HRVATSKI SABOR
11
Na temelju članka 88. Ustava Republike Hrvatske,
donosim
ODLUKU
O PROGLAŠENJU ZAKONA O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU
REPUBLIKE HRVATSKE I MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT SREĐIVANJA
ZEMLJIŠNIH KNJIGA I KATASTRA
Proglašavam Zakon o potvrđivanju Ugovora o zajmu
između Republike Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt sređivanja
zemljišnih knjiga i katastra, koji je donio Hrvatski sabor na sjednici 23. siječnja
2003.
Broj: 01-081-03-298/2
Zagreb, 28. siječnja 2003.
Predsjednik
Republike Hrvatske
Stjepan Mesić, v. r.
ZAKON
O POTVRĐIVANJU UGOVORA O ZAJMU IZMEĐU REPUBLIKE HRVATSKE I
MEĐUNARODNE BANKE ZA OBNOVU I RAZVOJ ZA PROJEKT SREĐIVANJA ZEMLJIŠNIH KNJIGA I
KATASTRA
Članak 1.
Potvrđuje se Ugovor o zajmu između Republike
Hrvatske i Međunarodne banke za obnovu i razvoj za Projekt sređivanja zemljišnih
knjiga i katastra, potpisan 18. rujna 2002. u Zagrebu, u izvorniku na
engleskom jeziku.
Članak 2.
Tekst Ugovora iz članka 1. ovoga Zakona, u
izvorniku na engleskom jeziku i u prijevodu na hrvatski jezik glasi:
LOAN
AGREEMENT
Agreement,
dated September 18, 2002, between REPUBLIC OF CROATIA (the Borrower) and
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (the Bank).
Whereas
(A) the Borrower, having satisfied itself as to the
feasibility and priority of the Project described in Schedule 2 to this
Agreement, has requested the Bank to assist in the financing of the Project;
and
(B) the Borrower intends to obtain from the European Union
(the EU) a grant in an amount equivalent to Euro 5,000,000 to assist in
carrying the Project on the terms and conditions set forth in the agreement to
be entered into between the Borrower and the EU (the EU Grant Agreement); and
Whereas the Bank has agreed, on the basis, inter alia, of
the foregoing, to extend the Loan to the Borrower upon the terms and conditions
set forth in this Agreement;
Now therefore the parties hereto hereby agree as follows:
Article I
General Conditions; Definitions
Section 1.01. The »General Conditions Applicable
to Loan and Guarantee Agreements for Single Currency Loans« of the Bank, dated
May 30, 1995 (as amended through October 6, 1999) (the General Conditions)
constitute an integral part of this Agreement.
Section 1.02. Unless
the context otherwise requires, the several terms defined in the General
Conditions and in the Preamble to this Agreement have the respective meanings
therein set forth and the following additional terms have the following
meanings:
(a) »Financial Monitoring
Report« means each report prepared in accordance with Section 4.02 of this
Agreement;
(b) »LRMU« means a Land
Registration Management Unit established within the MOJ pursuant to the Decree
No. 4/2002 on Amendments to the Decree on the Structure of the Ministry of
Justice, Administration and Local Self-Governance;
(c) »MOJ« means the
Borrower’s Ministry of Justice, Administration and Local Self-Governance, or
any legal successor thereto;
(d) »PIU« means the
Project Implementation Unit referred to in paragraph 1 (b) of Schedule 5 to
this Agreement;
(e) »SGA« means the
State Geodetic Administration under the Borrower’s Ministry of Environmental
Protection and Physical Planning, or any legal successor thereto; and
(f) »Special Account«
means the account referred to in Section 2.02(b) of this Agreement.
Article II
The Loan
Section 2.01. The Bank agrees to lend to the
Borrower, on the terms and conditions set forth or referred to in the Loan
Agreement an amount equal to twenty-six million Euro (EUR 26,000,000).
Section 2.02. (a) The
amount of the Loan may be withdrawn from the Loan Account in accordance with
the provisions of Schedule 1 to this Agreement for expenditures made (or, if
the Bank shall so agree, to be made) in respect of the reasonable cost of
goods, works and services required for the Project and to be financed out of
the proceeds of the Loan and in respect of the fee referred to in Section 2.04
of this Agreement.
(b) The Borrower may,
for the purposes of the Project, open and maintain in Euro a special deposit
account in a commercial bank and on terms and conditions satisfactory to the
Bank, including appropriate protection against set-off, seizure and attachment.
Deposits into, and payments out of, the Special Account shall be made in accordance
with the provisions of Schedule 6 to this Agreement.
Section 2.03. The
Closing Date shall be September 30, 2008, or such later date as the Bank shall
establish. The Bank shall promptly notify the Borrower of such later date.
Section 2.04. The
Borrower shall pay to the Bank a fee in an amount equal to one percent (1%) of
the amount of the Loan. On or promptly after the effective date, the Bank
shall, on behalf of the Borrower, withdraw from the Loan Account and pay to
itself the amount of said fee.
Section 2.05. The
Borrower shall pay to the Bank a commitment charge at the rate of three-fourths
of one percent (3/4 of 1%) per annum on the principal amount of the Loan not
withdrawn from time to time.
Section 2.06. (a) The
Borrower shall pay interest on the principal amount of the Loan withdrawn and
outstanding from time to time, at a rate for each Interest Period equal to
LIBOR Base Rate plus LIBOR Total Spread.
(b) For the purposes of
this Section:
(i) »Interest Period«
means the initial period from and including the date of this Agreement to, but
excluding, the first Interest Payment Date occurring thereafter, and after the
initial period, each period from and including an Interest Payment Date to, but
excluding the next following Interest Payment Date.
(ii) »Interest Payment
Date« means any date specified in Section 2.07 of this Agreement.
(iii) »LIBOR Base Rate«
means for each Interest Period, the London interbank offered rate for six-month
deposits in Euro for value the first day of such Interest Period (or, in the
case of the initial Interest Period, for value the Interest Payment Date
occurring on or next preceding the first day of such Interest Period), as
reasonably determined by the Bank and expressed as a percentage per annum.
(iv) »LIBOR Total
Spread« means, for each interest Period: (A) three fourths of one percent (3/4
of 1%); (B) minus (or plus) the weighted average margin for such Interest
Period below (or above) the London interbank offered rates, or other reference
rates for six-month deposits, in respect of the Bank’s outstanding borrowings
or portions thereof allocated by the Bank to fund single currency loans or
portions thereof made by it that include the Loan as reasonably determined by
the Bank and expressed as a percentage per annum.
(c) The Bank shall
notify the Borrower of LIBOR Base Rate and LIBOR Total Spread for each Interest
Period, promptly upon the determination thereof.
(d) Whenever, in light
of changes in market practice affecting the determination of the interest rates
referred to in this Section 2.06, the Bank determines that it is in the
interest of its borrowers as a whole and of the Bank to apply a basis for
determining the interest rates applicable to the Loan other than as provided in
said Section, the Bank may modify the basis for determining the interest rates
applicable to said Loan upon not less than six (6) months’ notice to the
Borrower of the new basis. The new basis shall become effective on the expiry
of the notice period unless the Borrower notifies the Bank during said period
of its objection thereto, in which case said modification shall not apply to
said Loan.
Section 2.07. Interest
and other charges shall be payable semiannually in arrears on May 15 and
November 15 in each year.
Section 2.08. The
Borrower shall repay the principal amount of the Loan in accordance with the
amortization schedule set forth in Schedule 3 to this Agreement.
Article III
Execution of the Project
Section 3.01. (a) The
Borrower declares its commitment to the objectives of the Project, and, to this
end, shall carry out the Project with due diligence and efficiency and in
conformity with appropriate administrative and financial practices, and shall
provide, promptly as needed, the funds, facilities, services and other
resources required for the Project.
(b) Without limitation upon the provisions of
paragraph (a) of this Section and except as the Borrower and the Bank shall
otherwise agree, the Borrower shall carry out the Project in accordance with
the Implementation Program set forth in Schedule 5 to this Agreement.
Section 3.02. Except as
the Bank shall otherwise agree, procurement of the goods, works, technical
services and consultants’ services required for the Project and to be financed
out of the proceeds of the Loan shall be governed by the provisions of Schedule
4 to this Agreement.
Section 3.03. For the
purposes of Section 9.07 of the General Conditions and without limitation
thereto, the Borrower shall:
(a) prepare, on the
basis of guidelines acceptable to the Bank, and furnish to the Bank not later
than six (6) months before the Closing Date or such later date as may be agreed
for this purpose between the Borrower and the Bank, a plan for the future
operation of the Project; and
(b) afford the Bank a
reasonable opportunity to exchange views with the Borrower on said plan.
Article IV
Financial Covenants
Section 4.01. (a) The Borrower shall maintain a
financial management system, including records and accounts, and prepare
financial statements in a format acceptable to the Bank, adequate to reflect
the operations, resources and expenditures related to the Project.
(b) The Borrower shall:
(i) have the records,
accounts and financial statements referred to in paragraph (a) of this Section
and the records and accounts for the Special Accounts for each fiscal year
audited, in accordance with auditing standards acceptable to the Bank,
consistently applied, by independent auditors acceptable to the Bank;
(ii) furnish to the
Bank as soon as available, but in any case not later than six (6) months after
the end of each such year, (A) certified copies of the financial statements
referred to in paragraph (a) of this Section for such year as so audited, and
(B) an opinion on such statements, records and accounts and report of such
audit, by said auditors, of such scope and in such detail as the Bank shall
have reasonably requested; and
(iii) furnish to the
Bank such other information concerning such records and accounts, and the audit
thereof, and concerning said auditors, as the Bank may from time to time
reasonably request.
(c) For all
expenditures with respect to which withdrawals from the Loan Account were made
on the basis of Financial Monitoring Reports or statements of expenditure, the
Borrower shall:
(i) maintain or cause
to be maintained, in accordance with paragraph (a) of this Section, records and
separate accounts reflecting such expenditures;
(ii) retain, until at
least one (1) year after the Bank has received the audit report for the fiscal
year in which the last withdrawal from the Loan Account was made, all records
(contracts, orders, invoices, bills, receipts and other documents) evidencing
such expenditures;
(iii) enable the Bank’s
representatives to examine such records; and
(iv) ensure that such
records and accounts are included in the annual audit referred to in paragraph
(b) of this Section and that the report of such audit contains a separate
opinion by said auditors as to whether the statements of expenditure submitted during
such fiscal year, together with the procedures and internal controls involved
in their preparation, can be relied upon to support the related withdrawals.
Section 4.02. (a)
Without limitation upon the Borrower’s progress reporting obligations set out in
Schedule 5 to this Agreement, the Borrower shall prepare and furnish to the
Bank a Financial Monitoring Report (FMR), in form and substance satisfactory to
the Bank, which:
(i) sets forth sources
and uses of funds for the Project, both cumulatively and for the period covered
by said report, showing separately funds provided under the loan, and explains
variances between the actual and planned uses of such funds;
(ii) describes physical
progress in Project implementation, both cumulatively and for the period
covered by said report, and explains variances between the actual and planned
Project implementation; and
(iii) sets forth the
status of procurement under the Project, as at the end of the period covered by
said report.
(b) The first FMR shall
be furnished to the Bank not later than forty-five (45) days after the end of
the first calendar quarter after the Effective Date, and shall cover the period
from the incurrence of the first expenditure under the Project through the end
of such first calendar quarter; thereafter, each FMR shall be furnished to the
Bank not later than 45 days after each subsequent calendar quarter, and shall
cover such calendar quarter.
Article V
Remedies of the Bank
Section 5.01. Pursuant to Section 6.02(p) of the
General Conditions, the following additional event is specified:
(a) The EU Grant
Agreement shall have failed to become effective by June 30, 2003, or such later
date as the Bank may agree; provided, however, that the provisions of this
paragraph shall not apply if the Borrower establishes to the satisfaction of
the Bank that adequate funds for the Project are available to the Borrower from
other sources on terms and conditions consistent with the obligations of the
Borrower under this Agreement;
(b) (i) Subject to
subparagraph (ii) of this paragraph, the right of the Borrower to use the EU
Grant made to the Borrower for the carrying out of the Project shall have been
suspended, canceled or terminated in whole or in part, pursuant to the terms of
the EU Grant Agreement providing therefor.
(ii) Subparagraph (i)
of this paragraph shall not apply if the Borrower establishes to the
satisfaction of the Bank that: (A) such suspension, cancellation or termination
is not caused by the failure of the Borrower to perform any of its obligations
under the EU Grant Agreement; and (B) adequate funds for the Project are
available to the Borrower from other sources on terms and conditions consistent
with the obligations of the Borrower under this Agreement.
Article VI
Effectiveness Date; Termination
Section 6.01. The
following event is specified as a condition to the effectiveness of the Loan
within the meaning of Section 12.01 (c) of the General Conditions, namely that
the Borrower shall have submitted to the Bank a decision of Co-Chairpersons of
the Project Steering Committee, satisfactory to the Bank, defining the status,
functions, decision-making process and reporting arrangements for the Project
Steering Committee and the PIU.
Section 6.02. The date
ninety (90) days after the date of this Agreement is hereby specified for the
purposes of Section 12.04 of the General Conditions.
Article VII
Representative of the Borrower; Addresses
Section 7.01. The Minister of Finance of the
Borrower is designated as representative of the Borrower for the purposes of
Section 11.03 of the General Conditions.
Section 7.02. The following addresses are
specified for the purposes of Section 11.01 of the General Conditions:
For the Borrower:
Ministry of Finance
Katan~i}eva 5
10000
Zagreb
Croatia
Telex: Facsimile:
862-21215 385-1-492-2583 862-28133
For the Bank:
International
Bank for
Reconstruction
and Development
1818
H Street, N.W.
Washington,
D.C. 20433
United
States of America
Cable
address: Telex: Facsimile:
INTBAFRAD 248423 (MCI) (202)477-6391
Washington, D.C. 64145
(MCI)
In witness whereof,the parties hereto,
acting through their duly authorized representatives, have caused this
Agreement to be signed in their respective names in Zagreb, Republic of
Croatia, as of the day and year first above written.
REPUBLIC OF CROATIA INTERNATIONAL BANK
By Mato
Crkvenac, FOR
RECONSTRUCTION
Authorized
RepresentativeAND DEVELOPMENT
By
Andrew N. Vorkink,
Director
South
Central Europe Country
Unit Europe and
Central Asia
SCHEDULE 1
Withdrawal of the Proceeds of the Loan
1. The table below sets forth the Categories of
items to be financed out of the proceeds of the Loan, the allocation of the
amounts of the Loan to each Category and the percentage of expenditures for
items so to be financed in each Category:
Category Amount of the % of
Loan Allocated Expenditures
(Expressed in to be Financed
Euro)
(1)Works 400,000 82%
(2)Goods 6,250,000
100% of foreign
expenditures,
100%
of
local expenditures
(ex-factory
cost), and
80%
of local
expenditures
for
other
items procured
locally
(3)Technical services10,400,000 82%
(4)Consultants’ 5,950,000 100% of expenditures
services, incurred
by foreign
audit and training consultants and 75%
of expenditures
incurred
by local
consultants
(5)Service contracts800,000 82%
(6)Operating costs1,200,000 70% of expenditures incurred prior to
December
31, 2003;
50%
of expenditures
incurred
prior to
December
31, 2004; and
30% of expenditures
incurred
thereafter
(7) Fee 260,000 Amount due under Section 2.04
of
this Agreement
(8) Unallocated 740,000
TOTAL 26,000,000
2. For the purposes of this Schedule:
(a) the term »foreign
expenditures« means expenditures in the currency of any country other than that
of the Borrower for goods or services supplied from the territory of any
country other than that of the Borrower;
(b) the term »local
expenditures« means expenditures in the currency of the Borrower or for goods
or services supplied from the territory of the Borrower;
(c) the term »training«
means expenditures incurred on the account of the training activities under the
Project and includes trainees’ fees, transportation costs for trainees and
trainers, per diem allowances for trainees and trainers, cost of study tours
and translation;
(d) the term »technical
services« means services for carrying out cadastre surveying, orthophoto
mapping, development of information technology systems and other services to be
contracted under the Project on the basis of performance of measurable physical
outputs;
(e) the term »service
contracts« means the cost of services for carrying out data entry and
verification, typing and clerical work in land registry offices of municipal
courts; and
(f) the term »operating
costs« means: (i) incremental operating costs incurred on account of Project
implementation by the PIU, Institutional Teams and LRMU, including
communications costs, transportation costs, fuel, vehicle maintenance, office
equipment and supplies, equipment maintenance and audit costs; and (ii) travel
costs and per diem allowances for the staff of municipal courts assigned to
work in different locations.
3. Notwithstanding the
provisions of paragraph 1 above, no withdrawals shall be made in respect of
payments made for expenditures prior to the date of this Agreement, except that
withdrawals under categories (2), (4) and (6), in an aggregate amount not
exceeding the equivalent of Euro 260,000, may be made on account of payments
made for expenditures incurred before that date but after February 1, 2002.
4. The Bank may require
withdrawals from the Loan Account to be made on the basis of statements of
expenditure for: (a) works under contracts costing less than the equivalent of
$600,000 each; (b) goods and technical services under contracts costing less
than the equivalent of $300,000 each; (c) services provided by consulting firms
under contracts costing less than the equivalent of $200,000 each; (d) services
provided by individual consultants under contracts costing less than the
equivalent of $50,000 each; and (e) training and operating costs, all under
such terms and conditions as the Bank shall specify by notice to the Borrower.
SCHEDULE 2
Description of the Project
The objective of the Project is to assist the
Borrower in developing an efficient land administration system in order to
improve functioning of real property markets through enhancing the land
registration and cadastre systems.
The Project consists of the following parts,
subject to such modifications thereof as the Borrower and the Bank may agree
upon from time to time to achieve such objectives:
Part A: Real Property Registration System
Development
1. Provision of technical assistance and
equipment to the Land Registration and Management Unit (LRMU) within the MOJ.
2. Streamlining and computerization of the
demand-driven and systematic land registration processes in municipal courts
through provision of computer equipment, software development of necessary
methodologies, implementation of a strategy to manage and reduce the volume of
paper records in the land book offices, including through their conversion into
digital format, and the formulation of activity plans for the municipal courts.
3. Provision of technological and technical
support for managing and administering the information systems in municipal
courts and the LRMU, including the provision of »help-desk« facilities.
4. Assistance in the implementation of a
registration backlog alleviation program to clear backlogs in the land registry
offices of municipal courts, including the use of contracted workers for
conversion of paper records into digital format, data verification and entry
and other measures.
5. Assistance in the development and
implementation of a program of legal assistance for the most disadvantaged
citizens in the area of property rights.
Part B: Cadastre System Development
1. Provision of assistance to the State Geodetic
Administration (SGA) and to the Zagreb City Cadastre Office to streamline and
develop new technical standards and regulations for the cadastre system and for
the development and implementation of a strategy to manage and reduce paper
records in the cadastre system, and to develop and implement business and
corporate plans.
2. Provision of technological support and
technical assistance to selected regional branches of the SGA and the Zagreb
City Cadastre Office in administering information systems, including the
provision of »help-desk« facilities.
3. Provision of assistance to the SGA to develop
and implement a multipurpose spatial information system through the provision
of technical assistance, IT system design and equipment, training, and data
conversion contracts.
4. Provision of equipment and technical
assistance for the SGA headquarters, regional and branch cadastre offices, the
Croatian Geodetic Institute and the Zagreb City Cadastre Office and
implementation of quality control mechanisms.
Part C: Inter-Institutional
Operations and Information Technology
1. Provision of assistance for the initial data
verification, entry and conversion into the land registration systems based on
electronic data processing of existing data, stored in the land books.
2. Carrying out of
cadastral mapping and land book renewal including: (a) aerial mapping; (b)
systematic cadastre surveys; (c) matching and resolving conflicting parcel and
land holder information between the two systems; and (d) the final production
of new cadastre registers and maps, and land book renewals.