GUIDELINES PROCUREMENT UNDER IBRD LOANS AND IDA CREDITS
I. INTRODUCTION
Purpose
1.1 The purpose of these Guidelines is to inform those carrying out a project that is financed in whole or in part by a loan from the International Bank for Reconstruction and Development (BRD) or a credit from the International Development Association (IDA)1 of the arrangements to be made for procuring the goods and works2 (including related services) required for the project. The Loan Agreement governs the legal relationships between the Borrower and the Guidelines are made applicable to procurement of goods and works for the project, as provided in the agreement. The rights and obligations of the Borrower and the providers of goods and works for the project are governed by the bidding3 documents, and by the contracts signed by the Borrower with the providers of goods and works, and not by these Guidelines or the Loan Agreements. No party other than the parties to the Loan Agreement shall derive any rights therefrom or have any claim to loan proceeds.
General Considerations
1.2 The responsibility for the implementation of the project, and therefore for the award and administration of contracts under the project, rests with the Borrower.4 The Bank, for its part, is required by its Articles of Agreement to«... ensure that the proceeds of any loan are used only for the purposes for which the loan was granted, with due attention to considerations of economy and efficiency and without regard to political or other non-economic influences or consderations,«5 and it has established detailed procedures for this purpose. While in practice the specific procurement rules and procedures to be followed in the implementation of a project depend on the circumstances of the particular case, four considerations generally guide the Bankžs requirements:
(a) the need for economy and efficiency in the implementation of the project, including the procurement of the goods and works involved;
(b) the Bankžs interest as a cooperative institution in giving all eligible bidders from developed and developing countries6 an opportunity to compete in providing goods and works financed by the Bank;
(c) the Bankžs interest as a development institution, in encouraging the development of domestic contracting and manufacturing industries in the borrowing country; and
(d) the importance of transparency in the procurement process.
1.3 The Bank has found that, in most cases, these needs and interests can be realized through International Competative Bidding (ICB). properly administered, and with suitable allowance for preferences for domestically manufactured goods and, where appropriate, for domestic Contractors7 for works under prescribed conditions. In such cases, therefore, the Bank requires its Borrowers to obtain goods and works through ICB open to eligible Suppliers and Contractors.8 Section II of these Guidelines describes the procedures for ICB.
1.4. On the other hand, where ICB is clearly not the most economic and efficient method of procurement, other methods of procurement are specified in the Loan Agreement. Section III describes these other methods of procurement and the circumstances under which their application would be more appropriate. The particular methods to be followed for the procurement of goods and works for a given project specified in the Loan Agreement for such project.
Applicability of Guidelines
1.5 Generally the Bank finances only a part of the cost of the project. The procedures outlined in these Guidelines apply to all contracts for goods and works financed on whole or in par from Bank loans. For the procurement of those contracts for goods and works not financed from a Bank loan, the Borrower may adopt other procedures. In such cases the Bank shall be satisfied that the procedures to be used will fulfill the Borroweržs obligations to cause the project to be carried out diligently and efficiently, and that the goods and works to be procured:
(a) are of satisfactory quality and are compatible with the balance of the project;
(b) will be delivered or completed in timely fashion; and
(c) are priced so as not to affect adversely the economic and financial viability of the project.
Eligibility
1.6 Funds from Bank loans are disbursed only on account of expenditures for goods and works provided by nationals of, and produced in or supplied from, Bank member countries.9 Under this policy, nationals of other countries or bidders offering goods and works from other countries shall be disqualified from bidding for contracts intended to be financed in whole or in part from Bank loans.
1.7 In connection with any contract to be financed in whole or in part from a Bank loan, the Bank does not permit a Borrower to deny prequalification, if required, to a firm for reasons unrelated to its capability and resources to successfully perform the contract; nor does permit a Borrower to disqualify any bidder for such reasons.
1.8 As exceptions to the foregoing:
(a) Firms of a member country or goods manufactured in a member
country may be excluded if, (i) as a matter of law or official regulation the Borroweržs country prohibits commercial relations with that country, provided that the Bank is satisfied that such exclusion does not preclude effective competition for the supply of goods or works required, or (ii) by an act of compliance with a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations the Borroweržs country prohibits any import of goods from that country or any payments to persons or entities in that country.
(b) A firm which has been engaged by the Borrower to provide consulting services for the preparation or implementation of a project, and any of its affiliates, shall be disqualified from subsequently providing goods or woorks (other than a continuation of the firmžs earlier consulting services) for the same project. This provision does not apply to the various firms (Consultants, Contractors or Suppliers) which together are performing the Contractoržs obligations under a turnkey or design and build contract.10
(c) Government-owned enterprises in the Borroweržs country may participate only if they can establish that they (i) are legally and financially autonomous, and (ii) operate under commercial law. No dependent agency of the Borrower or Sub-Borrower under a Bank-financed project shall be permitted to bid or submit a proposal for the procurement of goods or works under the project.11
(d) A firm declared ineligible by the Bank in accordance with subparagraph (d) of paragraph 1.15 of these Guidelines shall be inlegible to be awarded a Bank-financed contract during the period of time determined by the Bank.
Advance Contracting and Retroactive Financing
1.9 In certain circumstances, such as to accelerate project implementation, the Borrower may wish to proceed with the initial steps of procurement before signing the related Bank loan. The procurement procedures, including advertising, shall be in accordance with the Guidelines in order for the eventual contracts to be eligible for Bank financing, and the normal review process by the Bank shall be followed. A Borrower undertakes such advance contracting at its own risk, and any concurrence by the Bank with the procedures, documentation, or proposal for award does not commit the Bank to make a loan for the project in question. If the contract is signed, reimbursement by the Bank of any payments made by the Borrower under the contract prior to loan signig is referred to as retroactive financing and is only permitted within the limits specified in the Loan Agreement.
Joint Ventures
1.10 Suppliers and Contractors in the Borroweržs country are encouraged to participate in the procurement process since the Bank encourages the development of domestic industry. They may bid independently or in joint venture with foreign firms, but the Bank will not accept conditions of bidding which require mandatory yoint ventures or other forms of mandatory association between domestic and foreign firms.
Bank Review
1.11 The Bank reviews the Borroweržs procurement procedures, documents, bid evaluations, award recommendations, and contracts to ensure that the procurement process is carried out in accordance with the agreed procedures. These review procedures are described in Appendix 1. The Loan Agreement shall specify the extent to which these review procedures shall apply in respect of the different categories of goods and works to be financed, in whole or in part, from the Bank loan.
1 Procurement requirements of IBRD and IDA are identical, and references in these Guidelines to the Bank include both IBRD and IDA, and references to loans include credits and project preparation facilities (PPFs). Loan Agreement includes Development Credit Agreement and Project Agreement.
2 References to »goods« and »works« in these Guidelines include related services such as transportation, insurance, installation, commissioning, training, and initial maintenance. »Goods« includes commodities, raw material, machinery, equipment, and industrial plant. The provisions of these Guidelines also apply to services which are bid and contracted on the basis of performance of a measurable physical output, such as drilling, mapping, and similar operations. These Guidelines do not refer Consultantsž services, to which the current Guidelines: Use of Consultants by World Bank Borrowers and by the World Bank as Executing Agency apply (referred to herein as Consultant Guidelines).
3 For the purposes of these Guidelines, the words »bid« and »tender« shall have the same meaning.
4 In some cases, the Borrower acts only as an intermediary, and the project is carried out by another agency or entity. References in these Guidelines to the Borrower include such agencies and entities, as well as Sub-Borrowers under on-lending arrangements.
5 The Bankžs Articles of Agreement; Article III, Section 5(b).
6 See para. 1.6.
7 For purposes of these Guidelines, »Contractor« refers only to a firm providing construction services.
8 See para. 1.6.
9 See Section 5.01 of General Conditions Applicable to Loan and Guarantee Agreements, dated January 1, 1985. The Bank maintains a list of countries from which bidders, goods and services are not eligible to participate in procurement financed by the Bank. The list is regularly updated and can be obtained from the Public Information Center of the World Bank.
10 See para. 2.5.
11 Other than Force Account units, as permitted under para 3.8.
Reserved Procurement
1.12 When open competition would be the appropriate method of procurement for particular goods or works of the project, but the Borrower wishes to reserve this procurement for one or more specific firms or enterprises, the Bank may accept such reserved procurement only on condition that:
(a) it is not eligible for financing out of the Bank loan; and
(b) it will not significantly affect the satisfactory project implementation in terms of costs, quality, and completion time.
Misprocurement
1.13 The Bank does not finance expenditures for goods and works which have not been procured in accordance with the agreed procedures in the Loan Agreement, and it is the policy of the Bank to cancel that portion of the loan allocated to the goods and works that have been misprocured. The Bank may, in addition, exercise other remedies under the Loan Agreement.
References to Bank
1.14 If the Borrower wishes to refer to the Bank in procurement documents, the following language shall be used:
»(name of Borrower) has received (or in appropriate cases žhas applied forž) a loan from the International Bank for Reconstruction and Development in various curenncies equivalent to USD... toward the cost of (name of project), and intends to apply a portion of the proceeds of this loan to eligible payments under this contract. Payment by the International Bank for Reconstruction and Development will be made only at the request of (name of Borrower or designate) and upon approval by the International Bank for Reconstruction and Development, and will be subject, in all respects, to the terms and conditions of the Loan Agreement. The Loan Agreement prohibits a withdrawal from the Loan Account for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import, to the knowledge of the Bank, is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations. No party other than (name of Borrower) shall derive any rights from the Loan Agreement or have any claim to loan proceeds.«12
Fraud and Corruption
1.15 Its is the Bankžs policy to require that Borrowers (including beneficiaries of Bank loans), as well as bidders/Suppliers/Contractors under Bankfinanced contracts, observe the highest standard of ethics during the procurement and execution of such contracts. In pursuance of this policy, the Bank:
(a) defines, for the purposes of this provision, the terms set forth below as follows:
(i) »corrupt practice« means the offering, giving, receiving, or soliciting of any thing of value to influence the action of a public official in the procurement process or in contract execution; and
(ii) »fraudulent practice« means a misrepresentation of facts in order to influence a procurement process or the execution of a contract to the detriment of the Borrower, and incluedes collusive practices among bidders (prior to or after bid submission) designed to establish bid prices at artificial, noncompetitive levels and to deprive the Borrower of the benefits of free and open competition;
(b) will reject a proposal for award if it determines that the bidder recommended for award has engaged in corrupt or fraudulent practices in competing for the contract in question;
(c) will cancel the portion of the loan allocated to a contract for goods or works if it at any time determines that corrupt or fraudulent practices were engaged in by representatives of the Borrower or of a beneficiary of the loan during the procurement or the execution of that contract, without the Borrower having taken timely and appropriate action satisfactory to the Bank to remedy the situation;
(d) will declare a firm ineligible, either indefinitely or for a stated period of time, to be awarded a Bank-financed contract if it at any time determines that the firm has engaged in corrupt of fraudulent practices in competing for, or in exucuting, a Bank financed contract; and
(e) will have the right to require that, in contracts financed by a Bank loan, a provision be included requiring Suppliers and Contractors to permit the Bank to incpect their accounts and records relating to the performance of the contract and to have them audited by auditors appointed by the Bank.
II. INTERNATIONAL COMPETITIVE BIDDING
A. General
Introduction
2.1 The objective of International Competitive Bidding (ICB), as described in these Guidelines, is to provide all eligible prospective bidders13 with timely and adequate notification of a Borroweržs requirements and an equal opportunity to bid for the required goods and works.
Type and Size of Contracts
2.2 The bidding documents shall clearly state the type of contract to be entered into and contain the proposed contract provisions appropriate therefor. The most common types of contracts provide for payments on the basis of a lump sum, unit prices, reimbursable cost plus fees, or combinations thereof. Reimbursable cost contracts are acceptable to the Bank only in exceptional circumstances such as conditions of high risk or where costs cannot be determined in advance with sufficient accuracy. Such contracts shall include appropriate incentives to limit costs.
2.3 The size and scope of individual contracts will depend on the magnitude, nature, and location of the project. For projects requiring a variety of goods and works, separate contracts generally are awarded for the supply and/or installation of different items of equipment and plant14 and for the works.
2.4 For a project requiring similar but separate items of equipment or works, bids may be invited under alternative contract options that would attract the intereset of both small and large firms, which could be allowed, at their option, to bid for individual contracts (slices) or for a group of similar contracts (package). All bids and combinations of bids shall be received by the same deadline and opened and evaluated simultaneously so as to determine the bid or combination of bids offering the lowest evaluated cost to the Borrower15
2.5 In certain cases, such as special processes, closely integrated manufacturing, or works of a special nature, the Bank may accept or require a turnkey contract under which the design and engineering, the supply and installation of equipment, and the construction of a complete industrial plant or works are provided under one contract. Alternatively, the Borrower may remain responsible for the design and engineering, and invite bids for a single responsibility contract for the supply and installation of all goods and works required for the project component. Design and build, and management contracting16 contracts are also acceptable where appropriate.
Two-State Bidding
2.6 Detailed desing and engineering of the goods and works to be provided, including the preparation of technical specifications and other bidding documents, normally precede the invitation to bid for major contracts. However, in the case of turnkey contracts or contracts for large complex plants or works of a special nature, it may be undesirable or impractical to prepare complete technical specifications in advance. In such a case, a two-stage bidding procedure may be used, under which first unpriced technical proposals on the basis of a conceptual design or performance specifications are invited, subject to technical as wall as commericial clarifications and adjustments, to be followed by amended bidding documents and the submission of final technical proposals and prices bids in the second stage. These procedures are also appropriate in the procurement of equipment whidch is subject to rapid technological advances, such a major computer and communications systems.17
Notification and Advertising
2.7 Timely notification of bidding opportunities is essential in competitive bidding. For projects which include procurement on the basis of ICB, the Borrower is required to prepare and submit to the Bank a draft General Procurement Notice. The Bank will arrange for its publication in Development Business (UNDB).18 The Notice shall contain information concerning the Borrower (or prospective Borrower), amount and purpose of the loan, scope of procurement under ICB, and the name and address of the Borroweržs agency responsible for procurement. If known, the scheduled date for availability of prequalification or bidding documents ahould be indicated. The Borrower shall maintain a list of responses to the Notice. The related prequalification or bidding documents, as the case may be, shall not be released to the public earlier than eight weeks after the date of publication of the Notice. The General Procurement Notice shall be updated annually for all outstanding procurement.
2.8 The international community shall also be notified in a timely manner of the oportunities to bid for specific contracts. To that end, invitations to prequalify or to bid, as the case may be, shall be advertised as Specific Procurement Notices in at least one newspaper of national circulation in the Borroweržs country (and in the official gazette, if any). Such invitations shall also be transmitted to those who have expressed intereset in bidding in response to the General Procurement Notice. Publication of the invitations in Development Business is also encouraged. Borrowers are also strongly encouraged to transmit such invitations to embassies and trade representatives of countries of likely Suppliers and Contractors. Additionally, for large, specialized, or important contracts, Borrowers shall advertise the invitations in Development Business and/or well-known technical magazines, newspapers, and trade publications of wide international circulation. Notification shall be given in sufficient time to enable prospective bidders to obtain prequalification or bidding documents and prepare and submit their response.19
Prequalification of Bidders
2.9 Prequalification is usually necessary for large or complex works, or in any other circumstances in which teh high costs of preparing detailed bids could discourage competition, such as custom-designed equipment, industrial plant, specialized services, and contracts to be let under turnkey, design and build, or management contracting. This also ensures that invitations to bid are extended only to those who have adequate capabilities and resources. Prequalification may also be useful te determine eligibility for preference for domestic Contractors where this is allowed.20 Prequalification shall bez based entirely upon the capability and resources of prospective bidders to perform the particular contract satisfactorily, taking into account their (i) experience and past performance on similar contracts, (ii) capabilities with respect to personnel, equipment, and construction or manufacturing facilities, and (iii) financial position.21
2.10 The invitation to prequalify for bidding on specific contracts or groups of similar contracts shall be advertised and notified as described in paragraphs 2.7 and 2.8 above. The scope of the contract and a clear statement of the requirements for qualification shall be sent to those who responded to the invitation. All such applicants that meet the specified criteria shall be allowed to bid. Borrowers shall inform all application of the results of prequalification. As soon as prequalification is completed, the bidding documents shall be made available to the qualified prospective bidders. For prequalification for groups of contracts to be awarded over a period of time, a limit for the number or total value of awards to any one bidder may be made on the basis of the bidderžs resources. The list of prequalified firms in such instances shall be updated periodically. Verification of the information provided in the submission for prequalification shall be confirmed at the time of award of contract, and award may be denied to a bidder that is judged to no longer have the capability or resources to successfully perform the contract.
B. Bidding Documents
General
2.11 The bidding documents shall furnish all information necessary for a prospective bidder to prepare a bid for the goods and works to be provided. While the detail and complexity of these documents may vary with the size and nature of the proposed bid package and contract, they generally include: invitation to bid; instructions to bidders; form of bid; form of contract; conditions of contract, both general and special; specifications and drawings; list of goods or bill of quantities; delivery time or schedule of completion; and necessary appendices, such as formats for various securities. The basis for bid evaluation and selection of the lowest evaluated bid shall be clearly outlined in the instructions to bidders and/or the specifications. If a fee is charged for the bidding documents, it shall be reasonable and reflect only the cost of their printing and delivery to prospective bidders, and shall not be so high as to discourage qualified bidders. Guidance on critical components of the bidding documents are given in the following paragraph.
2.12 Borrowers shall use the appropriate Standard bidding Documents (SBDs) issued by the Bank with minimum changes, acceptable to the Bank, as necessary to address country - and projects-specific issues. Any such changes shall be introduced only through bid or contract data sheets, or through special conditions of contract, and not by introducing changes in the standard wording of the Bankžs SBDs. Where no relevant standard bidding documents have been issued, the Borrower shall use other internationally recognized standard conditions of contract and contract forms acceptable to the Bank.
Validity of Bids and Bid Security
2.13 Bidders shall be required to submit bids valid for a period specified in the bidding documents which shall be sufficient to enable the Borrower to complete the comparison and evaluation of bids, review the recommendation of award with the Bank (if required by the Loan Agreement), and obtain all the necessary approvals so that the contract can be awarded within that period.
2.14 Bid security, in the amount specified in the bidding documents, affording the Borrower reasonable protection against irresponsible bids, may be required, but it shall not be set so high as to discourage bidders. The bid security, at the bidderžs option, shall be in the form of a certified check, a letter of credit or a bank guarantee from a reputable bank. Bidders shall be allowed to submit bank guarantees directly issued by a bank of their choice located in any eligible country. Bid security shall remain valid for a period of four weeks beyond the validity period for the bids, in order to provide reasonable time for the borrower to act if the security is to be called. Bid security shall be released to unsuccessful bidders once it is determined that they will not be awarded a contract.
Language
2.15 Prequalification and bidding documents shall be prepared in either English, French, or Spanish, and shall specify that the text of the contract documents in that language is governing. However, contracts entered into with local bidders (excluding joint ventures between local and foreign firms) may, at the Borroweržs option, be in the national language of the Borrower, which shall be the governing language for such contracts.
Clarity of Bidding Documents
2.16 Bidding documents shall be so worded as to permit and encourage international competition and shall set forth clearly and precisely the work to be carried out, the location of the work, the goods to be supplied, the place of delivery or installation, the schedule for delivery or completion, minimum performance requirements, and the warranty and maintenance requirements, as well as any other pertinent terms and conditions. In addition, the bidding documents, where appropriate, shall define the tests, standards, and methods that will be employed to judge the conformity of equipment as delivered, or works as performed, with the specifications. Drawings shall be consistent with the text of the specifications, and an order of precedence between the two shall be specified.
2.17 The bidding documents shall specify any factors, in addition to price, which will be taken into account in evaluating bids, and how such factors will be quantified or otherwise evaluated. If bids based on alternative disgns, material, completion schedules, payment terms, etc., are permitted, conditions for their acceptability and the method of their evaluation shall be expressly stated.
2.18 All prospective bidders shall be provided the same information, and shall be assured of equal opportunities to obtain additional information on a timely basis. Borrowers shall provide reasonable access to project sites for visits by prospective bidders. For works or complex supply contracts, particularly for those requiring refurbishing existing works or equipment, a pre-bid conference may be arranged whereby potential bidders may meet with the Borrower representatives to seek clarifications. Minutes of the conference shall be provided to all prospective bidders with a copy to the Bank. Any additional information, clarification, correction of errors, or modifications of bidding documents shall be sent to each recipient of the original bidding documents in sufficient time before the deadline for receipt of bids to enable bidders to take appropriate actions. If necessary, the deadline shall be extended.
Standards
2.19 Standards and technical specifications quoted in bidding documents shall promote the broadest possible competition, while assuring the critical performance or other requirements for the goods and/or works under procurement. As far as possible, the Borrower shall specify internationally accepted standards such as those issued by the International Standards Organization with which the equipment or materials or workmanship shall comply. Where such international standards are unavailable or are inappropriate, national standards may be specified. In all cases, the bidding documents shall state that equipment, material, or workmanship meeting other standards, which promise at least substantial equivalence, will also be accepted.
Use of Brand Names
2.20 Specifications shall be based on relevant characteristics and/or performance requirements. References to brand names, catalog numbers, or similar classifications shall be avoided. If it is necessary to quote a brand name or catalog number of a particular manufacturer to clarify an otherwise incomplete specification, the words »or equivalent« shall be added after such reference. The specification shall permit the acceptance of offers for goods which have similar characteristics and which provide performance at least substantially equivalent to those specified.
Pricing
2.21 Bids for goods shall be invited on the basis of CIF (port of destination), or CIP22 (place of destination) for all goods offered from abroad, and EXW23 (ex works, ex factory, or off-the-shelf) for locally available or manufactured or assembled goods, including those previously imported. Bidders shall be allowed to arrange for ocean and other transportation and related insurance from any eligible source.24 Where inland transportation, installation, commissioning, or other similar services are required to be performed by the bidder, as in the case of »supply and installation« contracts, the bidder shall be required to quote for these services, in addition.
2.22 In the case of turnkey contracts, the bidder shall be required to quote the price of the installed plant at site, including all costs for supply of equipment, marine and local transportation and insurance, installation, and commissioning, as well as associated work and all other services included in the scope of contract such as design, maintenance, operation, etc. Unless otherwise specified in the bidding documents, the turnkey price shall include all duties, taxes, and other levies.25
2.23 Bidders for works contracts shall be required to quote unit prices or lump sum prices for the performance of the works, and such prices shall include all duties, taxes, and other levies. Bidders shall be allowed to obtain all inputs (except for unskilled labor) from any eligible sources so that they may offer their most competitive bids.
Price Adjustment
2.24 Bidding documents shall state either that (i) bid prices will be fixed or (ii) that price adjustments will be made to reflect any changes (upwards or downwards) in major cost components of the contract, such as labor, equipment, materials, and fuel. Price adjustment provisions are usually not necessary in simple contracts involving delivery of goods or completion of works within eighteen months, but shall be included in contracts which extend beyond eighteen months. However, it is normal commercial practice to obtain firm prices for some types of equipment regardless of the delivery time and, in such cases, price adjustment provisions are not needed.
2.25 Prices may be adjusted by the use of a prescribed formula (or formulae) which breaks down the total price into components that are adjusted by price indices specified for each component or, alternatively, on the basis of documentary evidence (including actual invoices) provided by the Supplier or Contractor. The use of the formula method of price adjustment is preferable to that of documentary evidence. The method to be use, the formula (if applicable), and the base date for application shell be clearly defined in the bidding documents. If the payment currency is different from the source of the input and corresponding index, a correction factor shall be applied in the formula, to avoid incorrect adjustment.
Transportation and Insurance
2.26 Bidding documents shall permit Suppliers and Contractors to arrange transportation and insurance from any eligible source. Bidding documents shall state the types and terms of insurance to be provided by the bidder. The indemnity payable under transportation insurance shall be at least 110 percent of the contract amount in the currency of the contract or in a freely convertible currency to enable prompt replacement of lost or damaged goods. For works, a Contractoržs All Risk form of policy usually shall be specified. For large projects with several Contractors on a site, a »wrap-up« or total project insurance arangement may be obtained by the Borrower, in which case the Borrower shall seek competition for such insurance.
2.27 As an exception, if a Borrower wishes to reserve transportation and insurance for the import of goods to national companies or other designated sources, bidders shall be asked to quote FOB (port of shipment) or CFR (post of destination)26 prices in addition to the CIF (port of destination) or CIP (place of destination) price specified in paragraph 2.21. Selection of the lowest evaluated bid shall be on the basis of the CIF or CIP price, but the Borrower may sign the contract on FOB or CFR terms and make its own arrangement for transportation and/or insurance. Under such circumstances, disbursements under the Bank loan shall be limited to the FOB or CFR cost. If the Borrower does not wish to obtain insurance coverage in the market, evidence shall be provided to the Bank that resources are readily available for prompt payment in a freely convertible currency of the indemnities required to replace lost or damaged goods.
Currency Provisions
2.28 Bidding documents shall state the currency or currencies in which bidders are to state their prices, the procedure for conversion of prices expressed in different currencies into a single currency for the purpose of comparing bids, and the currencies in which the contract price will be paid. The following provisions (paragraphs 2.29-2.33) are intended to (i) ensure that bidders have the opportunity to minimize any exchange risk with regard to the currency of bid and of payment, and hence may offer their best prices; (ii) give bidders in countries with weak currencies the option to use a stronger currency and thus provide a firmer basis for bid price; and (iii) ensure fairness and transparency in the evaluation process.
Curreny of Bid
2.29 Bidding documents shall state that the bidder may express the bid price in the currency of any member country, or in ECUs.27 If the bidder wishes to express the bid price as a sum of amounts in different foreign currencies, he may do so, provided the price includes no more than three foreign currencies. Furthermore, the Borrower may require bidders to state the portion of the bid price representing local costs in the currency28 of the country of the Borrower.
2.30 In bidding documents for works, the Borrower may require bidders to state the bid price entirely in the local currency, along with the requirements for payments in up to three foreign currencies of their choice for expected inputs from outside the Borroweržs country (which inputs the bidders may be required to list), expressed as a percentage of the bid price, together with the exchange rates used in such calculations.
Currency Conversion for Bid Comparison
2.31 The bid price in the sum of all payments in various currencies required by the bidder. For the purpose of comparing prices, bid prices shall be converted to a single currency selected by the Borrower (local currency or fully convertible foreign currency) and stated in the bidding documents. The Borrower shall make this conversion by using the selling (exchange) rates for those curencies quoted by an official source (such as the Central Bank) or by a commercial bank or by an internationally circulated newspaper for similar transactions on a date selected in advance, such source and date to be specified in the bidding documents, provided that the date shall not be earlier than four weeks prior to the deadline for the receipt of bids, nor later than the original date for the expiry of the period of bid validity.
Currency of Payment
2.32 Payment of the contract price shall be made in the currency or currencies in which the bid price is expressed in the bid of the successful bidder.
2.33 When the bid price is required to be stated in the local currency but the bidder has requested payment in foreign currencies expressed as a percentage of the bid price, the exchange rates to be used for purposes of payments shall be those specified by the bidder in the bid, so as to ensure that the value of the foreign currency portions of the bid is maintained without any loss or gain.
Terms and Methods of Payment
2.34 Payment terms shall be in accordance with the international commercial practices applicable to the specific goods and works.
(a) Contracts for supply of goods shall provide for full payment on the delivery and inspection, if so required, of the contracted goods except for contracts involving installation and commissioning, in which case a portion of the payment may be made after the Supplier has complied with all its obligations under the contract. The use of letters of credit is encouraged so as to assure prompt payment to the Supplier. In major contracts for equipment and plant, provision shall be made for suitable advances and, in contracts of long duration, for progress payments during the period of manufacture or assembly.
(b) Contracts for works shall provide in appropriate cases for mobilization advances, advances on Contractoržs equipment and materials, regular progress payments, and reasonable retention amounts to be released upon compliance with the Contractoržs obligations under contract.
2.35 Any advance payment for mobilization and similar expenses, made upon signature of a contract for goods or works, shall be related to the estimated amount of these expenses and be specified in the bidding documents. Amounts and timing of other advances to be made, such as for materials delivered to the site for incorporation in the works, shall also be specified. The bidding documents shall specify the arrangements for any security required for advance payments.
2.36 Bidding documents shall specify the payment method and terms offered, whether alternative payment methods and terms would be allowed and, if so, under what circumstances. To method of payment shall take into account the available procedures for withdrawals of the proceeds of the loan, as described in Appendix 3.
Conditions of Contract
2.37 The contract documents shall clearly define the scope of work to be performed, the goods to be supplied, the rights and obligations of the Borrower and of the Supplier or Contractor, and the functions and authority of the engineer, architect, or construction manager, if one is employed by the Borrower, in the supervision and administration of the contract. In addition to the general conditions of contract, any special conditions particular to the specific goods or works to be procured and the location of the project shall be included.
Performance Security
2.38 Bidding documents for works shall require security in an amount sufficient to protect the Borrower in case of breach of contract by the Contractor. This security shall be provided by a performance bond or a bank guarantee in an appropriate form and amount, as specified by the Borrower in the bidding document. The amount of the bond or guarantee may vary, depending on the type of security furnished and on the nature and magnitude of the works. A portion of this security shall extend sufficiently beyond the date of completion of the works to cover the defects liability or maintenance period up to final acceptance by the Borrower; alternatively, contracts may provide for a percentage of each periodic payment to be held as retention money until final acceptance. Contractors may be allowed to replace retention money with an equivalent security after provisional acceptance.
2.39 In contracts for the supply of goods, the need for performance security depends on the market conditions and commercial practice for the particular kind of goods. Suppliers or manufactures may be required to provide a bank guarantee to protect against nonperformance of the contract. Such security in an appropriate amount may also cover warranty obligations or, alternatively, a percentage of the payments may be held as retention money to cover warranty obligations, and any installation or commissioning requirements. The security or retention money shall be reasonable in amount.
Liquidated Damages and Bonus Clauses
2.40 Provisions for liquidated damages or similar provisions in an appropriate amount shall be included in the conditions of contract when delays in the delivery of goods, completion of works or failure of the goods or works to meet performance requirements would result in extra cost, or loss of revenue or loss of other benefits to the Borrower. Provision may also be made for a bonus to be paid to Suppliers or Contractors for completion of works or delivery of goods ahead of the times specified in the contract when such earlier completion or delivery would be of benefit to the Borrower.
Force Majeure
2.41 The conditions of contract shall stipulate that failure on the part of the parties to perform their obligations under the contract will not be considered a default if such failure is the result of an event of force majeure as defined in the conditions of contract.
Applicable Law and Settlement of Disputes
2.42 The conditions of contract shall include provisions dealing with the applicable law and the forum for the settlement of disputes. International commercial arbitration may have practical advantages over other methods for the settlement of disputes. Borrowers are, therefore, encouraged to provide for this type of arbitration in contracts for the procurement of goods and works. The Bank shall not be named arbitrator or be asked to name an arbitrator.29 In case of works contracts, supply and installation contracts, and turnkey contracts, the dispute settlement provision shall also include mechanisms such as dispute review boards or adjudicators, which are designed to permit a speedier dispute settlement.
C. Bid Opening, Evaluation, and Award of Contract
Time for Preparation of Bids
Bid Opening Procedures
2.44 The time for the bid opening shall be the same as for the deadline for receipt of bids or promptly30 thereafter, and shall be announced, together wiht the place for bid opening, in the inivitation to bid. The Borrower shall open all bids at the stipulated time and place. Bids shall be opened in public; that is, bidders or their representatives shall be allowed to be present. The name of the bidder and total amount of each bid, and of any alternative bids if they have been requested or permitted, shall be read aloud and recorder when opened and a copy of this record shall be promptly sent to the Bank. Bids received after the time stipulated, as well as those not opened and read out at bid opening, shall not be considered.
Clarifications or Alterations of Bids
2.45 Except as otherwise provided in paragraphs 2.61 and 2.62 of these Guidelines, bidders shall not be requested or permitted to alter their bids after the deadline for receipt of bids. The Borrower shall ask bidders for clarification needed to evaluate their bids but shall not ask or permit bidders to change the substance or price of their bids after the bid opening. Requests for clarification and the biddersž responses shall be made in writing.
Confidentiality
2.46 After the public opening of bids, information relating to the examination, clarification, and evaluation of bids and recommendations concerning awards shall not be disclosed to bidders or other persons not officially concerned with this process until the successful bidder is notified of the award.
Examination of Bids
Nastavak dokumenta