the loan provided
for in Article II of this Agreement (the Loan) available to HV, as set forth in
this Agreement, and Part C.1 of the Project will be carried by the Borrower
through the Ministry of Environment (MoE); and
WHEREAS the Bank has
agreed, on the basis, inter alia, of the foregoing, to extend the Loan to the
Borrower upon the terms and conditions set forth in this Agreement and in the
agreement of even date herewith between the Bank and HV (the Project
Agreement);
NOW THEREFORE the
parties hereto hereby agree as follows:
Article I
General Conditions;
Definitions
Section 1.01. The »General
Conditions Applicable to Loan and Guarantee Agreements for Fixed-Spread Loans«
of the Bank, dated September 1, 1999 (the General Conditions) constitute an
integral part of this Agreement.
Section 1.02. Unless the
context otherwise requires, the several terms defined in the General
Conditions and in the Preamble to this Agreement have the respective meanings
therein set forth and the following additional terms have the following
meanings:
(a) »Financial Monitoring Report« or »FMR« means
each report prepared in accordance with Section 4.02 of this Agreement.
(b) »Project Agreement« means the agreement
between the Bank and HV of even date herewith, as the same may be amended from
time to time; and such term includes all schedules and agreements supplemental
to the Project Agreement.
(c) »Special
Account« means the account referred to in Section 2.02 (b) of this Agreement.
(d) »Subsidiary
Loan Agreement« means the agreement to be entered into between the Borrower and
HV pursuant to Section 3.01(b) of this Agreement, as the same may be amended
from time to time; and such term includes all schedules to the Subsidiary Loan
Agreement;
(e) »Hrvatske
vode« or »HV« means the state agency of the Borrower responsible for national
water resource management, established pursuant to the Water Act of 1995
(Official Gazette No. 107/95);
(f) »SPSC« means
the Special Purpose Subsidiary Company of HV to be established pursuant to
Section 6.01(b) of this Agreement and which will be responsible for
implementation of Sub-projects, under Part A of the Project for the benefit of
MWSCs and of Parts B and C.2 for the benefit of HV;
(g) »MWSC« means
Municipal Water and Sewerage Company duly established under the Borroweržs laws
and eligible, in accordance with the criteria set forth in the Operational
Manual, for receiving a Sub-project Loan to be financed from the Loan proceeds
under Part A of the Project;
(h) »Sub-project« means an investment project
eligible, in accordance with the criteria set forth in the Operational Manual,
for financing from the Loan proceeds under Part A of the Project;
(i) »Sub-project Loan« means a loan to be
provided to an eligible MWSC from the proceeds of the Loan for financing a
Sub-project under Part A of the Project;
(j) »Operational Manual« means a manual adopted
by HV setting forth eligibility criteria for participating MWSCs and
Sub-projects, the procedures for selecting, appraising, approving and
supervising of Sub-projects, and the terms and conditions of Sub-project Loans;
and
(k) »MoE« means the Borroweržs Ministry of
Environmental Protection and Physical Planning and Construction, or any legal
successor thereto.
Section 1.03. Each reference
in the General Conditions to the Project implementation entity shall be deemed
as a reference to HV.
Article II
The Loan
Section
2.01. The Bank agrees to lend to the Borrower, on the
terms and conditions set forth or referred to in the Loan Agreement, an amount
equal to forty million Euro (Euro 40,000,000), as such amount may be converted
from time to time through a Currency Conversion in accordance with the
provisions of Section 2.09 of this Agreement.
Section
2.02. (a) The amount of the Loan may be withdrawn
from the Loan Account in accordance with the provisions of Schedule 1 to this
Agreement for expenditures made (or, if the Bank shall so agree, to be made) in
respect of the reasonable cost of goods, works and services required for the
Project and to be financed out of the proceeds of the Loan, and any premium in
respect of an Interest Cap or Interest Rate Collar payable by the Borrower in
accordance with Section 4.04(c) of General Conditions.
(b) The Borrower may, for the purposes of the
Project, open and maintain in Euro a special deposit account in a commercial
bank on terms and conditions satisfactory to the Bank, including appropriate
protection against set-off, seizure and attachment. Deposits into, and payments
out of, the Special Account shall be made in accordance with the provisions of
Schedule 5 to this Agreement.
Section 2.03. The Closing
Date shall be November 30, 2008 or such later date as the Bank shall establish.
The Bank shall promptly notify the Borrower of such later date.
Section 2.04. The Borrower
shall pay to the Bank a front-end fee in an amount equal to one percent (1%) of
the amount of the Loan on or promptly after the Effective Date.
Section 2.05. The Borrower shall pay to the Bank
a commitment charge on the principal amount of the Loan not withdrawn from time
to time, at a rate equal to: (i) eighty-five one-hundredths of one per cent
(0.85%) from the date on which such charge commences to accrue in accordance
with the provisions of Section 3.02 of the General Conditions to but not
including the fourth anniversary of such date; and (ii) seventy-five
one-hundredths of one per cent (0.75%) thereafter.
Section 2.06. The Borrower
shall pay interest on the principal amount of the Loan withdrawn and
outstanding from time to time, at a rate for each Interest Period equal to the
Variable Rate; provided, that upon a Conversion of all or any portion of the
principal amount of the Loan, the Borrower shall, during the Conversion Period,
pay interest on such amount in accordance with the relevant provisions of
Article IV of the General Conditions.
Section 2.07. Interest,
commitment and other charges shall be payable semiannually in arrears on April
15 and October 15 in each year.
Section 2.08. The Borrower
shall repay the principal amount of the Loan in accordance with the provisions
of Schedule 3 to this Agreement.
Section 2.09. (a) The
Borrower may at any time request any of the following Conversions of the terms
of the Loan in order to facilitate prudent debt management:
(i) a change of the Loan Currency of all or any
portion of the principal amount of the Loan, withdrawn or unwithdrawn, to an
Approved Currency;
(ii) a change of the interest rate basis
applicable to all or any portion of the principal amount of the Loan from a
Variable Rate to a Fixed Rate, or vice versa; and
(iii) the setting of limits on the Variable Rate
applicable to all or any portion of the principal amount of the Loan withdrawn
and outstanding by the establishment of an Interest Rate Cap or Interest Rate
Collar on said Variable Rate.
(b) Any conversion requested pursuant to
paragraph (a) of this Section that is accepted by the Bank shall be considered
a »Conversion«, as defined in Section 2.01 (7) of the General Conditions, and
shall be effected in accordance with the provisions of Article IV of the
General Conditions and of the Conversion Guidelines.
(c) Promptly after the Execution Date for an
Interest Rate Cap or Interest Rate Collar in respect of which the Borrower has
requested that the premium be paid out of the proceeds of the Loan, the Bank
shall, on behalf of the Borrower, withdraw from the Loan Account and pay to
itself that amounts required to pay any premium payable in accordance with
Section 4.04(c) of the General Conditions up to the amount allocated from time
to time for such purpose in the table in paragraph 1 of Schedule 1 to this
Agreement.
Article III
Execution of the
Project
Section
3.01. (a) The Borrower declares its commitment to the
objectives of the Project, and, to this end, without any limitation or
restriction upon any of its other obligations under the Loan Agreement, shall
cause HV to perform in accordance with the provisions of the Project Agreement
all the obligations therein set forth, shall take or cause to be taken all
actions, including the provision of funds, facilities, services and other
resources, necessary or appropriate to perform such obligations, and shall not
take or permit to be taken any action which would prevent or interfere with
such performance.
(b) Without
limitation upon the provisions of paragraph (a) of this Section and except as
the Borrower and the Bank shall otherwise agree, the Borrower shall cause HV to
carry out the Project in accordance with the Implementation Program set forth
in Schedule 4 to this Agreement.
(c) For the
purpose of implementing Parts A, B, and C.2, the Borrower shall relend the
proceeds of the Loan to HV, allocated from time to time to categories (1), (2)
and (3) in the table in paragraph 1 of Schedule 1 to this Agreement (Subsidiary
Loan), under a Subsidiary Loan Agreement to be entered into between the
Borrower and HV under terms and conditions which shall have been approved by
the Bank and which shall include inter alia, the following conditions:
(i) the
Subsidiary Loan shall be denominated in Euro;
(ii) the
Subsidiary Loan shall be charged semi-annually, on the principal amount thereof
withdrawn and outstanding from time to time, interest at a rate equal to the
rate payable under Section 2.06 of this Agreement;
(iii) the
Subsidiary Loan shall be repaid with an amortization schedule calculated to
have a maturity of not more than fifteen (15) years, including a grace period
of not more than five (5) years.
(d) The Borrower shall exercise its rights under
the Subsidiary Loan Agreement in such manner as to protect the interests of the
Borrower and the Bank and to accomplish the purposes of the Loan, and, except
as the Bank shall otherwise agree, the Borrower shall not assign, amend,
abrogate or waive the Subsidiary Loan Agreement or any provision thereof.
Section
3.02. Except as the Bank shall otherwise agree,
procurement of the goods, works and consultantsž services required for the
Project and to be financed out of the proceeds of the Loan shall be governed by
the provisions of Schedule 1 to the Project Agreement.
Section
3.03. The Bank and the Borrower hereby agree that the
obligations set forth in Sections 9.04, 9.05, 9.06, 9.07, 9.08 and 9.09 of the
General Conditions (relating to insurance, use of goods and services, plans and
schedules, records and reports, maintenance and land acquisition, respectively)
shall be carried out by HV, through SPSC, pursuant to Section 2.03 of the
Project Agreement.
Article IV
Financial Covenants
Section 4.01. (a)
The Borrower shall and shall cause HV, through SPSC, to maintain financial
management systems, including records and accounts, and prepare financial
statements in accordance with consistently applied accounting standards,
acceptable to the Bank, adequate to reflect the operations, resources and
expenditures related to the Project.
(b) The Borrower
shall:
(i) commencing
with the fiscal year in which the Effective Date falls, to and including the
fiscal year in which the last withdrawal from the Loan is made, have the
financial statements referred to in paragraph (a) of this Section for each
fiscal year audited, in accordance with consistently applied auditing standards
acceptable to the Bank, by independent auditors acceptable to the Bank;
(ii) furnish to
the Bank as soon as available, but in any case not later than six (6) months
after the end of each such year or such other period agreed to by the Bank, (A)
certified copies of the financial statements referred to in paragraph (a) of
this Section for such year or such other period agreed to by the Bank, as so
audited, and (B) an opinion on such statements by said auditors, in scope and
detail satisfactory to the Bank; and
(iii) furnish to
the Bank such other information concerning such records and accounts, and the
audit of such financial statements, and concerning said auditors, as the Bank
may from time to time reasonably request.
(c) For all
expenditures with respect to which withdrawals from the Loan Account were made
on the basis of statements of expenditure, the Borrower shall:
(i) retain,
until at least one year after the Bank has received the audit report for, or
covering, the fiscal year in which the last withdrawal from the Loan Account
was made, all records (contracts, orders, invoices, bills, receipts and other
documents) evidencing such expenditures;
(ii) enable the
Bankžs representatives to examine such records; and
(iii) ensure
that such reports and statements of expenditures are included in the audit for
each fiscal year or other period agreed to by the Bank, referred to in
paragraph (b) of this Section.
Section
4.02. (a) Without limitation upon the Borroweržs progress
reporting obligations set out in Schedule 5 to this Agreement, the Borrower
shall prepare and furnish to the Bank a Financial Monitoring Report (FMR), in
form and substance satisfactory to the Bank, which:
(i) sets forth
sources and uses of funds for the Project, both cumulatively and for the period
covered by said report, showing separately funds provided under the Loan and
explains variances between the actual and planned uses of such funds;
(ii) describes
physical progress in Project implementation, both cumulatively and for the
period covered by said report, and explains variances between the actual and
planned Project implementation; and
(iii) sets forth
the status of procurement under the Project, as at the end of the period
covered by said report.
(b) The first
FMR shall be furnished to the Bank not later than 45 days after the end of the
first calendar quarter after the Effective Date, and shall cover the period
from the incurrence of the first expenditure under the Project through the end
of such first calendar quarter; thereafter, each FMR shall be furnished to the
Bank not later than 45 days after each subsequent calendar quarter, and shall
cover such calendar quarter.
Article V
Remedies of the Bank
Section 5.01. Pursuant to
Section 6.02(p) of the General Conditions, the following additional events,
which may give the right to the Bank to suspend withdrawals from the Loan
Account, are specified:
(a) HV shall
have failed to perform any of its obligations under the Project Agreement;
(b) As a result
of events which have occurred after the date of the Loan Agreement, an
extraordinary situation shall have arisen which shall make it improbable that
HV will be able to perform its obligations under the Project Agreement; and
(c) The Water
Act of 1995 (Official Gazette No. 107/95) shall have been amended, suspended,
abrogated, repealed or waived so as to affect materially and adversely the
ability of HV to perform any of its obligations under the Project Agreement.
Section
5.02. Pursuant to Section 7.01(k) of the General
Conditions, the following additional events are specified:
(a) The event
specified in paragraph (a) of Section 5.01 of this Agreement shall occur and
shall continue for a period of sixty (60) days after notice thereof shall have
been given by the Bank to the Borrower; and
(b) Any event
specified in paragraphs (b) and (c) of Section 5.01 of this Agreement shall
occur.
Article VI
Effective Date;
Termination
Section
6.01. The following events are specified as
additional conditions to the effectiveness of the Loan Agreement within the
meaning of Section 12.01(c) of the General Conditions:
a) that the
Subsidiary Loan Agreement has been executed on behalf of the Borrower and HV;
b) SPSC has been
established in accordance with applicable laws of the Borrower; and
c) the
Accounting Manual of Procedures has been adopted by SPSC and a satisfactory
financial management system has been established within SPSC.
Section 6.02. The following
are specified as additional matters, within the meaning of Section 12.02(c) of
the General Conditions, to be included in the opinion or opinions to be
furnished to the Bank:
(a) that the
Project Agreement has been duly authorized or ratified by HV, and is legally
binding upon HV in accordance with its terms; and
(b) that the
Subsidiary Loan Agreement has been duly authorized or ratified by the Borrower
and HV and is legally binding upon the Borrower and HV in accordance with its
terms.
Section
6.03. The date one-hundred twenty (120) days after
the date of the signing of this Agreement is hereby specified for the purposes
of Section 12.04 of the General Conditions.
Article VII
Representative of the
Borrower; Addresses
Section 7.01. The Minister of
Finance of the Borrower is designated as representative of the Borrower for the
purposes of Section 11.03 of the General Conditions.
Section
7.02. The following addresses are specified for the
purposes of Section 11.01 of the General Conditions:
For
the Borrower:
Ministry of Finance
Katančićeva 5
Zagreb 10000
Republic of Croatia
Telex: Facsimile:
862-21215 (385-1) 4922-598
862-21833
For
the Bank:
International Bank for
Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America
Cable address: Telex: Facsimile:
INTBAFRAD 248423 (MCI) or (202) 477-6391
Washington, D.C. 64145 (MCI)
IN WITNESS WHEREOF, the parties hereto, acting
through their duly authorized representatives, have caused this Agreement to be
signed in their respective names in Zagreb, Croatia as of the day and year
first above written.
REPUBLIC OF CROATIA
By Ivan Šuker
Authorized Representative
SCHEDULE 1
Withdrawal of the
Proceeds of the Loan
1.
The table below sets forth the Categories of
items to be financed out of the proceeds of the Loan, the allocation of the
amounts of the Loan to each Category and the percentage of expenditures for
items so to be financed in each Category:
Amount
of the % of Expenditures
Category Loan
Allocated to be financed
Expressed in Euro
(1)Works 28,500,000 50%
(2)Goods 5,100,000 50%
(3) Consultantsž services
and training 3,400,000 50%
(4)Premia for Interest Amount due under
Rate Caps and – Section 2.09 (c)
Interest Rate Collars of this Agreement
(5) Unallocated 3,000,000
TOTAL 40,000,000
2. Notwithstanding the provisions of paragraph 1
above, no withdrawals shall be made in respect of: (a) payments made for
expenditures prior to the date of this Agreement, except that withdrawals, in
an amount not exceeding EUR 4,000,000 may be made on account of payments made
for expenditures under Categories (1), (2) and (3) before that date but after
September 1, 2003; and (b) any expenditures under any Category in the table in
paragraph 1 above unless the Bank has received payment in full of the front-end
fee referred to in Section 2.04 of this Agreement.
3. The Bank may
require withdrawals from the Loan Account to be made on the basis of statements
of expenditure for expenditures under contracts for: (a) goods costing less
than Euro 500,000 equivalent per contract, with the exception of the first
contracts procured in accordance with the provisions of Part C.1 and C.2 of
Section I of Schedule 1 to the Project Agreement; (b) works costing less than
Euro 1,000,000 equivalent per contract, except for the first contracts procured
in accordance with the provisions of Part C.1 and C.3 of Section I of Schedule
I to the Project Agreement; (c) for services of individual consultants costing
less than Euro 50,000 equivalent per contract; and (d) for services of
consulting firms under contracts costing less than Euro 100,000 equivalent per
contract, under such terms and conditions as the Bank shall specify by notice
to the Borrower.
SCHEDULE
2
Description of the
Project
The objective of the Project is to improve the
quality of the Borroweržs Adriatic coastal waters through: (a) supporting the
strengthening of the institutional arrangements for financing and management of
wastewater management in Croatia; and (b) financing of wastewater collection,
treatment and disposal infrastructure in selected coastal municipalities.
The Project
consists of the following parts, subject to such modifications thereof as the
Borrower and the Bank may agree upon from time to time to achieve such
objectives:
Part A:
Coastal Environmental Infrastructure
Investments
Financing and carrying out of Sub-projects for
construction and expansion of sewerage networks and for construction,
rehabilitation and expansion of main collectors, pumping stations, wastewater
treatment facilities and submarine outfalls in selected MWSCs.
Part B:
Institutional Strengthening
and Program Management
1. Design and implementation of an institutional
framework for water pollution control.
2. Completion of engineering designs and
environmental and social assessments for investments after the first phase of
the Program and supervision of investments financed under Sub-projects.
3. Strengthening SPSCžs capacity for Project
implementation, including evaluation, monitoring and financial management.
4. Strengthening management, operational
efficiency and financial viability of MWSCs.
Part C:
Strengthening of the Coastal Waters
Monitoring Network
1. Improving the capacity of the MoE network of
laboratories for environmental monitoring to assess Program impact on coastal
waters quality.
2. Improving the capacity of HVžs laboratories
to assess individual discharges of municipalities and industries, to determine
the overall pollutants load contributed by the Borrower to the Adriatic sea and
evaluate and control the efficiency of the financed infrastructure.
* * *
The Project is expected to be completed by May
31, 2008.
SCHEDULE
3
Amortization Schedule
1. The following table
sets forth the Principal Payment Dates of the Loan and the percentage of the
total principal amount of the Loan payable on each Principal Payment Date
(Installment Share). If the proceeds of the Loan shall have been fully
withdrawn as of the first Principal Payment Date, the principal amount of the
Loan repayable by the Borrower on each Principal Payment Date shall be
determined by the Bank by multiplying: (a) the total principal amount of the
Loan withdrawn and outstanding as of the first Principal Payment Date; by (b)
the Installment Share for each Principal Payment Date, such repayment amount to
be adjusted, as necessary, to deduct any amounts referred to in paragraph 4 of
this Schedule, to which a Currency Conversion applies.
Installment Share
Payment Date (Expressed as a %)
On each April 15th and
October 15th
beginning October 15, 2009 through 5%
April 15, 2019
2. If the proceeds of the Loan shall not have
been fully withdrawn as of the first Principal Payment Date, the principal
amount of the Loan repayable by the Borrower on each Principal Payment Date
shall be determined as follows:
(a) To the extent that any proceeds of the Loan
shall have been withdrawn as of the first Principal Payment Date, the Borrower
shall repay the amount withdrawn and outstanding as of such date in accordance
with paragraph 1 of this Schedule.
(b) Any withdrawal made after the first Principal
Payment Date shall be repaid on each Principal Payment Date falling after the
date of such withdrawal in amounts determined by the Bank by multiplying the
amount of each such withdrawal by a fraction, the numerator of which shall be
the original Installment Share specified in the table in paragraph 1 of this
Schedule for said Principal Payment Date (the Original Installment Share) and
the denominator of which shall be the sum of all remaining Original Installment
Shares for Principal Payment Dates falling on or after such date, such
repayment amounts to be adjusted, as necessary, to deduct any amounts referred
to in paragraph 4 of this Schedule, to which a Currency Conversion applies.
3. (a) Withdrawals made within two calendar
months prior to any Principal Payment Date shall, for the purposes solely of
calculating the principal amounts payable on any Principal Payment Date, be
treated as withdrawn and outstanding on the second Principal Payment Date
following the date of withdrawal and shall be repayable on each Principal
Payment Date commencing with the second Principal Payment Date following the
date of withdrawal.
(b) Notwithstanding the provisions of
sub-paragraph (a) of this paragraph 3, if at any time the Bank shall adopt a
due date billing system under which invoices are issued on or after the
respective Principal Payment Date, the provisions of such sub-paragraph shall
no longer apply to any withdrawals made after the adoption of such billing
system.
4.
Notwithstanding the provisions of paragraphs 1 and 2 of this Schedule, upon a
Currency Conversion of all or any portion of the withdrawn principal amount of
the Loan to an Approved Currency, the amount so converted in said Approved
Currency that shall be repayable on any Principal Payment Date occurring during
the Conversion Period, shall be determined by the Bank by multiplying such
amount in its currency of denomination immediately prior to said Conversion by
either: (i) the exchange rate that reflects the amounts of principal in said
Approved Currency payable by the Bank under the Currency Hedge Transaction
relating to said Conversion; or (ii) if the Bank so determines in accordance
with the Conversion Guidelines, the exchange rate component of the Screen Rate.
5. If the principal amount of the Loan withdrawn
and outstanding from time to time shall be denominated in more than one Loan
Currency, the provisions of this Schedule shall apply separately to the amount
denominated in each Loan Currency, so as to produce a separate amortization
schedule for each such amount.
SCHEDULE
4
Implementation Program
1. The Borrower shall delegate to HV the
responsibility for implementation of Parts A, B and C.2 of the Project, and to
MoE for the implementation of Part C.1 of the Project.
2. The Borrower:
(a) shall cause HV, through SPSC, to implement Parts A, B and C.2 of the
Project in accordance with the provisions agreed with the Bank and set forth in
the Operational Manual; and (b) shall not assign, amend, abrogate or waive the
Operational Manual or any provisions thereof, without the Bankžs prior
concurrence.
3. The Borrower
shall and shall cause HV, through SPSC, to:
(a)
maintain policies and procedures adequate to enable them to monitor and
evaluate on an ongoing basis, in accordance with indicators acceptable to the
Bank, the carrying out of the Project and the achievement of the objectives
thereof;
(b) prepare, under terms of reference
satisfactory to the Bank, and furnish to the Bank, on or about September 1,
2005, a report integrating the results of the monitoring and evaluation
activities performed pursuant to sub-paragraph (a) of this paragraph, on the
progress achieved in the carrying out of the Project during the period
preceding the date of said report and setting out the measures recommended to ensure
the efficient carrying out of the Project and the achievement of the objectives
thereof during the period following such date; and
(c) review with the Bank, by January 1, 2006, or
such later date as the Bank shall request, the report referred to in sub-paragraph
(b) of this paragraph, and, thereafter, take all measures required to ensure
the efficient completion of the Project and the achievement of the objectives
thereof, based on the conclusions and recommendations of the said report and
the Bankžs views on the matter.
SCHEDULE
5
Special Account
1. For the purposes of this Schedule:
(a) the term »eligible Categories« means
Categories (1) through (3) set forth in the table in paragraph 1 of
Schedule 1 to this Agreement.
(b) the term »eligible expenditures« means
expenditures in respect of the reasonable cost of goods, works and services
required for the Project and to be financed out of the proceeds of the Loan
allocated from time to time to the eligible Categories in accordance with the
provisions of Schedule 1 to this Agreement; and
(c) the term »Authorized Allocation« means the
amount of Euro 1,500,000 equivalent in respect of the Special Account to be
withdrawn from the Loan Account and deposited into the Special Account pursuant
to paragraph 3 (a) of this Schedule, provided, however, that unless the Bank
shall otherwise agree, the Authorized Allocation shall be limited to the amount
of Euro 500,000 equivalent until the aggregate amount of withdrawals from the
Loan Account plus the total amount of all outstanding special commitments
entered into by the Bank pursuant to Section 5.02 of the General Conditions
shall be equal to or exceed the equivalent of Euro 2,000,000.
2. Payments out
of the Special Account shall be made exclusively for eligible expenditures in
accordance with the provisions of this Schedule.
3. After the
Bank has received evidence satisfactory to it that the Special Account has been
duly opened, withdrawals of the Authorized Allocation and subsequent
withdrawals to replenish the Special Account shall be made as follows:
(a) For
withdrawals of the Authorized Allocation, the Borrower shall furnish to the
Bank a request or requests for deposit into the Special Account of an amount or
amounts which do not exceed the aggregate amount of the Authorized Allocation.
On the basis of such request or requests, the Bank shall, on behalf of the
Borrower, withdraw from the Loan Account and deposit into the Special Account
such amount or amounts as the Borrower shall have requested.
(b) (i) For
replenishment of the Special Account, the Borrower shall furnish to the Bank
requests for deposits into the Special Account at such intervals as the Bank
shall specify.
(ii) Prior to or
at the time of each such request, the Borrower shall furnish to the Bank the
documents and other evidence required pursuant to paragraph 4 of this
Schedule for the payment or payments in respect of which replenishment is
requested. On the basis of each such request, the Bank shall, on behalf of the
Borrower, withdraw from the Loan Account and deposit into the Special Account
such amount as the Borrower shall have requested and as shall have been shown
by said documents and other evidence to have been paid out of the Special
Account for eligible expenditures. All such deposits shall be withdrawn by the
Bank from the Loan Account under the respective eligible Categories, and in the
respective equivalent amounts, as shall have been justified by said documents
and other evidence.